ML052420311
| ML052420311 | |
| Person / Time | |
|---|---|
| Site: | Robinson, 07200003 |
| Issue date: | 08/30/2005 |
| From: | NRC/RGN-II/DRP/RPB4 |
| To: | Carolina Power & Light Co |
| Shared Package | |
| ML052420305 | List: |
| References | |
| Download: ML052420311 (2) | |
Text
Robinson Inspection / Activity Plan 09/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2005 07:31:03 Report 22 3
MTN-HEAD - REACTOR HEAD REPLACEMENT Other Routine 09/12/2005 09/15/2005 Reactor Vessel Head Replacement Inspection IP 71007 2
2 EB3-MR
- MR EFFECTIVENESS Baseline Inspections 09/06/2005 09/09/2005 Maintenance Effectiveness IP 7111112B 2
1 PS1-RP
- RP OCCUPATIONAL INSP / HD REPL WK1 Safety Issues 09/18/2005 09/22/2005 Transportation of Reactor Control Rod Drives in Type A Packages IP 2515/161 2
Other Routine 09/18/2005 09/22/2005 Reactor Vessel Head Replacement Inspection IP 71007 2
Baseline Inspections 09/18/2005 09/22/2005 Access Control to Radiologically Significant Areas IP 7112101 2
Baseline Inspections 09/18/2005 09/22/2005 ALARA Planning and Controls IP 7112102 2
Baseline Inspections 09/18/2005 09/22/2005 Performance Indicator Verification IP 71151 2
2 EB3-ISI
- U2 INSERVICE INSPECTION Baseline Inspections 09/27/2005 09/30/2005 Inservice Inspection Activities - PWR IP 7111108P 2
1 PS1-RP
- RP OCCUPATIONAL BASELINE WK2 Baseline Inspections 10/03/2005 10/07/2005 Access Control to Radiologically Significant Areas IP 7112101 2
Baseline Inspections 10/03/2005 10/07/2005 Performance Indicator Verification IP 71151 2
4 EB1-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 01/30/2006 02/03/2006 Evaluation of Changes, Tests, or Experiments IP 7111102 2
Baseline Inspections 01/30/2006 02/03/2006 Permanent Plant Modifications IP 7111117B 2
1 PS1-RP
- RP PREINSPECTION/ ISFSI Baseline Inspections 05/30/2006 06/01/2006 Access Control to Radiologically Significant Areas IP 7112101 2
3 PS1-RP
- RP BASELINE OCCUPATIONAL Baseline Inspections 06/26/2006 06/30/2006 Access Control to Radiologically Significant Areas IP 7112101 2
Baseline Inspections 06/26/2006 06/30/2006 ALARA Planning and Controls IP 7112102 2
Baseline Inspections 06/26/2006 06/30/2006 Radioactive Material Processing and Transportation IP 7112202 2
Baseline Inspections 06/26/2006 06/30/2006 Performance Indicator Verification IP 71151 2
1 PS2-EP
- EP INSP Baseline Inspections 06/26/2006 06/30/2006 Alert and Notification System Testing IP 7111402 2
Baseline Inspections 06/26/2006 06/30/2006 Emergency Response Organization Augmentation Testing IP 7111403 2
Baseline Inspections 06/26/2006 06/30/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 2
Baseline Inspections 06/26/2006 06/30/2006 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 2
Baseline Inspections 06/26/2006 06/30/2006 Performance Indicator Verification IP 71151 2
2 EB3-HS
- HEAT SINK Baseline Inspections 08/14/2006 08/18/2006 Heat Sink Performance IP 7111107B 2
4 DRP/BR4
- PI&R Baseline Inspections 10/02/2006 10/20/2006 Identification and Resolution of Problems IP 71152B 2
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Robinson Inspection / Activity Plan 09/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2005 07:31:03 Report 22 3
OL PREP
- INITIAL EXAM PREP Not Applicable 01/08/2007 01/12/2007 ROBINSON/EXAM AT POWER FACILITIES V23242 2
3 OL EXAM
- INITIAL EXAM Not Applicable 02/05/2007 02/16/2007 ROBINSON/EXAM AT POWER FACILITIES V23242 2
- REQUAL INSPECTION Baseline Inspections 02/26/2007 03/02/2007 Licensed Operator Requalification Program IP 7111111B 2
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.