ML052210392

From kanterella
Jump to navigation Jump to search
NRC Final Exam Results Ltr. W/O Encl. Dtd 7/21/05 (Folder 1)
ML052210392
Person / Time
Site: Peach Bottom, Limerick  Constellation icon.png
Issue date: 07/21/2005
From: Conte R
Operations Branch I
To: Jason White
Exelon Generation Co
Conte R
References
Download: ML052210392 (3)


Text

July 21, 2005 Mr. Joseph White Director of Training Exelon Generation Company Limerick Generating Station 3146 Sanatoga Road Pottstown, PA 19464

Dear Mr. White:

The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on June 15, 2005, and the walkthrough (overall) operating tests administered June 13-14, 2005 at your facility. This meets the intent of section E.1 of the Examiner Standards (ES 501) in NUREG 1021. Three individuals were administered the examination and all passed. However, as explained in paragraph D.3.c of Examination Standard (ES) 501 in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, we will not issue these licenses until you certify in writing to the U.S. Nuclear Regulatory Commission that they have acquired all of the training and experience for which they were previously granted waivers. This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398.

Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5183.

Sincerely,

/RA/

Richard J. Conte, Chief Operations Branch Division of Reactor Safety Limerick Docket Nos. 50-352/50-353 Peach Bottom Docket Nos. 50-277/50-278 Limerick License Nos. NPF-39, NPF-85 Peach Bottom Docket Nos. DPR-44, DPR-56

Mr. Joseph White

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Examination Results cc w/o

Enclosures:

R. J. DeGregorio, Vice President, LGS R. C. Braun, Vice President, PB J. Popielarski, Manager, Operations Training, PB

Mr. Joseph White Distribution: w/o enclosures:

Master Exam File DOCUMENT NAME:

E:\Filenet\ML052210392.wpd ADAMS PACKAGE: ML042440215 SISP Review Complete: ______RJC_(Reviewers Initials)

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler /RA/ JGCaruso RJConte /RA/

/RA/

DATE 07/19/2005 07/20/05 07/21/05 OFFICIAL RECORD COPY