Harris Inspection / Activity Plan 09/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2005 07:30:08 Report 22 3
OL PREP
- INITIAL EXAM PREP Not Applicable 01/09/2006 01/13/2006 HARRIS/EXAMS AT POWER FACILITIES V23233 1
3 OL EXAM
- INITIAL EXAM Not Applicable 01/23/2006 02/03/2006 HARRIS/EXAMS AT POWER FACILITIES V23233 1
4 EB1-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 02/06/2006 02/10/2006 Evaluation of Changes, Tests, or Experiments IP 7111102 1
Baseline Inspections 02/06/2006 02/10/2006 Permanent Plant Modifications IP 7111117B 1
1 PS1-RP
- RP OCCUPATIONAL PRE-INSP VISIT Baseline Inspections 03/13/2006 03/15/2006 Access Control to Radiologically Significant Areas IP 7112101 1
1 PS2-EP
- EP INSP Baseline Inspections 04/03/2006 04/07/2006 Alert and Notification System Testing IP 7111402 1
Baseline Inspections 04/03/2006 04/07/2006 Emergency Response Organization Augmentation Testing IP 7111403 1
Baseline Inspections 04/03/2006 04/07/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 1
Baseline Inspections 04/03/2006 04/07/2006 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1
Baseline Inspections 04/03/2006 04/07/2006 Performance Indicator Verification IP 71151 1
3 PS1-RP
- RP OCCUPATIONAL INSP WK1 Baseline Inspections 04/10/2006 04/14/2006 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 04/10/2006 04/14/2006 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 04/10/2006 04/14/2006 Radioactive Material Processing and Transportation IP 7112202 1
Baseline Inspections 04/10/2006 04/14/2006 Performance Indicator Verification IP 71151 1
2 EB3-ISI
- INSERVICE INSPECTION Baseline Inspections 04/17/2006 04/21/2006 Inservice Inspection Activities - PWR IP 7111108P 1
1 EB3TI150
- 2515/150 : RPV & VHP NOZZLES Safety Issues 04/17/2006 04/21/2006 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA IP 2515/150 1
3 PS1-RP
- RP OCCUPATIONAL INSP WK2 Baseline Inspections 04/24/2006 04/28/2006 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 04/24/2006 04/28/2006 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 04/24/2006 04/28/2006 Radioactive Material Processing and Transportation IP 7112202 1
Baseline Inspections 04/24/2006 04/28/2006 Performance Indicator Verification IP 71151 1
1 EB3SGISI
- STEAM GENERATOR ISI Baseline Inspections 04/24/2006 04/28/2006 Inservice Inspection Activities - PWR IP 7111108P 1
2 EB3-MR
- MR EFFECTIVENESS Baseline Inspections 06/26/2006 06/30/2006 Maintenance Effectiveness IP 7111112B 1
5 EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 08/07/2006 08/11/2006 Safety System Design and Performance Capability IP 7111121 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Harris Inspection / Activity Plan 09/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2005 07:30:08 Report 22 5
EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 10/02/2006 10/06/2006 Safety System Design and Performance Capability IP 7111121 1
Baseline Inspections 10/16/2006 10/20/2006 Safety System Design and Performance Capability IP 7111121 1
Baseline Inspections 10/30/2006 11/03/2006 Safety System Design and Performance Capability IP 7111121 1
1 PSB1-RP
- RP PUBLIC PRE - INSP VISIT Baseline Inspections 12/18/2006 12/20/2006 Access Control to Radiologically Significant Areas IP 7112101 1
4 PSB1-RP
- RP PUBLIC INSPECTION Baseline Inspections 01/22/2007 01/26/2007 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 01/22/2007 01/26/2007 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1
Baseline Inspections 01/22/2007 01/26/2007 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1
Baseline Inspections 01/22/2007 01/26/2007 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P IP 7112203 1
- REQUAL INSPECTION Baseline Inspections 03/19/2007 03/23/2007 Licensed Operator Requalification Program IP 7111111B 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.