August 25, 2005 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

MILLSTONE POWER STATION, UNIT NO. 3 - CHANGES TO THE TECHNICAL SPECIFICATIONS BASES (TAC NO. MC8076)

Dear Mr. Christian:

By letter dated May 31, 2005, Dominion Nuclear Connecticut, Inc. (DNC) provided the Nuclear Regulatory Commission (NRC) with changes to Technical Specifications (TSs) Bases Sections 2.2.1, 3/4, and 3/4.1 through 3/4.9. DNC provided the TSs Bases pages to the NRC for information only.

The TSs Bases are not part of the TSs as defined by Title 10 of the Code of Federal Regulations (10 CFR) Section 50.36. Changes to the TSs Bases may be made without prior NRC approval, provided the changes do not require either a change in the TSs incorporated in the license or a change to the Updated Final Safety Analysis Report or Bases that require NRC approval pursuant to 10 CFR 50.59.

The TSs Bases you provided are enclosed and should be inserted in the TSs to ensure the NRC staff and DNC have identical TSs Bases pages. The NRC staff did not perform an evaluation of your TSs bases changes and staff concurrence with the changes is not implied by this letter. The NRC staff may review the evaluations that support these TSs Bases changes during the inspection of Millstone Power Station, Unit No. 3 implementation of 10 CFR 50.59.

Sincerely,

/RA/

George F. Wunder, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-423

Enclosures:

As stated cc w/encls: See next page

ML52270399 OFFICE PDI-2/PM PDI-2/LA PDI-2/SC NAME GWunder CRaynor DRoberts DATE 8/22/05 8/19/05 8/25/05 Millstone Power Station, Unit No. 3 cc:

Lillilan M. Cuoco, Esquire Mr. Joseph Roy, Senior Counsel Director of Operations Dominion Resources Services, Inc. Massachusetts Municipal Wholesale Building 475, 5th Floor Electric Company Rope Ferry Road Moody Street Waterford, CT 06385 P.O. Box 426 Ludlow, MA 01056 Edward L. Wilds, Jr., Ph.D.

Director, Division of Radiation Mr. J. Alan Price Department of Environmental Protection Site Vice President 79 Elm Street Dominion Nuclear Connecticut, Inc.

Hartford, CT 06106-5127 Building 475, 5th Floor Rope Ferry Road Regional Administrator, Region I Waterford, CT 06385 U.S. Nuclear Regulatory Commission 475 Allendale Road Mr. Chris Funderburk King of Prussia, PA 19406 Director, Nuclear Licensing and Operations Support First Selectmen Dominion Resources Services, Inc.

Town of Waterford 5000 Dominion Boulevard 15 Rope Ferry Road Glen Allen, VA 23060-6711 Waterford, CT 06385 Mr. David W. Dodson Mr. John Markowicz Licensing Supervisor Co-Chair Dominion Nuclear Connecticut, Inc.

Nuclear Energy Advisory Council Building 475, 5th Floor 9 Susan Terrace Rope Ferry Road Waterford, CT 06385 Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, CT 06070 Senior Resident Inspector Millstone Power Station c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT 06357 Ms. Nancy Burton 147 Cross Highway Redding Ridge, CT 00870