  • - .- -o UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

+ + + + +

HEADQUARTERS OPERATIONS CENTER

.+ + + + +

TELEPHONE CONVERSATION(S)

RE MILLSTONE ALERT DECLARATION OF APRIL 17, 2005

+ + + + +

EVENT NO. 41607 HO02, Tape 1, Side B, 11:27-15:58 tl n i t is reo rd was deleted l~iorfi in accordance wIth the Freedom of Inflt FAlA-PoLOYs (45, FLV 62 1 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(9091 2.U44433 WASHINCGTON nfr nnnl.-'7nl (2{n2 244433

39 I kt

'f ' .

1 I ;sc

1. :J I';

2 3

4 (TELEPHONE DIAL TONE. TELEPHONE 5 RECORDING: "Transferring.")

6 MR. GOTT: NRC Ops Center. This is a 7 recorded line.

8 MR. DODSON: Yes, this is Dave Dodson at 9 the Millstone Station.

10 MR. GOTT: Yes, sir?

11 MR. DODSON: I am the Station Licensee 12 Supervisor. We are in an alert here at the station.

13 You may or may not be aware of that?

14 MR. GOTT: Yes, sir, we are aware.

15 MR. DODSON: Alright. I have an NRC Event 16 Notification form to cover the reporting details that 17 are necessary under 5072.

18 MR. GOTT: So this is a follow-up to the 19 other one?

20 MR. GOTT: Which one did you receive?

21 MR. DODSON: Hold on a second. Well, we -

22 - hold on a second. We received a call in for the 23 alert from Millstone Unit 3.

24 MR. GOTT (phonetic): Yes, this would be a 25 follow-up to that. And we have -- but we have not NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

M91,;E45 n1909 9.U4433 WASHIN.TON n r Pnnn.f5.7n1

40 I received a fax form and we were hoping to get that.

2 MR. DODSON: And this is for Event Number 3 41607?

4 MR. GOTT: Let me see - let me call up the 5 event.

6 MR. DODSON: Okay.

7 MR. GOTT: I have been running these other 8 things here. Let me see. 41607.

9 MR. DODSON: That is correct, yes.

10 MR. GOTT: So this is an update to 41607?

11 MR. DODSON: Yes, it is.

12 MR. GOTT: Okay. You are calling in at 13 1328. Could I get your name again, sir?

14 MR. DODSON: My name is David Dodson.

15 MR. GOTT: David Dodson.

16 MR. DODSON: D-O-D, as in "David," S-0-N.

17 MR. GOTT: Okay, sir. And ybur update is 18 what?

19 MR. DODSON: Hang on one second. We are 20 reporting, under the Event Classification, an alert, 21 also a 5072 Non-Emergency Report.

22 MR. GOTT: Okay.

23 MR. DODSON: Under the column "4-hour Non-24 Emergency Events," we have checked "ECCS discharge 25 into the RCS."

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

1=01 234-4433 WASHINGTON l r Pnon.25-7fl1 I901914-.441.t

41 1 MR. GOTT: ECCS discharge into the RCS?

2 MR. DODSON: That is correct. And also, 3 under RPS actuation.

4 MR. GOTT: And RPS actuation.

5 MR. DODSON: That is correct.

6 MR. GOTT: Okay.

7 MR. DODSON: And I could read you a 8 summary of the event.

9 MR. SANDIN: If you could, please, sir.

10 MR. GOTT: "At approximately 0830 on April 11 17, 2005, Millstone Unit 3 experienced an automatic 12 reactor trip from full power. The reactor is in a 13 stable shut-down condition and is proceeding to Mode 5 14 Cold Shut-Down. No release of radioactivity, other 15 than those minor releases associated with normal plant 16 operation has occurred. There were no personnel 17 injuries associated with the event. In addition to 18 the reactor trip, half-train safety injection had 19 half-train main steam isolation actuations occurred.

20 The Control Room personnel were successful at manually 21 initiating full SI and MSI." That is the safety 22 injection and main steam isolation signals. "The 23 Safety injection has since been terminated and RCS 24 pressure control has been restored. Multiple steam 25 line safety valves lifted, with at least one main NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.

t9n7l 24-4411 WASHINGsTON rl r 2nnnzi-17n (,nt 72.14-44.3

42 1 steam line safety valve indicating a failure to 2 reclose. As a result, an alert was declared at 3 approximately 0853, due to the failure of at least one 4 main steam safety valve to close. All main steam 5 safety valves are currently closed. Auxiliary feed 6 were actuated automatically as expected, however, the 7 turbine-driven auxiliary feed water pump tripped on 8 start-up and was subsequently reset locally. Both 9 motor-driven auxiliary feed water pumps operated as 10 expected to maintain steam generator water levels.

11 Due to the additional inventory injected into the 12 reactor coolant system as a result of the safety 13 injection actuation, the pressurizer filled and a 14 primary system safety valve actuated at a lower than 15 expected pressure. All primary safety valves are 16 currently closed. However, this is indication of 17 leakage past either a primary safety valve or a pilot is operated relief valve. Upon alignment of the charging 19 system to the refueling water storage tank re-20 circulation flow path, two valves had indication of 21 packing leakage. Those packing leaks have been 22 terminated. The cause of the event is under 23 investigation."

24 MR. GOTT: Okay. Is that it?

25 MR. DODSON: That is it.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

9nA7234-4433 WASHINr.TnN rl C gonn.5-37M1 M2?.U4-4413

43 1 MR. GOTT: And the Resident has been 2 informed?

3 MR. DODSON: I have not spoken with the 4 resident. The Resident is in the Control Room at this 5 point in time and is aware of these details, though.

6 Okay.

7 MR. GOTT: Are you also reporting this as a 8 specified system actuation? The 8-hour B(3)4 Alpha?

9 MR. DODSON: You know, I did not look at 10 that, but yes, that would be applicable as well.

11 MR. GOTT: That is. I will mark that on 12 my sheet.

13 MR. DODSON: Yes.

14 MR. GOTT: Okay. And for the RPS 15 actuation, all control rods went --

16 MR. DODSON: Fully inserted.

17 MR. GOTT: -- fully inserted. And they are 18 removing the decay heat (phonetic) now through the 19 condenser?

20 MR. DODSON: I do not have that 21 information.

22 MR. GOTT: Okay. Alright then.

23 MR. DODSON: I believe that is the case, 24 but I do not have confirmation of that.

25 MR. GOTT: Okay. Then I will not put that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

A21 934-441. WASHINGTON nf C.r9ffn5-701 MMn, 9.44Z3

44 1 down.

2 MR. DODSON: We can put that -- we will 3 put that in an update.

4 MR. GOTT: Okay. Anything unusual or not 5 understood other than what you told me?

6 MR. DODSON: At this point, no.

7 MR. GOTT: Okay. All systems function as 8 required, other than what you described above?

9 MR. DODSON: That is correct, to the best 10 of my understanding. Okay.

ii. MR. DODSON: Your name is, again?

12 MR. GOTT: Oh, I am sorry. Bill Gott, G-13 O-T-T.

14 MR. DODSON: Okay, Bill Gott.

15 MR. GOTT: I was wondering if you could 16 fax that sheet to me.

17 MR. DODSON: Certainly. I am going to fax 18 you three pages.

19 MR. GOTT: Okay.

20 MR. DODSON: And it is what we call 21 "Attachment 8" which is our NRC Event Notification 22 form. That has two sheets and there will - the third 23 sheet will be the attachment that I just read to you.

24 MR. GOTT (phonetic): Okay. And you have 25 our fax number?

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

O^nsv).U-4dos WASIHlNr.TrN n.r 20005.37ni M 97~l.U443A

45 1 MR. DODSON: I have a fax number that is 2 301/816-5151.

3 MR. GOTT: That is correct.

4 MR. DODSON: I understand that is correct.

5 MR. GOTT (phonetic): Are you making any 6 press releases on this?

7 MR. DODSON: We have made one press 8 release at this point. We did fax a package of our 9 Incident Response forms and press releases, I believe, 10 to the Response Center.

11 MR. GOTT: At the Region, the Regional 12 Response Center?

13 MR. DODSON: Region or?

14 MR. PARTICIPANT: Region.

15 MR. DODSON: At the Region, yes.

16 MR. GOTT: Okay. If it is not too hard, 17 could you fax a copy of those up to here also?

18 MR. DODSON: We can include a copy of 19 those documents in this fax as well.

20 MR. GOTT: Okay. I would appreciate it.

21 Is there anything else?

22 MR. DODSON: That is all.

23 MR. GOTT: Okay. Thank you, sir.

24 MR. DODSON: You are welcome.

25 MR. GOTT: Bye.

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

n202A24-44.3 WAS-HIINCTN n C. Pnon.l5.701 OM P.U-44433

46 1 MR. DODSON: So long.

A 4

5 6

7 8

9 01 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 NEAL R. GROSSvaY COURT REPORTERS AND TRANSCRIBERS F

1323 RHODE ISLAND AVE., N.W.

(MI~ 234-44x1 WASHINGTON n r. 9nn.5-37nl ({2nel P4.44'3

51 1 MR. REIS (phonetic): Bye.

2 MR. GOTT: NRC Ops Center. This is a 3 recorded line.

4 MR. MAGNAN (PHONETIC): Yes, this is Kevin 5 Maggin, (inaudible).

6 MR. GOTT: Yes, sir.

7 MR. MAGNAN (phonetic): I wonder if you 8 could put me on the ET Bridge.

9 MR. SANDIN: On the ET Bridge? Okay.

10 (TELEPHONE DIAL TONE. TELEPHONE 11 RECORDING: "Transferring.)

12 MR. GOTT (phonetic: NRC Ops Center. This 13 is a recorded line.

14 MR. WATSON: Yes, this is Bill Watson from 15 Millstone Power Station. Whom am I speaking with?

16 MR. GOTT: This is the Headquarters 17 Operations Officer.

18 MR. WATSON: Okay. I did not -- I am 19 supposed to get a name --

20 MR. GOTT: Oh, Bill Gott, G-O-T-T.

21 MR. WATSON: Oh, okay, Bill. That is whom 22 I was going to ask for anyway. Okay. I am helping 23 David Dodson out at the Millstone Power Station.

24 With the event, and we had sent you a fax, 25 nine pages. I understand it came through kind of, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.

(20 234.4433. WASIHINCTnN nf POMS-3l.37A1 234433 42

52 1 kind of ugly and hard to read and so I was asked to 2 send it again. I sent it again. I do not know if it 3 came through clean.

4 MR. GOTT: It came through clean.

s MR. WATSON: It did, okay.

6 MR. GOTT: It did.

7 MR. WATSON: So you do not need an 8 electronic copy sent to you?

9 MR. GOTT: No, sir.

10 MR. WATSON: Okay, thank you very much.

11 MR. GOTT: Yes, sir.

12 NRC Ops Center. This is a recorded line.

13fP 14

16. iw 170 19 20 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS t14*-

1323 RHODE ISLAND AVE., N.W.