August 11, 2005 Mr. Michael G. Gaffney Site Vice President Kewaunee Power Station Dominion Energy Kewaunee, Inc.

N490 Highway 42 Kewaunee, WI 54216-9511

SUBJECT:

KEWAUNEE POWER STATION - WITHDRAWAL OF AN AMENDMENT (TAC NO. MC3337)

Dear Mr. Gaffney:

By letter to the Nuclear Regulatory Commission (NRC) dated June 1, 2004, you applied for an amendment to the Kewaunee Power Station, Facility Operating License No. DPR-43. The proposed amendment would have modified the Technical Specifications (TSs) to revise TS 1.0, Definitions, Table 3.5-2, Instrument Operation Conditions for Reactor Trip, and Table 4.1-1, Minimum Frequencies for Checks, Calibrations, and Test of Instrument Channels, proposed to change the requirement to perform the channel test and channel calibration once per operating cycle. The proposed changes would have added a definition for staggered test basis, increase surveillance test intervals for the analog channels and logic cabinets of the reactor protection system and engineered safety featured actuation system, and would have added a completion time for the reactor trip breakers. Subsequently, by letter dated August 4, 2005, you withdrew the amendment request.

The NRC has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely,

/RA/

John F. Stang, Senior Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-305

Enclosure:

Notice of Withdrawal cc w/encl: See next page

ML052160322 OFFICE PM:PDIII-1 LA:PDIII-1 SC:PDIII-1 NAME JStang DClarke for THarris LRaghavan DATE 08/16/05 08/09/05 08/11/05 Kewaunee Power Station cc:

Resident Inspectors Office Ms. Lillian M. Cuoco, Esq.

U.S. Nuclear Regulatory Commission Senior Counsel N490 Hwy 42 Dominion Resources Services, Inc.

Kewaunee, WI 54216-9510 Millstone Power Station Building 475, 5th Floor Regional Administrator Rope Ferry Road Region III Waterford, CT 06385 U.S. Nuclear Regulatory Commission 801 Warrenville Road Plant Manager Lisle, IL 60532-4351 Kewaunee Power Station N490 Highway 42 David Zellner Kewaunee, WI 54216-9511 Chairman - Town of Carlton N2164 County B Kewaunee, WI 54216 Mr. Jeffery Kitsembel Electric Division Public Service Commission of Wisconsin PO Box 7854 Madison, WI 53707-7854 Mr. Michael G. Gaffney Dominion Energy Kewaunee, Inc.

Kewaunee Power Station N490 Hjghway 42 Kewaunee, WI 54216 Mr. Chris L. Funderburk Director, Nuclear Licensing and Operations Support Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. Thomas L. Breene Dominon Energy Kewaunee, Inc.

Kewaunee Power Station N490 Hjghway 42 Kewaunee, WI 54216

7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION DOMINION ENERGY KEWAUNEE, INC.

DOCKET NO. 50-305 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has granted the request of Dominion Energy Kewaunee, Inc., (the licensee) to withdraw its June 1, 2004, application for proposed amendment to Facility Operating License No. DPR-43 for the Kewaunee Nuclear Plant, located in Kewaunee County, Wisconsin.

The proposed amendment would have modified the Technical Specifications (TS) to revise TS 1.0, Definitions, Table 3.5-2, Instrument Operation Conditions for Reactor Trip, and Table 4.1-1, Minimum Frequencies for Checks, Calibrations, and Test of Instrument Channels, proposed to change the requirement to perform the channel test and channel calibration once per operating cycle. The proposed changes would have added a definition for staggered test basis, increase surveillance test intervals for the analog channels and logic cabinets of the reactor protection system and engineered safety featured actuation system, and would have added a completion time for the reactor trip breakers. Subsequently, by letter date August 4, 2005, you withdrew the amendment request. The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on July 6, 2004 (69 FR 40676). However, by letter dated August 4, 2005, the licensee withdrew the proposed amendment.

For further details with respect to this action, see the application for amendment dated June 1, 2004, and the licensee's letter dated August 4, 2005, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRCs

Public Document Room (PDR), located at One White Flint North, Public File Area 01 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams/html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr@nrc.gov.

Dated at Rockville, Maryland, this 11th day of August 2005.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

L. Raghavan, Chief, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation