August 30, 2005 Mr. M. Nazar Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN-DONALD C. COOK NUCLEAR POWER PLANT
Dear Mr. Nazar:
On August 9, 2005, the NRC staff completed its performance review of the Donald C. Cook Nuclear Power Plant for the first half of the calendar year 2005 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and a resultant inspection plan.
Plant performance for Unit 1 for the most recent quarter was within the Licensee Response column of the NRCs Action Matrix based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only reactor oversight process (ROP) baseline inspections at your facility through March 31, 2007.
Plant performance for Unit 2 for the most recent quarter was within the Regulatory Response column of the NRCs Action Matrix based on one White PI in the Scrams With Loss of Normal Heat Removal area of the Initiating Events cornerstone. Otherwise, all inspection findings were classified as having very low safety significance (Green) and all PIs indicated performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only ROP baseline inspections at your facility through March 31, 2007.
M. Nazar Additionally, on September 29, 2004, the NRC issued a Severity Level III violation when a licensed operator with a potentially disqualifying medical condition was not reported to the NRC as required. Subsequently, following your implementation of corrective actions to address this issue, the NRC staff identified an additional individual with a potentially disqualifying medical condition that was not reported to the NRC as required. We will continue to monitor your actions in response to this issue.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2007. Significant inspections planned for this year include a Safety System Design and Performance Inspection in September 2005, a Biennial Heat Sink Inspection in October 2005, a Triennial Fire Protection Inspection in January 2006, a Modification/50.59 Inspection in May 2006, and a Biennial Problem Identification and Resolution Inspection in July 2006. The inspection plan is provided to minimize the resource impact on your staff and to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Eric Duncan at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Mark A. Satorius, Director Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74
Enclosure:
D. C. Cook Nuclear Power Plant Inspection/Activity Plan See Attached Distribution
DOCUMENT NAME:G:\\Branch TSS\\ALL MOC\\midcycle 2004 to 2005\\MOC letters\\cook.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME RLerch for EDuncan:dtp MSatorius DATE 08/29/05 08/29/05 OFFICIAL RECORD COPY
M. Nazar cc w/encl:
J. Jensen, Site Vice President L. Weber, Plant Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality -
Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police D. Lochbaum, Union of Concerned Scientists Berrien County Board Chairman Berrien County Coordinator Berrien County Sheriff Coordinator, Berrien County Emergency Management Agency Mayor of Benton Harbor City Manager Mayor of St. Joseph City Manager Mayor of Bridgman City Manager Mayor of Buchanan City Manager President, Village of Stevensville President, Village of Berrien Springs President, Village of Shoreham INPO
M. Nazar ADAMS Distribution:
HKN CFL DWW Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb JLC1 GEG KGO RML2 SRI Cook DRPIII DRSIII PLB1 JRK1
D.C. Cook Inspection / Activity Plan 09/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/29/2005 11:00:33 Report 22 6
SSDPC
- SAFETY SYSTEM DESIGN & PERFORMANCE Baseline Inspections 09/05/2005 09/23/2005 Safety System Design and Performance Capability IP 7111121 1, 2 1
HEATSKB
- BIENNIAL HEAT SINK INSPECTION Baseline Inspections 10/03/2005 10/07/2005 Heat Sink Performance IP 7111107B 1, 2 2
7111401
- EP EXERCISE & EP PI INSP Baseline Inspections 09/19/2005 09/23/2005 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 09/19/2005 09/23/2005 Performance Indicator Verification IP 71151 1, 2 1
7112103
- RADIOLOGICAL INSTRUMENTATION Baseline Inspections 01/09/2006 01/13/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 3
FPI
- FIRE PROTECTION INSPECTION TRIENNIAL Baseline Inspections 01/23/2006 02/10/2006 Fire Protection [Triennial]
IP 7111105T 1, 2 3
FY 2006
- D. C. COOK INIT PREP 01/2006 Not Applicable 01/16/2006 01/20/2006 OL - INITIAL EXAM - D.C. COOK - JAN/FEB 2006 W90130 1
3 FY 2006
- D. C. COOK INIT EXAM 02/2006 Not Applicable 02/06/2006 02/17/2006 OL - INITIAL EXAM - D.C. COOK - JAN/FEB 2006 W90130 1
2 71111.11
- LIC OPERATOR REQUAL PROGRAM EVALUATION Baseline Inspections 03/06/2006 03/10/2006 Licensed Operator Requalification Program IP 7111111B 1, 2 2
- D.C. COOK UNIT 2 ISI INSPECTION Baseline Inspections 03/27/2006 04/21/2006 Inservice Inspection Activities - PWR IP 7111108P 1
2 7112102
- ALARA (OUTAGE)
Baseline Inspections 04/03/2006 04/07/2006 ALARA Planning and Controls IP 7112102 1, 2 1
- EP NON-EXERCISE BASELINE Baseline Inspections 04/17/2006 04/21/2006 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 04/17/2006 04/21/2006 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 04/17/2006 04/21/2006 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 04/17/2006 04/21/2006 Performance Indicator Verification IP 71151 1, 2 2
MOD/5059
- MODIFICATION/50.59 INSPECTION Baseline Inspections 05/08/2006 05/26/2006 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 05/08/2006 05/26/2006 Permanent Plant Modifications IP 7111117B 1, 2 3
- PI&R BIENNIAL Baseline Inspections 07/24/2006 08/18/2006 Identification and Resolution of Problems IP 71152B 1, 2 1
MAINT
- MAINTENANCE EFFECTIVENESS Baseline Inspections 07/17/2006 07/21/2006 Maintenance Effectiveness IP 7111112B 1, 2 1
7112101
- RADIOLOGICAL ACCESS CONTROL Baseline Inspections 08/07/2006 08/11/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
D.C. Cook Inspection / Activity Plan 09/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/29/2005 11:00:33 Report 22 1
7112101
- RADIOLOGICAL ACCESS CONTROL Baseline Inspections 08/07/2006 08/11/2006 Performance Indicator Verification IP 71151 1, 2 5
- D.C. COOK U1 ISI & RPV HD FAB/MOD INSP Other Routine 09/11/2006 11/03/2006 Reactor Vessel Head Replacement Inspection IP 71007 1
Baseline Inspections 09/11/2006 11/03/2006 Evaluation of Changes, Tests, or Experiments IP 7111102 1
Baseline Inspections 09/11/2006 11/03/2006 Permanent Plant Modifications IP 7111117B 1
Baseline Inspections 10/09/2006 11/03/2006 Inservice Inspection Activities - PWR IP 7111108P 1
1 7112202
- TRANSPORTATION & RADWASTE Baseline Inspections 10/30/2006 11/03/2006 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 10/30/2006 11/03/2006 Performance Indicator Verification IP 71151 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.