TABLE OF CONTENTS (TECHNICAL SPECIFICATIONS) 1.0 USE AND APPLICATION.................................................
1.1-1 1.1 Definitions.................................................
1.1-1 1.2 Logical Connectors................................................. 1.2-1 1.3 Completion Times.................................................
1.3-1 1.4 Frequency.................................................
1.4-1 2.0 SAFETY LIMITS (SLs)................................................... TS/2.0-1 2.1 SLs.................................................
TS/2.0-1 2.2 SL Violations.................................................
TS/2.0-1 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY.............. 3.0-1 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY....................... TS/3.0-4 3.1 REACTIVITY CONTROL SYSTEMS.................................................
3.1-1 3.1.1 Shutdown Margin (SDM).................................................
3.1-1 3.1.2 Reactivity Anomalies.................................................
3.1-5 3.1.3 Control Rod OPERABILITY..........................
....................... 3.1-7 3.1.4 Control Rod Scram Times.....................
............................ 3.1-12 3.1.5 Control Rod Scram Accumulators................................................. 3.1-15 3.1.6 Rod Pattern Control................................................. 3.1-18 3.1.7 Standby Liquid Control (SLC) System............................................... 3.1-20 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves.............. TS/3.1-25 3.2 POWER DISTRIBUTION LIMITS.................................................
3.2-1 3.2.1 Average Planar Linear Heat Generation Rate (APLHGR)..........
....... 3.2-1 3.2.2 Minimum Critical Power Ratio (MCPR).............................................. 3.2-3 3.2.3 Linear Heat Generation Rate (LHGR)............................................... 3.2-5 3.2.4 Average Power Range Monitor (APRM) Gain and Setpoints............. 3.2-7 3.3 INSTRUMENTATION................................................. 3.3-1 3.3.1.1 Reactor Protection System (RPS) Instrumentation............................ 3.3-1 3.3.1.2 Source Range Monitor (SRM) Instrumentation.................................. 3.3-10 3.3.1.3 Oscillation Power Range Monitor (OPRM)
Instrumentation........................
TS/3.3-15a 3.3.2.1 Control Rod Block Instrumentation........................
3.3-16 3.3.2.2 Feedwater - Main Turbine High Water Level Trip Instrumentation...................................
3.3-21 3.3.3.1 Post Accident Monitoring (PAM) Instrumentation............................... 3.3-23 3.3.3.2 Remote Shutdown System...................................
3.3-26 3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT)
Instrumentation..
3.3-29 3.3.4.2 Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT) Instrumentation....................................
3.3-33 3.3.5.1 Emergency Core Cooling System (ECCS) Instrumentation............... 3.3-36 3.3.5.2 Reactor Core Isolation Cooling (RCIC) System Instrumentation....................................
3.3-48 3.3.6.1 Primary Containment Isolation Instrumentation............................. TS/3.3-52 3.3.6.2 Secondary Containment Isolation Instrumentation............................
3.3-63 (continued)
SUSQUEHANNA - UNIT 1 TS / TOC - 1 Amendrmet A-4, 2A15, 2I7, 222
PPL Rev. 1 SDV Vent and Drain Valves 3.1.8 3.1 REACTIVITY CONTROL SYSTEMS 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves LCO 3.1.8 Each SDV vent and drain valve shall be OPERABLE and open.
APPLICABILITY:
MODES 1 and 2.
ACTIONS
NOTES-----------------------------------------------------
- 1.
Separate Condition entry is allowed for the SDV vent line and drain line.
- 2.
An isolated line may be unisolated under administrative control to allow draining and venting of the SDV.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more SDV vent or A.1 Isolate the associated line.
7 days drain lines with one valve inoperable.
B. One or more SDV vent or B.1 Isolate the associated line.
8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> drain lines with both valves inoperable.
C. Required Action and C.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
SUSQUEHANNA - UNIT 1 TS /3.1-25 Amendment U8, 222
TABLE OF CONTENTS (TECHNICAL SPECIFICATIONS) 1.0 USE AND APPLICATION..................................................
1.1-1 1.1 Definitions..................................................
1.1-1 1.2 Logical Connectors..................................................
1.2-1 1.3 Completion Times.................................................
1.3-1 1.4 Frequency..................................................
1.4-1 2.0 SAFETY LIMITS (SLs).................................................... TS/2.0-1 2.1 SLs...................................................
TSJ2.0-1 2.2 SL Violations.................................................
TS /2.0-1 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY.............. 3.0-1 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY....................... TS/3.0-4 3.1 REACTIVITY CONTROL SYSTEMS.................................................
3.1-1 3.1.1 Shutdown Margin (SDM).................................................
3.1-1 3.1.2 Reactivity Anomalies.................................................
3.1-5 3.1.3 Control Rod OPERABILITY............................
..................... 3.1-7 3.1.4 Control Rod Scram Times..................................................
3.1-12 3.1.5 Control Rod Scram Accumulators.................................................
3.1-15 3.1.6 Rod Pattern Control................................................. 3.1-18 3.1.7 Standby Liquid Control (SLC) System............................................... 3.1-20 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valve................ TS/3.1-25 3.2 POWER DISTRIBUTION LIMITS 3.2-1 3.2.1 Average Planar Linear Heat Generation Rate (APLHGR).........
........ 3.2-1 3.2.2 Minimum Critical Power Ratio (MCPR)
............................. 3.2-3 3.2.3 Linear Heat Generation Rate (LHGR).................................................
3.2-5 3.2.4 Average Power Range Monitor (APRM) Gain and Setpoints............. 3.2-7 3.3 INSTRUMENTATION............................................... 3.3-1 3.3.1.1 Reactor Protection System (RPS) Instrumentation............................ 3.3-1 3.3.1.2 Source Range Monitor (SRM) Instrumentation.................................. 3.3-10 3.3.1.3 Oscillation Power Range Monitor (OPRM)
Instrumentation........................
TS/3.3-15a 3.3.2.1 Control Rod Block Instrumentation........................
3.3-16 3.3.2.2 Feedwater - Main Turbine High Water Level Trip Instrumentation...................................
3.3-21 3.3.3.1 Post Accident Monitoring (PAM) Instrumentation.............................. 3.3-23 3.3.3.2 Remote Shutdown System...................................
3.3-27 3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT)
Instrumentation..
3.3-30 3.3.4.2 Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT) Instrumentation....................................
3.3-34 3.3.5.1 Emergency Core Cooling System (ECCS) Instrumentation.......... TS/3.3-37 3.3.5.2 Reactor Core Isolation Cooling (RCIC) System Instrumentation....................................
3.3-48 3.3.6.1 Primary Containment Isolation Instrumentation............................. TS/3.3-52 3.3.6.2 Secondary Containment Isolation Instrumentation............................ 3.3-63 3.3.7.1 Control Room Emergency Outside Air Supply (CREOAS)
System Instrumentation..
3.3-67 (continued)
SUSQUEHANNA - UNIT 2 TS/TOC - 1 Amendmentt 1a1, &8, 1-0, X, 199
PPL Rev. 1 SDV Vent and Drain Valves 3.1.8 3.1 REACTIVITY CONTROL SYSTEMS Scram Discharge Volume (SDV) Vent and Drain Valves 3.1.8 LCO 3.1.8 Each SDV vent and drain valve shall be OPERABLE and open.
APPLICABILITY:
MODES 1 and 2.
ACTIONS 1I. srTc.
J1jj_, I
- 1.
Separate Condition entry is allowed for the SDV vent line and drain line.
- 2.
An isolated line may be unisolated under administrative control to allow draining and venting of the SDV.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more SDV vent or A.1 Isolate the associated line.
7 days drain lines with one valve inoperable.
B.
One or more SDV vent or B.1 Isolate the associated line.
8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> drain lines with both valves inoperable.
C.
Required Action and C.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
I I
SUSQUEHANNA - UNIT 2 TS I 3.1-25 Amendment Off, 199