Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML052030504
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/03/2004
From: Branam T
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML052030504 (3)


Text

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

June 3, 2004 Time:

0200 Preparer:

T. R. Branam U

I R

28 NOTE:

Refer to base proceilure NP 10.3.6for safet, assessnient checklist KSFlef liftions.

NOTE:

JIl'enever juel has been removedfromn the reactor vessel and refueling cavity, all key safety functions are GREEN ercept spentfifel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration 3271 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion 4:

SR instrumentation operable Subtotal Condition RED ORANGE dEN (0-1) 1 (0-2) 2 (0-1)

I (0-1)

I 0-1 2

3-4 5

Subtotal=

5 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 2 0-1 RED

2.

Refueling cavity filled (0-1) 0 2

3.

Number of trains RHR available (0-2) 0 3

YL

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 x

RCSTemperature=300'F; 61 days shutdown S/Gtubesfilled; Pressurizer Level=31 %

Subtotal =

3 RCS Time to Boil N/A (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition I.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

and 345 kV levels)

(0-2) 2 4-5

2.

G-0I or G-02/A-05/B-03 available (0-1)

I G-03 or G-04/A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal=

4 INVENTORY Subtotal Condition 0-1 RED

1.

Pressurizer level 220 percent w/head on.

(0-1) 1 2

ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 0 3

3.

RCS level above REDUCED INVENTORY (0-1) l 4

a xEN

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal =

4 ntima b

in t reo was &kWd in accordance wbi ft FReedom lofIrma~o PBF-1562 Aet ox Y go9 Revision 2 10/30/0 2

S

- IMZ I of 9

References:

NP 10.3.6 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15. I.D) {Containment Operable} (ITS TS 3.6.1'; set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1) 1 Subtotal 0

2-3 4-5-6 Condition RED ORANGE

<M>

(0-1) 1 Subtotal =

4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 independent offsite powver source during periods of single X-03 or X-04 availhbility (*).

1.

"A" SFP cooling pump available with power available from:

G-02 or G-01 via 2B-32

-(*) an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via IB-42 an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil _ 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SFP Temperatures:

NW NA 0F SE NA OF SFP Average Temp NA OF SFP Time to Boil NA Subtotal 0-1 2

3 4-5 Condition RED ORANGE YELLOW GREEN (0-1)

NA (0-1)

NA (0-1)

NA (0-1)

NA (0-1)

NA Subtotal =

NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

I Core Cooling became YELLOW as RHR was re-aligned for Low Hcad Safety Injection.

Fire Protection Condition I was entered as RCS Temperature exceeded 2000F.

G-02 to be removed from senrice for Heat exchanger cleaning.

K-2B returned to service after Maintenance.

PBF-1 562 Revision 2 10/30/02

References:

NP 10.3.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

June 3, 2004 TIME:

0200 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFF COOLING:

GREEN YELLOW GREEN

. GREEN GREEN

  • NA PROTECTED EQUIPMENT:

dENTS:

Core Cooling became YELLOW as RHR was re-nligned for Low Head Safety Injection.

Fire Protection Condition I divas entered as RCS Temperature exceeded 2000F.

G-02 to be removed from service for Heat exchanger cleaning.

K-2B returned to service after Maintenance.

COM1P 6

6 PBF-1 562 Revision 2 1I)30/k02 Rcerernces: NP 10.3.6 NP 10.2.1 Page 5 of 9