Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML052030504
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/03/2004
From: Branam T
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML052030504 (3)


Text

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: June 3, 2004 Time: 0200 Preparer: T. R. Branam U I R 28 NOTE: Refer to base proceilure NP 10.3.6for safet, assessnient checklist KSFlefliftions.

NOTE: JIl'eneverjuel has been removedfromn the reactorvessel and refueling cavity, all key safetyfunctions are GREEN ercept spentfifel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY Subtotal Condition

1. RCS Boron concentration 3271 ppm a.) For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.) For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1 0-1 RED
2. Number of boration paths (0-2) 2 2 ORANGE
3. No fuel motion (0-1) I 3-4 -

4: SR instrumentation operable (0-1) I 5 dEN Subtotal= 5 CORE COOLING Subtotal Condition

1. Number of SG available for DHR (0-2) 2 0-1 RED
2. Refueling cavity filled (0-1) 0 2
3. Number of trains RHR available (0-2) 0 3 YL
4. RCS level above REDUCED INVENTORY (0-1) 1 4-5 x -

RCSTemperature=300'F; 61 days shutdown S/Gtubesfilled; Pressurizer Level=31 % Subtotal = 3 RCS Time to Boil N/A (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition I. Independent off-site power sources I RED available to A-05 and A-06 (totally 2 ORANGE independent at the 4160 V, 13.8 kV, 3 and 345 kV levels) (0-2) 2 4-5

2. G-0I or G-02/A-05/B-03 available (0-1) I G-03 or G-04/A-06/B-04 available (0-1) 1
3. G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 0 Subtotal= 4 INVENTORY Subtotal Condition 0-1 RED
1. Pressurizer level 220 percent w/head on. (0-1) 1 2 ORANGE
2. Refueling Cavity filled (see definition) (0-3) 0 3
3. RCS level above REDUCED INVENTORY (0-1) l 4 a xEN
4. Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal = 4 ntima int breo was &kWd inaccordance wbi ft FReedom lofIrma~o PBF-1562 Aetox Ygo9

References:

NP 10.3.6 Revision 2 10/30/0 2< , S - IMZ I of 9 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT Subtotal Condition

1. Containment integrity (TS 15. I.D) {Containment 0 RED Operable} (ITS TS 3.6.1'; set (O or 4) 0 ORANGE
2. Containment Closure CL-IE maintained 2-3

<M>

and closure < time to boil (O or 2) 2 4-5-6

3. No fuel motion (0-1) 1
4. DHR Capability:

- cavity flooded and internals out OR

- at least one SG available OR

- one fan cooler with Equip hatch installed and personnel hatches capable of being shut (0-1) 1 Subtotal = 4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE: Take creditforonly one P-12 independent offsite powver source duringperiods of single X-03 or X-04 availhbility (*).

Subtotal Condition

1. "A" SFP cooling pump available 0-1 RED with power available from: 2 ORANGE

- G-02 or G-01 via 2B-32 (0-1) NA 3 YELLOW

-(*) an independent off-site power 4-5 GREEN source different than that for Train B below (0-1) NA

2. "B" SFP cooling pump available with power available from:

- G-03 or G-04 via IB-42 (0-1) NA an independent off-site power source different than that for Train A above (0-1) NA

3. Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil _ 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) NA SFP Temperatures: Subtotal = NA 0

NW NA F SE NA OF SFP Average Temp NA OF SFP Time to Boil NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

I

  • Core Cooling became YELLOW as RHR was re-aligned for Low Hcad Safety Injection.
  • Fire Protection Condition I was entered as RCS Temperature exceeded 200 0 F.
  • G-02 to be removed from senrice for Heat exchanger cleaning.
  • K-2B returned to service after Maintenance.

PBF-1 562

References:

NP 10.3.6 Revision 2 10/30/02 Page 2 of 9 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: I DATE: June 3, 2004 TIME: 0200 KEY SAFETY FUNCTIONS:

REACTIVITY: GREEN CORE COOLING: YELLOW POWER AVAILABLE: GREEN INVENTORY: . GREEN CONTAINMENT: GREEN SFF COOLING:

  • NA PROTECTED EQUIPMENT:

COM1P dENTS:

Core Cooling became YELLOW as RHR was re-nligned for Low Head Safety Injection.

6 Fire Protection Condition I divas entered as RCS Temperature exceeded 2000F.

6 G-02 to be removed from service for Heat exchanger cleaning.

K-2B returned to service after Maintenance.

PBF-1 562 Rcerernces: NP 10.3.6 Revision 2 1I)30/k02 Page 5 of 9 NP 10.2.1