ML052420311

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan - 09/01/05 - 03/31/07
ML052420311
Person / Time
Site: Robinson, 07200003  Duke Energy icon.png
Issue date: 08/30/2005
From:
NRC/RGN-II/DRP/RPB4
To:
Carolina Power & Light Co
Shared Package
ML052420305 List:
References
Download: ML052420311 (2)


Text

Page 1 of 2 Robinson 08/30/2005 07:31:03 Inspection / Activity Plan Report 22 09/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type MTN-HEAD - REACTOR HEAD REPLACEMENT 3 2 IP 71007 Reactor Vessel Head Replacement Inspection 09/12/2005 09/15/2005 Other Routine EB3-MR - MR EFFECTIVENESS 2 2 IP 7111112B Maintenance Effectiveness 09/06/2005 09/09/2005 Baseline Inspections PS1-RP - RP OCCUPATIONAL INSP / HD REPL WK1 1 2 IP 2515/161 Transportation of Reactor Control Rod Drives in Type A Packages 09/18/2005 09/22/2005 Safety Issues 2 IP 71007 Reactor Vessel Head Replacement Inspection 09/18/2005 09/22/2005 Other Routine 2 IP 7112101 Access Control to Radiologically Significant Areas 09/18/2005 09/22/2005 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 09/18/2005 09/22/2005 Baseline Inspections 2 IP 71151 Performance Indicator Verification 09/18/2005 09/22/2005 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 2 2 IP 7111108P Inservice Inspection Activities - PWR 09/27/2005 09/30/2005 Baseline Inspections PS1-RP - RP OCCUPATIONAL BASELINE WK2 1 2 IP 7112101 Access Control to Radiologically Significant Areas 10/03/2005 10/07/2005 Baseline Inspections 2 IP 71151 Performance Indicator Verification 10/03/2005 10/07/2005 Baseline Inspections EB1-MODS - MODIFICATIONS/10CFR50.59 4 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 01/30/2006 02/03/2006 Baseline Inspections 2 IP 7111117B Permanent Plant Modifications 01/30/2006 02/03/2006 Baseline Inspections PS1-RP - RP PREINSPECTION/ ISFSI 1 2 IP 7112101 Access Control to Radiologically Significant Areas 05/30/2006 06/01/2006 Baseline Inspections PS1-RP - RP BASELINE OCCUPATIONAL 3 2 IP 7112101 Access Control to Radiologically Significant Areas 06/26/2006 06/30/2006 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 06/26/2006 06/30/2006 Baseline Inspections 2 IP 7112202 Radioactive Material Processing and Transportation 06/26/2006 06/30/2006 Baseline Inspections 2 IP 71151 Performance Indicator Verification 06/26/2006 06/30/2006 Baseline Inspections PS2-EP - EP INSP 1 2 IP 7111402 Alert and Notification System Testing 06/26/2006 06/30/2006 Baseline Inspections 2 IP 7111403 Emergency Response Organization Augmentation Testing 06/26/2006 06/30/2006 Baseline Inspections 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 06/26/2006 06/30/2006 Baseline Inspections 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 06/26/2006 06/30/2006 Baseline Inspections 2 IP 71151 Performance Indicator Verification 06/26/2006 06/30/2006 Baseline Inspections EB3-HS - HEAT SINK 2 2 IP 7111107B Heat Sink Performance 08/14/2006 08/18/2006 Baseline Inspections DRP/BR4 - PI&R 4 2 IP 71152B Identification and Resolution of Problems 10/02/2006 10/20/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Robinson 08/30/2005 07:31:03 Inspection / Activity Plan Report 22 09/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL PREP - INITIAL EXAM PREP 3 2 V23242 ROBINSON/EXAM AT POWER FACILITIES 01/08/2007 01/12/2007 Not Applicable OL EXAM - INITIAL EXAM 3 2 V23242 ROBINSON/EXAM AT POWER FACILITIES 02/05/2007 02/16/2007 Not Applicable OL RQ - REQUAL INSPECTION 2 2 IP 7111111B Licensed Operator Requalification Program 02/26/2007 03/02/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.