NMC Comnmined to NMicic*r Exce cnce a_
Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Wednesday, June 2, 2004 Start Time:
1800 NSB Cafeterii ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)
Operations Coordinators (SOC)
Maintenance Coordinators (MOC)
Engineer / Projects Coordinators (EOM)
Rad Protection Manager (RPM)
Site Safety Coordinator (SSC)
Shutdown Safety Assessor (SSA)
Site Management (SSM)
General Supervisors First Line Supervisors Agenda
- 1. Safety Issue Discussion (SSC)
- 2. Radiation Protection (RPM)
- 3. Operations Coordinator Turnover (SOC)
- 4. Shutdown Safety Assessment (SSA)
- a. Containment Fire Loading SAT /
UNSAT -+ Review Deficiencies
- 5. Maintenance Coordinator Turnover (MOC)
- 6. Engineering Coordinator Turnover (EON)
- 7. Major Projects Update (EOM)
- 8. Schedule Review (SOM)
- 9.
Management Expectations (SSM)
- 10. ACEMAN Assessment Results (SOM)
- 11. Shift Goals (SOM) a BRIEFING NOTES C~
-~I V
7 L Items Included in Daily Package:
Site Communication Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Defined Critical Path Work Activity Risk Assignment Outage Schedule
\\4
1
Nmi Comm,,ited to Nuclear EYColecICC X -
JJflEY OF YFE K[EUMMI PKIM tERCH
- UfI2t Point Beach Nuclear Plant U1R28 Refueling Outage Safety Topic for week of May 30 - June 5, 2004 Theme for the week This week's focus is looking back at our reported injuries so far in 2004. There were 52 injuries to workers on the site so far this year. That's almost more than we typically see in 2 years!
That's an injury every 3 days! Our goal is NONE. Let's review what -oing on and discuss how to prevent anythinq else from occurrinq In 2004.
Daily Safety Snippets Sunday "Twist and strains are no one's gains" Mechanic Electrician was removing a temporary rigging fixture from a roof beam and felt a strain in the upper back. Remember your Save A Back training!
Monday "Stretching before you work may reduce the strains that lurk."
An engineer experienced severe back pain upon exiting containment. The employee was bending in order to exit the accident fan coolers prior to the incident. Medical treatment was necessary and this was an OSHA recordable event.
Tuesday "If your backfield is in motion, use a zone defense."
Contract electrician was pulling wire for a conduit through a junction box for the security upgrade project. While bending over to retrieve a pull string, the wind caught the junction box door. It swung and struck the employee in the back.
Wednesday "It's too late for learning when your skin is already burning."
There have been 3 incidents in the past month where individuals contacted hot equipment and minor burns resulted. Two in maintenance - one was during welding activity, the second was when an employee came in contact with a hot muffler on a pump. The third was when one of the M&M Lunch employees placed her hand on a hot grill. What human performance barriers are we missing here?
Thursday "Where danger lingers, watch your fingers" What is the most likely injury the site has? Given the age of the work force, it should be strains.
But it's hand injuries! 22 injuries so far this yearl Example - chem. tech was removing a glass funnel from tygon tubing. The funnel separated from the stem, resulting in a minor finger laceration. The wrong technique was used for doing this work.
Friday "Never gamble with more than you can handle" Two situations to review here. One was a RP worker and contractor trying to maneuver material through a security door. Rather than calling security, they figured they could 'beat the door."
They beat it all right. And the contractor suffered a leg injury from the steel hitting him. The second was an OAII carrying a large box through a door. She ended up catching hitting her hand on the doorframe. How can we prevent these injuries?
Saturday "The brain is mightier than the brawn" Contract insulator struck his head on an I-beam while reaching for material. He was wearing the right PPE, but felt neck discomfort from the hit. The worker knew the beam was a potential hazard, but did not take the time to soften it prior to beginning his work.
2
Point Beach Nuclear Plant Outage 1R28 DAY Supporting Operational Excellence Outage Radiation Performance 59 Path Ni_\\
Picture Meets
-I flA~tma~
FvgMkc I-6 A----
This indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.
Meets:
<=92 Rem Actual Cum.
Exceeds:
<=88 Rem Dose:
85.608 Rem Day 59 - June 1 Actual = 0.157 Cumulative = 85.608 Cumulative Forecast =91.992 Meets: <= 18 Exceeds: <= 12 Actual PCE's:
11 s
6*
.6 0I Stu Thomas I
Personnel Contamination Events Cummulative Dose Exposure 20 18 E 16 us 14
= 12-
- 10 IE t 0
8 a1 6 4-2 0.
4 Actual
-Forecast l
Goal 80 J P 0
0P 40 0
0 2 4 S S 101214101620222422803523435384042£4445450525.458580062
-4Actual
Forecast "GGoal 0 5 10 15 20 25 30 35 40 45 50 55 60
_-N NMC c ( nnniffW lro Nacleltr Excellence Outage Status Report Plant:
Point Beach Unit I Dav:
Wednesday Todav's Date / Time:
6/02/04 1500 Outage Duration: Day 60 Of Refueling Outage Number UIR28 Safety Status Industrial -Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0
First Aid cases 0
Near misses 0
Total for this outage I
Summary:
Radiological Dose to date 85.608 Projected to date
- 91.992 Outage Goal 592 R Difference
-6.384
- Reforecast on 5/23 Number of PCEs I I Summary:
Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0
Summary:
Plant Status Mode:
I1 Hot Standby {AMode 3)
[ Hot Shutdown (Alode 4) a Cold Shutdown (lAode 5) 0 Refueling Shutdown (Afode 6)
RCS:
Temperature:
2400 Pressure:
325 psig RV Level:
Pressurizer Solid Time to Boil:
N/A Shutdown Safety Assessment Protected Equipment:
None Major Activities Completed in Last 24 Hours Critical Path and Near Critical Path Activities (Next 24 Hours)
TS-30 High & Low Head SI Check Valve Test RCS Heatup to 250-270'F TS-10 Upper Containment Hatch Pressure Test Establish Pzr Bubble IT-530E LRPM Test of RHR System Secure RHR Heatup RCS to 190'F Start RHR Common Work Cold Rod Functional Testing Enter Mode 3 Completed Containment Purge Testing IT-IA SI Pump & Valve Test Established Containment Integrity Entered Mode 4 Hot Shutdown Heatup RCS to 240'F Significant Outstanding Issues Date Issue Due Responsibility 5/17/04 I Rx Head Relaxation Request I 6/04/04 I Jim Schweitzer Upcoming Ma or Milestones Scheduled Actual Scheduled Actual Date Time Date Time Date Time Date Time Cooldown <2000 4/03/04 2100 4/03/04 2230 RCS Fill & Vent 4/23/04 1500 5/31/04 0653 Head Lift 4/09/04 0900 4/21/04 1550 Heatup >200° 4/25/04 0900 6/2/04 1341 Refueled 4/14/04 0300 5/02/04 1848 Reactor Critical 4/28/04 0800 RV Headset 4/18/04 1900 5/23/04 1338 On-Line 4/30/04 0100 4
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
1 DATE:
June 2, 2004 TIME:
1400 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
CONTAINMENT:
SFP COOLING:
GREEN GREEN GREEN GREEN GREEN NA PROTECTED EQUIPMENT:
COMMENTS:
- One flow path for both Reactivity and Inventory changed from 1) charging pump P-2C via the auxiliary charging line, to 2) RWST to the 'B' Safety Injection train to reflect the isolation of the auxiliary charging line.
a Instrument Air Compressor K-2B removed from Unit 2 protected equipment list for maintenance.
PBF-1562 Revision 2 10/30/02
References:
NP 10.3.6 NP 10.2.1 Page 5 of 9
_Defined Critical Path
__JUN U
ID DESCRIPTION OD RD Cal U SYS EOID TF 2
34
- ______4, 6, 8.10012.14,16.1,021 0
2
,6. 8.100r2,14,16,18,20,22 0, 2, 6, 68.1001214,16418i20.22, 1
1 1 1RC CAMP-112 0
CAMP.11 OXGEN REMOVAL WITH HYDRAZINE WITH HYDRAZINE 02JUN04 12:5902JUN04 11:00A 1
OP1A-032 VERIFY RCS OXYGEN IN 1
1 1 1
RC OP-1A 3
OPIA-03 RIFY RCS OXYGEN IN SPEC SPEC 02JUN04 12:5902JUN04 12:00 1
OP1A200F HEATUP RCS TO 200 1
1 1 1
RC OP-tA 0
OP1A200 EATUP RCS TO 200 DEGREES DEGREES 02JUN04 12:5902JUN04 12:00 1 COLDSDNY RCS ENTERS HOT 0 0 1 1
XX MILESTONE 0
COLDSD RCS ENTERS HOT SHUTDOWN SHUTDOWN 02JUN04 12:59 1
OPIA25OF HEATUP RCS TO 250 - 270 3 3 1 1 RC OP-1A 0
OP1A25 FHEATUP RCS TO 250 -270 deg F deg F 02JUN04 13: 002JUN04 15:59 1
OP1A-050 HEATUP PRESSURIZER 4
4 1 1
RC OP-1A 0
O A.05dHEATUP PRESSURIZER 02JUNO 16:0002JUN04 19:59 1
OP1A-060 ESTABLISH PZR BUBBLE 1
1 1 1 RC OP-1A 0
OP1A-06OESTABUSH PZR BUBBLE JUN04 20:00102JUN04 20:59 1
OP7B-010 SECURE OPERATING RHR 1
1 1 1 RH OP-7B 0
OP78 01jSECURE OPERATING RHR PUMPS PUMPS JUN04 20:00102JUN04 20:59 GP RHX01A START RHR COMMON WORK 0
0 1 1
RH MILESTONE 0
RHX01ASTART RHR COMMON WORK I
-02JUN04 21:00!02JUN04 20:59 1
B52-424M BUS STAB PMT 1RH-701' 2
2 1 1 480V B-42 0
B52.424MBUS STAB PMT 1RH-701" 02JUN04 21:00E0202527- 02JUN04 22:59 I
B52-424ME BUS STAB PMT 1RH-701-4 4
1 1 480V B-42 0
B52-424MEBUS STAB PMT'1RH-701' 02JUN04 21:00_0202527- 03JUN04 00:59 I
T-6316-H I RH RH-700 EM REVI-t 1
1 1 1
RH RH-700 2
T-631 6-H1 RH RH-700 EM REVI.1
_I L03JUN04 01:0010016316- 03JUN04 01:59 1
T-0482-H I Si SI-852A EM REVO-1 2
2 l 1
Si SI-852A 4
T-0482-H1 SI SI.852A EM REVO-1 I
03JUN04 01 :oo0010482- 03JUN04 02:59 1
OP7M020 COOLDOWN AND BORATE 6
6 1
1 RH OP-7B 0
OP7B.02OCOOLDOWN AND BORATE RHR RHR 03JUN04 01:00v_03JUN04 06:59 1
OP1A300F HEATUP RCS TO 295-305 1
1 1 1
RC OP-1A 4
Op¶A300gHEATUP RCS TO 295 -305 deg F deg F 03JUN04 02:00103JUN04 02:59 1 EM0215176 RH-700 MOV ACTUATOR 12 121 1
RH RH-00700-0 2
EM0215176RH-700 MOV ACTUATOR CHECK-OUT CHECK-OUT 03JUN04 02:0002151 76-003JUN04 13:59 1
TS-030C TS-30 (SECTION 5.23) TEST I T I 1 S
O.TS-030 0
TS-03OCTS-30 (SECTION 523) TEST OF SI-867B OF SI-867B 03JUN04 07:0010216005 - 03JUN04 07:59 Run Date 02JUN04 14:08 LT-16 DEFINED CRITICAL PATH Sheet I of 4
') Prfmavera Systems. Inc.
FL-6 DEFINED CRITICAL PATH SET
I__
Defined Critical Path I
JUN U
ID DESCRIPTION OD RD Cal U SYS EQID TF 2
3 1
4
_6816.18 1 16, 2022I0 2,4. 6.8,10i1214.16.18.20,221 0. 2 4, 6, 8,10,12,14l16,16,20,22 11E 4 14 1
-TEsE
_1,111II
_121R1=
1 EM0403305 SI-852A-O PERFORM STEM LUWE AND FBJ INSPECTION 10 110 I1 I
SI SI-00852A-0 1
OPIA-090 DISABLE LTOP 1
1 1
1 RC OP-1A 0
1 IT-290B IT-290B. 1P-29 AFP 4
4 1
1 AF O-IT-0290B 0
OVERSPEED TEST 1 MM0214127A MM SUPPORT FOR P-29.T 4
4 1
1 AF P-029 0
OVERSPEED TRIP TEST 1
IT-090A ATMOSPHERIC STEAM DUMP I 1'1 1
MS O-IT-0090A 4
VALVES STROKE 1
T-2076-H 1 AF P-29 RECOUPLE MM 2
2 1
1 AF P-029 0
REVO-1 1 OP0215176A RH.700 MOV ACTUATOR OPS 1 1
1 RH RH-00700-O 2
PMT PER O-IT-003D 1
T-6316-R 1 RH RH-700 EM REV1-1 1
1 1 1
RH RH-700 2
CD MM0214127C P-29-T RECOUPLE 2
2 1
1 AF P-029 0
1 RHX01Z END RHR COMMON WORK 0
0 1
1 RH MILESTONE 2
1 OP0403305 SI-852A-O PERFORM PMT 1
1 1 1
SI SI-00852A-0 STROKE I
T-2076-R 1 AF P-29 RECOUPLE MM 1
1 1
1 AF P-029 0
REVO-1 1
T-9265-R 1 AF P-29 UNCOUPLED DSS 1
1 1 1
AF P29 0
~~~REV0 1___
I 1
MAYX35OF RCS TEMP MAY EXCEED 350 0
0 1
1 XX ADMIN MS O
1 OPiA37OF HEATUP RCSTO 370 deg F 2
2 1
RC OP-1A 1 0 1
OPIA-095 VERIFY RHR VALVE 2
2 1
1 RC OP-1A ATT.
0 OPERABILITY 1
OP1A0650 RAISE RCS PRESSURE TO I
1 1 1
RC OP-1A 0
650 PSIG EM0403305SI-852A-O PERFORM STEM LUBE AND FBJ INSPECTION 03JUN04 07:0030403305-03JUN04 16:59 OP1A.09PDISABLE LTOP 03JUN04 08:00103JUND4 08:59 IT-290BIT290B1 1 P.29 AFP OVERSPEED TEST 03JUN04 09:000215901 -03JUN04 12:59 MM0214127A SUPPORT FOR P.29-T OVERSPEED TRIP TEST 03JUN04 09:00M0214127- 03JUN04 12:59 IT09OAATMOSPHERIC STEAM DUMP VALVES STROKE 03JUN04 13:0010215892- 03JUN04 13:59 T-2076-H1 AF P-29 RECOUPLE MM REVO-1 03JUN04 13:00E0012076- 03JUN04 14:59 OP021 5 17 6fH.700 MOV ACTUATOR OPS PMT PER 04T-003D 03JUN04 14:00S0215176- 03JUN04 14:59 T-63161R1 RH RH'700 EM REV1 1 03JUN04 15:00No016316- 03JUN04 15:59 MM0214127CP-29-T RECOUPLE 03JUN04 15:0000214127- 03JUN04 16:59 RHX01ZEND RHR COMMON WORK 03JUN04 16:00!03JUN04 15:59 op0403 305SI-852A-O PERFORM PMT STROKE 03JUN04 17:0001403305- 03JUN04 17:59 T-2076-R1 AF P.29 RECOUPLE MM REVO01 03JUN04 17:0030012076- 03JUN04 17:59 T,9265.R1 AF P-29 UNCOUPLED DSS REVO-1 03JUN04 17:0030019265- 03JUN04 17:59 MAYX350FRCS TEMP MAY EXCEED 350 F 03JUN04 18:00!03JUN04 17:59 OP1A370FHEATUP RCS TO 370 deg F 03JUN04 18:00O03JUN04 19:59 OP1A.095VERIFY RHR VALVE OPERABIUTY 03JUN04 20:OOE03JUN04 21:59 OPiAO65tMAISE RCS PRESSURE TO 650 PSIG 03JUN04 22:00103JUN04 22:59 OPiA080DRAISE RCS PRESSURE TO 800 PSIG 03JUN04 23:0003JUN04 23:59 I
OPIA0800 RAISE RCS PRESSURE TO 800 PSIG 1
1 I
1 RC OP-1A 0
Run Date 02JUN04 14:08l LT-16 DEFINED CRITICAL PATH Sheet 2 of 4 0 Primavera Systems. Inc.
I FL-16 DEFINED CRITICAL PATH SET I
l___
Defined Critical Path U
0 ID I
DESCRIPTION ODIRDICal U SYS JUN 4E 6O 8N1
- 2I1416,18.20,22 0, 2.4, 6,8 1012.1416,18, 0221 01,.4, 6, 8,12112,1=B1120,22 1
OPIA45OF HEATUP RCS TO 450 470 5 511 RC OP-1A 0
OP1A450FHEATUP RCS TO 450 -470 deg F deg F 03JUN04 23:00_04JUN04 03:59 EZ:
wI~r,!rE E
1!l *I1 R1 CMl I
B52-424F BUS STAB PMT -1SI-841B-I I
I 1
480V B-42 0
1 B52-424FE BUSSTAB PMT 1SI-841B-2 2
1 1 480V B-42 0
I OP1A-040 ALIGN SI ACCUMULATORS 2
2 1
1 Si OP-1A 0
1 OP1A500F RAISE RCS TEMP/PRESS TO 5
5 1
1 RC OP-1A 0
54712235 1
IC2.17-1 ICP 2.17 REACTOR 4
4 1
1 RP ICP-02.017 4
PROTECTION LOGIC TEST I
RESP-3.1B OBTAIN FINAL RCS RTD I
I I
MMS RESP 3.1 2
DATA PER RESP 3.1 1
1 IT-230-A INITIATE RCS LEAK TEST 0
0 l 1
RC O-IT-0230 0
C=
I 1 I I(I I
1 NOP-NOT RCS AT NOP NOT NOL a
0 1
XX MILESTONE 0
1 CRTDSWOFF REMOVE LOOP RTD I1 1 1 1I RP RP 2
_SWITCHING UNIT I
IT-230-B ADJUST RCS TO TEST 2
2 11 1 RC O-IT-0230 I
PRESSURE 1 IC10.1RES ESFRESISTANCECHECKS I
1 1
ESF ICP-10.001 2
(ICP-1o.00t)
I 1
IC2.20-1 RX PROTECTION ANN 2
2 1
1 IMMS ICP-02.020 2
VERIFICATION (ICP-02.020-1)
I I
OP1A-130 REINSTALL INSUL AFTER 3
3 1
MS INSUL-MS 4
RCS LEAK TEST I
1 EP0403495A OPERATING SUPPORT OF 4
4 1
1 RC PT-RCS-1 4
FINAL RCS WALKDOWN 1
CESG001TI REINSTALL INSULATION ON 6
6 1 1 MS INSUL-MS 4
SG A AND B PRI MANWAYS PTRS-0 IC RSUETS E I818 IRC P-S.
B52.424FBUS STAB PMT "I SI-841 B" 04JUN04 00:0010202527. 04JUN04 00:59 B52-424FEBUS STAB PMT 1SI-841 B.
04JUN04 00:00E0202527- 04JUN04 01:59 OP1A.040ALIGN Si ACCUMULATORS 04JUN04 02:00004JUN04 03:59 OPIA500FRAISE RCS TEMP/PRESS TO 5471223.
04JUN04 04:0004JUN04 08:59 IC2.17.11CP 2.17 REACTOR PROTECTION LOGIC TEST 04JUN04 05:000300810- 04JUN04 08:59 RESP.3.1 BOBTAIN FINAL RCS RTD DATA PER RESP 3.1 04JUN04 08:0010213863- 04JUN04 08:59 IT.230.AINITIATE RCS LEAK TESI 04JUN04 09:00!0215895. 04JUN04 08:59 NOP-NOT RCS AT NOP NOT NOL
- 04JUN04 08:59 ICRTDSWOFFREMOVE LOOP RTD SWATCHING UNI 04JUN04 09:0004JUN04 09:59 IT.230.BADJUST RCS TO TEST PRESSURE 0215895- 04JUN04 10:5904JUN04 09:00W IC10.1RESESF RESISTANCE CHECKS (ICP.10.001I 0300882- 04JUN04 10:5904JUN04 10:001 IC2.20.iRX PROTECTION ANN VERIFICATION (ICP.02.020-1 0300818- 04JUN04 12:5904JUN04 11:00C OP1A.13DREINSTALL INSUL AFTER RCS LEAK TES 0408174-04JUN04 13:5904JUN04 11 00_
EP040 3495AOPERATING SUPPORT OF FINAL RCS WALKDOW?
0403495- 04JUN04 14:5904JUN04 11 00M CESG001TIREINSTALL INSULATION ON SG A AND B PRI MANWAY 0408174-04JUN04 16:5904JUN04 11 00 m
PT.RCS.0o1RCS PRESSURE TEST PER 1-PT-RCS-OC 0305079- 04JUN04 18:5904JUN04 11 00 1 PT1RCS-001 RCS PRESSURE TEST PER 1-PT-RCS-001 5
a I 1 IRC PT-RCS-1 0
I I________________L...
.J J.....I...
I
.L...I...I Run Date 02JUN04 14:08 LT-1 6 DEFINED CRITICAL PATH Sheet 3 of 4 O Primavera Systems. Inc.
I FL-16 DEFINED CRITICAL PATH SET I
I Defined Critical Path I
JUN U
ID DESCRIPTION OD RD Cal U SYS EQID TF 2
3 4
4,S
,41,82,2
- 0. 2,4. 6,8, 1 0 1 41,8202 O1i 12,14.16,18,20,22~
1 IC2.20-2 RX PROTECTION SW 2
2 1 1 MMS ICP-02.020 2
IC2.20(-2RX PROTECTION SW VERIFICATION (ICP-02.020-2)
VERIFICATION (ICP-02.020-2) 0300819- 04JUN04 14:5904JUN04 13:00K 1 RESP-3.tPR CLOSE REACTOR TRIP 0
0 1 1 MMS RESP 3.1 2
RESP-3.1 PRCLOSE REACTOR TRIP BREAKERS FOR RPI TESTING BREAKERS FOR RPI TESTING 0213863- 04JUN04 14:5904JUN04 15:O00 1
IC4.29-2ZR RPI ZERO ADJUST 3 3 1
RPI ICP-04.029 2
IC4.29.2ZRRPI ZERO ADJUST 0300842- 04JUN04 17:5904JUN04 15:00 I CESGA001SR REMOVE SCAFFOLDING FOR 8 8 1 1 MS HX-001A 4
CESGA001SRREMOVE SCAFFOLDING FOR S/G A HANDHOLES SIG A HANDHOLES 05JUN04 00:5904JUN04 17:00 w
1 ESGB001S REMOVE SCAFFOLDING FOR 8 8 1 1 MS HX-001B 4
CESGB001SRREMOVE SCAFFOLDING FOR SIG B HANDHOLES SIG B HANDHOLES 05JUN04 00:5904JUN04 17:00 Run Date 02JUN04 14:08 LT-16 DEFINED CRITICAL PATH Sheet 4 of 4 O Primavera Systems. Inc.
FL-16 DEFINED CRITICAL PATH SET
tun Date 02JUN04 14:07 Work Activity Risk Assignment Sheet I of I U
ACT WO GRP HPE EQUIPMENT Activity Cal DUR START lFINISH T
4 JN 2
CH0300495 76 CH DR-Y ML-Y
'HEM-SAMPLIN UNIT 2 SI ACCUMULATOR Z
03JUN04 03JUN04 IMISC CHEMISTRY SAMPLING I ORT3-Y R-M
_SAMPLING/
10:00 l10:59 0300495 - B311A2 2
IC0310325 76 IC DR-Y ML-Y FM 2FM DISPLAY STICKS Z
8 03JUN04 04JUN4
[=OFM SYSTEM MULTI ANDIOR NON-NUMBERED EQUIPMENT ORT3-Y R-M 10:00 09:59 0310325 - B11A2 2
IC0407745 76 IC DR-Y ML-Y LT-00939 LT.939 DRY LEG DRAIN Z
1 03JUN04 03JUN04 IT-34A SI ACCUMULATOR LEVEL TRANSMITTER ORT3-Y R-M CHECK 10:00 10:59 0407745 - B11A2 1
IC2.20-1 76 IC DR-N ML-Y ICP-02.020 RX PROTECTION ANN 1
2 04JUN04 04JUN04 fPIOST-REFUEUNG. PRESTARTUP ANALOG CHANNEL TEST ORT3-N R-M VERIFICATION (ICP-02.020-1) 11:00 12:59 0300818 - 1281C 1
IC2.20-2 76 IC DR-N ML-Y ICP-02.020 RX PROTECTION SW 1
2 04JUN04 04JUN04 OPOST-REFUELING, PRESTARTUP ANALOG CHANNEL TEST ORT3-N R-M VERIFICATION 13:00 14:59 0300819 - 1281C E -I I
SD-1600-97 76 NDE DR-Y ML-Y R-1 INSPECT PENETRATION 26 1
1 04JUN04 04JUN04 IREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M DURING IT-230 11:00 11:59 0213476 - 128CE I
REI-10.tA 176 PRE DR-Y ML-Y I REI 10.1 lUSE REI 10.1 TO SET UP 1
2 4JUN04 04JUN04 0ADVANCED DIGITAL REACTIVITY COMPUTER INSTRUCTION ORT_
_00 0213861 - 128EN it SD-1600-98 76 SDM DR-Y ML-Y R-1 REACTOR HEAD I
I 103JUN04 103JUN04 IREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M INSPECTION RELAXATION j
1700 17:59 0213476 128CE I1 SD-1600-94 76 SDM DR-Y ML-Y R-1 MOD 03-041 - HEAD REPAIR I
04JUN04 04JUN04 IREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M CONDITIONAL ACCEPTANCE I
I 11:00 l 11:59 0213476 - 128CE NM CIW I
LT-81 HUMAN ERROR RISK BARCHART P r E
NMC I WE FL-81 HUMAN ERROR POTENTIAL f%"Ifr%
1.4^"r C Primavera SYstems. Inc.
I rormr U I i¶eTUeI~lngSO iuw~ge I
after 02JUN04 12:00 U1R28 WORKING SCHEDULE after 02JUN04 12:00 2
3 0
ID EMPFOR4C AP0215133 AP0215126 IRESPI WO ADM ST 5
76 76 76 EQID MEETING TG-01-G F52-122 DESCRIPTION EMPLOYEE FORUM RD U
2 ES 02JUN04 12:00' EF 02JUN04 13:59 MF Wed 9 JUN P.16!19.14.19.1
- n. 2.4. 6.8.10i12,14,16.18.20221 0.2.,4, 6 8_,10J12.¶4,16,!
504 EMPOR4CEMPLOYEE FORUM to Thkt. 'I Fzri A I
I APM APR GENERATOR METERS 11 31MAY04 1 03JUNo4 ON C-01 CALIBRATION 10:00A 14:59 a
I 0
Ulf.NERATPR METERS ON Coi LIBRAION AS o.. -U RICAL GFNERATOR021!C 1
TRIP F52.122 FROM PROTECTIVE II 02JUN04 02JUN04 08:OOA 12:59 j 126TRIP F52.122 FROM PROTECT 1TG-01 TG O()ZTPUT BREAKER021!
AP0303688t
.16 KV BUS SWITCHGEAR030368U 133 RELAYS 4
1 AP0303688A I APR E
6
-- I 2
AP0307284 I APS 76 fl 76 76 X-0 1-A M-2005-6-4 A-01 (CONT) CALIBRATE l 50 1 03JUN04 I 08JUN04 1A-01 NON-TECH SPECl 08:00' 12:59 ICOOLING SYSTEM tINSPECTIONICLEANINGl M-2005-640-E05 REPAIR PENETRATION 26 8
01JUN04 05JUN04 08:OOA l 10:59 136 165 0
VE RELAYING 126 ONT) CAUBRATE 1A-01 NON-TECH SPEC IICLEANING
,OLING SYSTEM INSPECTIOI M
-I-mw 0 l CE0406128 CE CE3 03JUN04 03JUN04 07:00' 14:59 CE0406128M-005-64 E05 REPAIIq PENETRATION 040612 F
~.~FN~tLAT Ar PROG.-TRh HALL 44 FT GEN AREA 7 I CE44TGATI 87 IST-SISI REINSULATE - FAC 11101 17MAY04 11 JUN04 PROG - TRB HALL 44 FTI 14:OOA 09:59 8
1 TG-30950 CE3 82 TG-01-T REINSTALL HP 59 26MAY04 07JUN04 56 TURBINE INSULATION 15:OOA 22:59 9
0 CE216332TI CE3 77 SERVICE INSTALL INSULATION 19 01JUN04 03JUN04 96 FOR IFD-204B 09:OOA 14:59 10 1
CE300867TI CE3 87 ICP-05.047 INSTALL INSULATION 12 02JUN04 03JUN04 103 FOR LS-2377AIB 08:OOA 07:59 11 0
CE927251TI CE3 77 SERVICE INSTALL INSULATION 6
02JUN04 02JUN04 0
FOR IMS-117 15:00-20:59 12 0
CE927250TI CE3 77 SERVICE INSTALL INSULATION 6
03JUN04 03JUN04 98 FOR IMS-1 16 07:00-12:59 13 0
CE303871TI CE3 77 SERVICE INSTALL INSULATION 8
03JUN04 03JUN04 8
FOR 1MS-42 07:00' 14:59 14 0
CE301715TI CE3 77 SERVICE INSTALL INSULATION 10 03JUN04 04JUN04 86 FOR 1MS-1 11 VALVE 15:00 08:59 Q~~
, A
§
\\.
w a
i
-1 1
T__
ENTLHPTRIEINSULON II MLiU I
I
.,.&w-whJSTALL IINSHILATION FOR IF11.20414
_MISMISC EQUIPMENT REPAIR/SER r
6E3 S ILiNSULATIONFOR LS2377A3B CONDARY LEVEL CONTROLLERS AND S CE9 251TINSTALL.INSULATION FOR 1MS-117 0
600 MISC EQUIPMENT R PAIR/SERVICE CE927250TNS TALL INSULATION FbR 1MS-116 030600GiMISC EOUIPMENT REPAIR/SERVIC CE3038T1TtNS ALL INSULATION FOR IMS-42 030600 MISC EQUIPMENT REPAIR/SEP E301715#NSTALL I&SULATION FOR 1MW MISC EQUIPIMENT REPAIR/SERVIE3 E030600_
CE4076o0TtNSTALL INSULA' I
- INSULATION0408174 VICE0306006 L ITCHES i/ ICE 1 111 VALVE OFOIMS-28 I.
15 - 1 CE407600TI CE3 76 INSUL-MS INSTALL INSULATION FOR IMS-282 6
04JUN04 04JUN04 09:00 14:59 80 Run Date 02JUN04 13:57 LT.03 STANDARD PUBLICATION Sheet I of 19 O Pnmavera S stems, Inc.
I FL.03 Execution Publication Set I
after 02JUN04 12:00 U R28 WORKING SCHEDULE after 02JUN04 12:00 I
.JUIN Wed 2 Thu 3 Fri 4
. I. A.
A R.1ni12q.1R.lr.
i.1n, 16 I I I CE407597TR I CE3 76 INSUL-MS 8
04JUN04 04JUN04 09:00 16:59 78 17 1
OP1A-130 CE3 76 INSUL-MS REINSTALL INSUL 3
04JUN04 04JUN04 0
AFTER RCS LEAK TEST 11:00 13:59 18 1
CE311945TI CE3 76 INSUL-MS INSTALL INSULATION 4
04JUN04 04JUN04 455 FOR PZR MANWAY 11:00 14:59 19 1
CESGOOTI CE3 76 INSUL-MS REINSTALL 6
04JUN04 04JUN04 0
INSULATION ON SG A 11:00 16:59 20 1
CE212702Tn CE3 76 INSULMS INSTALL INSULATION 10 04JUN04 04JUN04 162 FOR 1 MS-220 11:00 20:59 21 1 CE214031SR CE4 82 CV-00257 REMOVE 8
03JUN04 03JUN04 48 SCAFFOLDING FOR 07:00-14:59 22 1 CE927251SR CE4 82 MS-00117 REMOVE 4
03JUN04 03JUN04 92 SCAFFOLDING FOR 15:00 18:59 23 1 CE303871SR CE4 82 MS-00042 REMOVE 4
04JUN04 04JUN04 44 SCAFFOLDING FOR 07:00-10:59 24 1 CESGAOO1SR CE4 I HX-001A REMOVE 8
04JUN04 05JUN04 4
SCAFFOLDING FOR S/G 17:00 00:59 12.14,16.18.20,2202.4.6.8
.10112,14.1 OP1A CE311 CESG OITEINSTA I.
I CE214031SR EhOVE SCAFFI 021403 1T-C$927251SSR 1
.9927251_
E 4 CE
- HP TURBINE INLE T214 FIRS7 I CE407597TR1MS-28 REPACK VALVE
,INSULATION04081747
,.1 3 RE(NSTALL INSUL AFTE4 RCS LEAK TESI INSULATION040 4174 1945TtNSTALL INSULATION FOR PZR MANWA' I
INSULATION040E174 LL INSqLATION ON SG A ANt E PRI MANWAY.
INSULATION040d17a
-E212702T#NSTALL INSULK ON FOR 1MS-22(
INSULATIONI)40174 OLDINO FOR CV-257 4 VCT RELIEF TO T-8A-C CV MOVE SCAFFOLDING FOR 1 HXJ,21A HP FWH 5A SHE 3O3871SRREMOVE SCAFFOL TOFF ISOLATION0303871Wl WMOVE FCAFFOLDING FOR S STEAN IMOVE SCAFFOLDING FOR S STEAM Is HUT 4S.117
.L SIDE Pl-2325 F DING FOR 1MS-42 IG A HANDHOLEc GENERATORF FG B HANDHOLES GENERATORN CkSGA001SRRI CSGBOOISRI!
25 1
CESGBOOISR CE4 HX-001B REMOVE 8
3CAFFOLDING FOR SIG_
04JUN04 I 05JUN04 4
17:00_4 00:59 26 I 0 CE0210986 CE6 77 SEC SEC SUPPORT MR 99.011-B 91 05APR04 I 17JUN04 07:OOA l
14:59 31 E0205 98BSEC SUPPORT MR 99-01 IB 27 0
CE0210989 CE6 76 SEC SEC, INSTALL NEW 91 l05APR04 17JUN04 31 I
I I
i EQUIPMR99-011VE 08:OOA 14:59 28 0
CE0210990 CE6l 76 SEC SEC REM ABANDONED 1071 03MAY04 21JUN04 15 EQUIP MR 99-011-F 08:OOA 14:59 I I2 CH0300364 CH l 77 rHEM-SAMP1 RCS CL TSR 3.4.5.2l 33 1 30MAY4 15JUN04 200 I
05:OOA l11:59l EC, INSTALL NEW EQUIP MR VM.01 E
ai0lSEC REM ABANDONEDEQUIP 99411F cj jj03CS CL TSR 3.4.5.2 CS DO TSR 3.4.5.1 30 1
CH0300377 CH 77 CHEM.SAMPLj RCS DO TSR 3.4.5.1 33 1 30MAY04 05JUN04 I05.0A I11:59 200 1 1 1 1I CH0300407 I CH 77 HEM-SAMP RCS BORON SR 3.9.1.1 33 1 30MAY04 I 05JUN04 200 I
I I I
I I
II 05:OOA I 11:59 1__
540 DEG F 04:00 03:59 230 1 CL07AO1O OPS CL-7A COMPLETE SI HEATUP 1
04JUN04 04JUN04 0
CHECKLIST 04:00 04:59 231 1
P29-PMT OPS P-029 PERFORM PMT RUN OF 3 04JUN04 04JUN04 22 P-29 04:00 06:59 232 1
PC-7 OPS 77 O-PC-007 LEAK TEST REACTOR 4
04JUN04 04JUN04 21 COOLANT GAS VENT 04:00 07:59 233 1
OP1A50F O
04JUN04 04JUN04 0
TEMP/PRESS TO 04:00 08:59 234 1
OPIA-100 OPS OP-lA REDUCE PZR LEVEL TC I 04JUN04 04JUN04 0
20%
05:00 05:59 235 1 OPlA-110 OPS OP-IA CL 46. HOT VALVE 6
04JUN04 04JUN04 17 CHECKLIST 06:00 11:59 236 1
IT-230-A OPS 77 O-IT-0230 INITIATE RCS LEAK 0
04JUN04 04JUN04 0
TEST 09:00 08:59 237 1 RETEST10l OPS RETESTS WCC RUN S-10 0
04JUN04 04JUN04 0
REPORT FOR RX 09:00 08:59 l
OPIA065CRAtSE RCS PRESS RAISE RCS P ESSURE TO 650 PSIGE OP1A0b00RAISE RCS PRES&
RAISE RCS :RESSURE TO 800 PSIG OPIA450FHEATUP RCS TO HEATUP RCS -ROM 350 TO 450 DEG F B52A424FBUS STAB PMT 480V MOTOR'CONTROL CENTER FAB SAFEGUARDS0292527O OP030 16 36BRESTORE RECI 03 163dUSECURING RI I P1AA040AUGN Si AC ALIGN SI ACCUMULATORS*
OP0309023BAUGN 2A06 Ti 3-04 EDG ENGINE G4UGE CONTROL PANEL0309023!
OP0309023APROTECT
- r. flA ~Fnr ~Ifl.lIs rfl ir.;
t'f.KTDIrI l~k IMI nflfl i
I INSUF I
TERRY TURBINE EAK TEST REACTOR COOLANT GA I
HEAT I
LO\\
II U1 CLASS 1 COMPONEN Ir
-EAKTESTREATOR OOLAT G
-- uu
-VI.
I -V
...u~uz RETEST09WCC RUN S-9 REPORT FC E ALL RETEST ARE COMPLETEDI CL07A010COMPLETE Si HE l
INSI HE.A P29-PMTPERFORM OVERSPEED DEVICE TRIP TESTO PC.7LEAK TEST REACTOR CC 3 VENT SYSTEM VALkVES021592a!=
OP1A500FRAISE RCS TEMPIP JP RCS FROM 450 TO 500 DEG F iOP1A-10CREDUCE P IER PRESSURIZER LEVEL TO 20%Pll OP1 A.11 CL 4B, HOT %
'ONTAINMENT HOT VALVE LINEUPSm IT.230.AINITIAT rS LEAK TEST FOLLOWING RFSD 0215895 RETESTI1WCC RUN S-10 REPORT INSURE ALL RETEbT ARE COMPLETED RETESTI I\\CC RUN S-1I REPO INSURE ALL RETEPT ARE COMPLETED JRE TO 650 PSIG
- URE TO 800 PSIC 450 -470 deg F "151-841 B' RC OF RWST
£CIRC OF RWST/
tCUMULATORS
) G-03 PER 01-35)
I-03 EDG R RCS >540 DEG JaTUP CHECKUSI TUP CHECKLIST PMT RUN OF P-2 OLANT GAS VEN RESS TO 5471223!
ZR LEVEL TO 20¶)
ALVE CHECKUSI
-RCS LEAK TES' FOR RX CRITICAt qT FOR STEAM I 2381 1 RETEST11 OPS RETESTS T WCC RUN S-il 0
REPORT FOR STEAM I 04JUN04 l 04JUN04 09:00 1 08:59 0
Run Date 02JUN0413:571 LT-03 STANDARD PUBLICATION Sheet 14 of 19 l Pnmavera Systems. Inc.
l FL-03 Execution Publication Set I
after 02JUN04 12:00 U1R28 WORKING SCHEDULE after 02JUN04 12:00 U
ID RESP WO lElID DESCRIPTnON RD ES EF MF W
JUN I
s.1 01214,16.18,20,221 0, 2.4,6. B.IO12. 1 4.16 i18.2 0.2 2 1 0.24.6 12.14116 239 1 RETEST12 OPS RETESTS WCC RUN S-12 0
04JUN04 04JUN04 0
I RETESTI2WCC RUN S-12 REPORT FOR SYN
__REPORT FOR SYNC _
09:00 08:59
.VERIFY RETESTS :OR SYNCHRONIZATION ARE COMPLETE 240 1
RETEST13 OPS RETESTS WCC RUN S-13 0
04JUN04 04JUN04 0
J REtESTt3WCC RUN S-1S REPORT FOR 5V REPORT FOR 5%
09:00 08:59
- VERIFY RETESTS F( R 5% REACTOR POWER ARE COMPLETE 241 1
RETEST14 OPS RETESTS WCC RUN S.14 0
04JUN04 04JUN04 0
.I RETESTI4WCC RUN S-14 REPORT FOR 25 REPORT FOR 25%
09:00 08:59
04JUN04 04JUN04 0
RETiSTI5WCC RUN S-1S EPORT FOR 506 REPORT FOR 50%
09:00 08:59
.VERIFY RETESTS F R 50% REACTOR POWER ARE COMPLET 243 1 RETESTI6 OPS RETESTS WCC RUN S-16 0
04JUN04 04JUN04 0
RETEST16WCC RUN S.16 EPORT FOR 75%
REPORT FOR 75%
09:00 08:59
- VERIFY RETESTS F R 75% REACTOR PCIWER ARE COMPLET 1244 1
RETEST17 OPS RETESTS WCC RUN S-17 0
04JUN04 04JUN04 101 I
RETET17WCC RUN S-17 REPORT FOR 1000/
REPORT FOR 100%
09:00 08:59
'VERIFY RETESTS F 1R I00% REACTOR POWER ARE COMPLE 245 1 IT-230-B OPS 77 O-IT-0230 ADJUST RCS TO TEST 2 04JUN04 04JUN04 0
IT.230.BADJUST RCS Td TEST PRESSUR PRESSURE 09:00 10:59 UI CLASS I COMPONEN6S LEAK TEST FOLLOWING RFSD021589!
246 1
0114-070 OPS 01-14 ESTABLISH SG 5
04JUN04 04JUN04 0
I3 4-70STABUSIS BLOWDOS 0
BLOWDOWN 09:00 13:59 ESTAB,.!SH SG BL0WOWN _
Z47 I OP13AOIO OPS OP-13A ALIGN & START MAIN 6
04U040J0 0,ALIGN I
START MAIN FEED PUM
___FEPUP 09:00 14:59 I
1INADSRTOE MAIN FEED PUMP _
248 1 EP0403495A OPS 76 PT-RCS-1 OPERATING SUPPORT 4
04JUN04 04JUN04 4
EJO04O3495AOPERATING SUPPORT OF FINA RCS WALKDOW OF FINAL RCS 11:00 14:59 REACTOR COOLANT SYSTEM (RCS) PRESSURE TEST - IN/040 49 249 1 B52-428M OPS 76 B.42 BUS STAB PMT 1
04JUN04 04JUN04 0
MO.LB52.428MBUS STAB PMT W-13B2 W__
13B2 13:00 13:59 480V MOTO R CONTROL CENTEq PAB SAFEGUARDSd2O2527?
250 0 OP0405880 OPS 78 W-013B1 W-013B1 PMT PER IWP 2 04JUN04 04JUN04 0
.OP0401880W-013B1 PMT PEl IWP 01-128'E-F 01-128 E-FN 13:00 14:59 CONTROL ROOM RECIRC FAN d40588C&
251 0
OP0309023C OPS 76 C-102 ALIGN 2A06 TO G-04 1
04JUN04 04JUN04 454 OPO3b9023OAUGN 2A06 T4 G-04 PER 01-35 PER 01-35A 15:00 15:59 3 04 EDG ENGINE GAUGE CONTROL PANEL03090231 252 1
CL20-020 PPGl CL-20 I
CONTAINMENT 2
02JUN04 02JUN04 63 L2 20CONTAINMtNT CLOSEOUT INSPECTION CLOSEOUT 10:OOA 13:59 CONTAINMqNT CLOSEOUT INSP CTION 253 1 COLDSDNY PPG MILESTONE RCS ENTERS HOT 0
02JUN04 0 OL SDNYRCS ENTERS HOT SHUTDOWI SHUTDOWN 12:59 EXIT COLD tHUTDOWN 254 1
ENFPCO1U PPG MILESTONE ENTER SID FIRE PROT 0
02JUN04 02JUN04 505 ENF COIUENTER Sb FIRE PROT COND I COND I 13:00 12:59 I
255 1 RHX01A PPG MILESTONE START RHR COMMON 0
02JUN04 02JUN04 0
RHX01ASTART RHR COMMO WORK WORK 21:00 20:59 lSTART RHR B LOOP ORK 256 1
ADMIN-82 PPG ADMIN IStrtup Readiness 4
03JUN04 03JUN04 0
1 ADMIN-25trtup ReadineSS MeetingtO Exit HOtS utdOWn Meeting to Exit Hot 10:00 13:59 1Startup Readiness Meeting Run Date 02JUN04 13:57 LT-03 STANDARD PUBLICATION Sheet 15 of 19 Q Primavera Systems. Inc.
FL-03 Execution Publication Set
after 02JUN04 12:00 U1R28 WORKING SCHEDULE J
after O2JUN04 12:00 lU ID lRESP WO EaID DESCRIPTON RDI ES I
EF MF JUN ST Tu 3Fri 4
IIIT I
I I
1012.14.16,18,20.221 0
- 21.,6.11 1416182022 0
- 2 - 4, 6* 8.1Oi12,141 1
257 1 RHXO1Z PPG MILESTONE END RHR COMMON 0
03JUN04 03JUN04 0
RHX01ZEND RHR COMMON WORK WORK 16:00 15:59
.END RHR B LOOP WORK 258 1 MAYX350F PPG ADMIN MS RCS TEMP MAY 0
03JUN04 03JUN04 0
MAYX350PRCS FrEMP MAY EXCEED 150 F EXCEED 350 F 18:00 17:59 WO K TESTS & COMMITTMENTS COMPL TE FOR >350F1 259 1 TUXOIZ PPG MILESTONE CLOSE MAIN TURB &
0 03JUN04 03JUN04 56 TUX0IZCLOSE MAIN TURB & AUXIUARI S WORK WINDO AUXILIARIES WORK 22:00 21:59 IMAIN TURBINE & A XILIARIES 261 1
CSB12Z PPG MILESTONE END FEED PUMP P28B 0
04JUN04 04JUN04 0
CSB12ZEND FEED PUMP P2 B WORK WINDO WORK WINDOW 0900 0859 MAIN FEED PUMP P-28B 260 1 NOP-NOT PPG MILESTONE RCS AT NOP NOT NOL 0
04JUN04 0
NOP.NOTRCS AT NOP NOT NO 08:59 EX¢T HOT SHUTDOWN 262 1 RESP-3.1B PRE l 77 RESP 3.1 OBTAIN FINAL RCS RTD 1 04JUN04 04JUN04 0
RESP.3.1BOBTAIN FINAL RCS RTD DXTA PER RESP 3.
DATA PER RESP 3.1 08:00 08:59 PRIMARY SYSTEM TESTS 021386i 263 1 REI-10.1A PRE 76 REI 10.1 USE REI 10.1 TO SET 2
04JUN04 04JUN04 4
I REI.1d.lAUSEREI 10.1 TO S'-TUPTHEADRC UP THE ADRC.
09:00 10:59 ADVANCED DIGITAL REACIIVITY COMPUTER IIYSTRUCTION0213861U 264 1 RESP-3.1 PR RE 77 RESP 3.1 CLOSE REACTOR TRIP 0
04JUN04 04JUN04 0RESP-3.1 pRCLOSE REACTOR TRIP BREAKERS RPI TESTIN B6 E
P31COEREAKESTOR RP 50 E
31pCOERATRTRIP BREKES4FRJPUNES04 14:59
_I PIMARY SYSTEM TES S0213863 265 1 RPJF-IO1L RP DEPOST POST CONTAINMENT 4
02JUN04 02JUN04 l 0
JF-101LPOST CONTAINMENT HATClH FOR HEATUP >350 CTM HATCH FOR HEATUP 17:001 20:59 11 266 1 RPJF-101M RP DEPOST DEPOSTINTERNAL 4 l02JUN4 03JUN04 I CRPJF-t01 DEPOSTINTERNALAREAPOSTNGS 2
1 CTM AREA POSTINGS 21:00 00:59 267 1 RPJF-1010 RP DEPOST POST LHRA AT I1 03JUN04 03JUN04 0
RPJF.I10OPOST LHRA CONTAINMENT HATCHS CTM CONTAINMENT 01:00 01:59 1
268 1I RPJF-101P RP I DEPOST I
REMOVELHRA I I 03JUN04 I 03JUN04 50 RFJF.10IPREMOVE L POSTINGS IN COUITAINMENT CTM POSTINGS IN 02:00 02:59 ilI 91 Wilal 9*19 ltk LCMJ A 29 l0 lRPSH0017 ;P SHEDN INTLHEDN 60JN40JN4 13 RS07NTkLSILIGAON RS TTONA AROUND FRISK 18 00I 00 59 2701 1 l RPJF-101N lRP1 I I
DEPOST REMOVE INTERNAL 4
02JUN04 03JUN04 0
RPJFO01 NREMOVEINTERNAL REASOPsPC&TRASHBARRELS 1
I I1INCTM AREA SOPs, PC &
21 00 00:59 I
,REA 271 1 I SD-1600-98 SDM 76 R-1 REACTOR HEAD 1
03JUN04 03JUN04 0
SD.600 98REACTOR HEAD INSPECTION RELAXATION REQUES INSPECTION 17:00 17:59 1
6 1I 0213476REACTOR VESSEL AND ASSEMBLY 2721 1 I SD-1600-94 SoM 76 R-1 MOD03-041 -HEAD I1 04JUN04 04JUN04 171 SD6 OD03041HEAb REPAIRCONDITIO IALACCEPTANC REPAIR CONDITIONAL 11:00 11:59 1
REACTOR VESSEL'ANDASSEMBLY0211471 Run Date 02JUN0413:57l LT-03 STANDARD PUBLICATION Sheet16of19 Q Pnmavera Systems. Inc.
FL-03 Execution Publication Set S
after 02JUN04 12:00 U1R28 WORKING SCHEDULE after O2JUN04 12:00 D
oIJUN STWe 2IThii3 Fri 4 I#lU lID lRES1 WO lEQID lDESCRIPTION lRDl ES lEF lM F
JUN I t LST I
l w.1112141.
4.810012.14.16,1R.20.22 0 2 4 6. R 1011i4, 1
II 2731 1 CL-2E wCC CL 2E MODE 3 TO MODE2 163- 02MAY04 05JUN04 CHECKLIST 19:OOA 102:59 n
L.-2tMODE 3 TO MODE 2 CHECKLIST 2111 -
ARRIJIMM
-
274 1 CL-2F L-21MODE 2 TO MCdDE I CHECKUST wCC CL 2F MODE 2 TO MODE 1 1
985-02MAY04 06JUN04 CHECKLIST 19:OOA 00:59 n-la____
2751 1 CL-2C IWCCI CL 2C MODE 5
TO MODE 4 1.
26MAY04I 02JUN04I 0
_CHECKLISTT_ 19:00A 12:59 276~~~
I IL2 L2 OE4T OE32 6A0 3U0 cL-2 MODE 5 TO MODE 4 CHECKLISTI MODE 4 TO M0DE 3 CHECKLIST 2761 CL-21) wCC CL 20 MODE4KTO MODE3 2226MAY041 03JUN04 CHECKLIST II19:OOA 109:59 n-l.a I
277 1 T-9276-R WCC P-28B 1 CS P-288 MM REV3-1 1
31MAY04 02JUN04 44 09:OOA 12:59 278 1
RETEST08 WCC RETESTS WCC RUN S-8 REPORT 0
02JUN04 02JUN04 21 FOR RCS >350 DEG F 12:00 11:59 279 0 T301077H WCC F-236 HANG PERMIT (O STP 1
02JUN04 02JUN04 3
F-236 MM REVO-3) 12:00 12:59 280 0 T301078H WCC F-237 HANG PERMIT (O STP 1
02JUN04 02JUN04 0
F-237 MM REVO-3) 12:00.
12:59 I
T306095H WCC Z-027-1/2/
HANG PERMIT (1 CW 1 j 02JUN04 02JUN04 5
Z-27-1P21314 MM REVO-1) 1 12:00 12:59 282 1 T-8689-R WCC 102-1/TG-0 I MRR 102-1/TG-01 CE 1
02JUN04 02JUN04 0
REV3-1 13:00 13:59 283 0 T214209R WCC I
HX.279 REMOVE TAG (O VNWH I 02JUN04 02JUN04 504 HX-279 MM REVO-1) 13:00 13:59 284 0
T301076R WCC F-235 REMOVE PERMIT (0 1
02JUN04 02JUN04 504 STP F-235 MM REVO-3) 13:00 13:59 285 1 T-0693-R WCC 01-32B 1 HG 01-32B OPS 1
02JUN04 02JUN04 0
REVO-1 14:00 14:59 286 0 T301078R WCC F.237 REMOVE PERMIT (0 1
02JUN04 02JUN04 501 STP F-237 MM REVO-3) 16:00 16:59 287 0 T307011R WCC D.105 REMOVE TAG (O 125V 2
02JUN04 02JUN04 0
D-105 EM REVO-3) 19:00 20:59 288 0 T201620R WCC K-002B REMOVE TAG (O IA K-20 I 02JUN04 02JUN04 497 MM REVO-1) 20:00 20:59 289 0 T-7624-R WCC IA-00229 D IA K-2B FIN REV0-1 (I 2
02JUN04 02JUN04 496 2004 FOLDER) 1 20:00 21:59 RETI r301 r301 r306 T-861 7214 r301 T-061 0011 RI CS P-28B MM REV3.1 11 CS P-28B MM REV3-1 0019276 ST08WCC RUN -8 REPORT FOR RC NSURE ALL RETEST ARE COMPLET T7HHANG PERMIT (O STP F-236 MM 78HHANG PERMIT (O STP F-237 MM 95HHANG PERMIT (1 CW Z-27-1 /V3
T-7624-RIA K-2B FIN REVO.1 0017624 T2O0664HHANG TAG (0 V U,
C F
p I
I 4
11
>350 DEG F
_DI tEVO-3)
REV0-3)
MM REVO-1) 8689 M REVO-1)
M REVO03)
MM REVO-3) 105 EM REVO-3)
B MM REVO-1)
N 2004 FOLDER) 0WH W-211 MM REV6.1) 2901 0 T201664H wCC W-21 1 HANG TAG (0 VNWH W-211 MM REVO-1) 1 03JUN04 03JUN04 00:00' 00:59 33 Run Date 02JUN04 13:57T LT-03 STANDARD PUBLICATION Sheet17of19 o Primavera Systems, Inc.
I FL-03 Execution Publication Set I -
after 02JUN04 12:00 U1R28 WORKING SCHEDULE after 02JUN04 12:00
- JUl ID1 RESPIWO I
EQID IDESCRIPTION
~RE) IES_
IF IMF4.JU I
-P I0i12,14,16, 82,2024 f6,8,I101 6,8, 0,2202.4,6,8.1i.14,16 291 1
T-6316-H WCC RH-700 I RH RH-700 EM REVt-11 I 03JUN04 03JUN04 01:00 01:59
03JUN04 03JUN04 4
01:00 02:59 293 1 T306095R WCC; Z-027-112/
REMOVE PERMIT (1 C 1
03JUN04 03JUN04 491 Z-27-1/21314 MM REVO-1) 02:00 02:59 294 0 T310385H WCC HX-055B-1 HANG TAG (0 DG G-2 1
03JUN04 03JUN04 a
HX-55B1/B2 MM 06:00 06:59 295 0 T301077R WCC F-236 REMOVE PERMIT (0 1
03JUN04 03JUN04 485 STP F.236 MM REVO-3) 08:00 08:59 296 0 T212184R WCC T-119A REMOVE TAG (OWT 1
03JUN04 03JUN04 481 TM-02-037 REMOVAL 12:00 12:59 297 2 T306101H WCC Z-027-1/2/
HANG PERMIT (2 CW 1
03JUN04 03JUN04 5
/-271121314 MM REVO-1' 12:00-12:59 298 1 T-2076-H WCC P-029 I AF P-29 RECOUPLE 2
03JUN04 03JUN04 0
MM REVO-1 13:00 14:59 1
T-6316-R WCC RH-700 1 RH RH-700 EM REV1.1 1
03JUN04 03JUN04 0
15:00 15:59 300 1 T-7754-R WCC TG-01-G I TU TG-01-G APM 1
03JUN04 03JUN04 6
REVO-1 15:00 15:59 301 0 T310385R WCC HX-055B-1 REMOVE TAG (0 DG G-; 1 03JUN04 03JUN04 0
HX-55B1/B2 MM 15:00 15:59 302 1 T-2076-R WCC l
P-029 1 AF P-29 RECOUPLE 1
03JUN04 03JUN04 0
MM REVO-1 17:00 17:59 303 1 T-8228-R WCC Z-013 1 Z Z-13 CAUTION TAG I
03JUN04 03JUN04 0
OPS REVO-1 17:00 17:59 304 1 T-9221-R WCC Z-104A 1 SW Z-104A MM 1
03JUN04 03JUN04 476 REVO-1 17:00 17:59 305 1 T-9265-R WCC P-29 1 AF P-29 UNCOUPLED 1
03JUN04 03JUN04 0
DSS REVO-1 17:00 17:59 306 1 T-0482-R WCC SI-852A 1 SI SI-852A EM REVO-1 1
03JUN04 03JUN04 475 18:00 18:59 307 1
T301106H WCC P-011A HANG TAG (1 CC P-11A 1
03JUN04 03JUN04 0
MM REVO01) 20:00' 20:59 TT6316-H1 RH RH-700 EM REVI-1 001631611 RH RH-70C EM REVI-1 T.0482.H1 SI SI-852A EMU REVO-1 d010482U1 SI SIl852A EM REVO-1 T306095RREMOVE PE IMIT (1 CW Z-27.11213t4 MM REV0-1)
T310385HHAN; TAG (0 DG G-2 HX-$5B11B2 MM REV0-2) l El T301077RR-MOVE PERMIT (0 STP F-236 MM REVO-3)
T21;184RREMOVE TAG (0 WT TM-02-037 REM T301 101 HHANG PERMIT ¢2 CW Z-2711t21314 Mt T 2076-H1 AF P.29 RECOUPLE MM REVO.1 O 12076M1 AF P-29 RECOUPLE MM REV(
T-6316-R1 RH RH-7T0 EM REV1-1 00163141 RH RH 700 EM REV1-1 T-7754.R1TU TG-01-G APM REVO-1 001775.i1 TU TG-01-G APM REVO-1 T310385RREMOVE tAG (0 DG G-2 HX.551 T.2076.R1 AF P-29 RECOUPLE MM R 001207T1 AF IP-29 RECOUPLE MM T.8228.R1 Z Z-1 CAUTION TAG OPS 001822ENI Z ZL13 CAUTION TAG Or T-9221 1SWZ4104A MM REV0-1 001922111 SW.Z-104A MM REVO-1 T-9265.R1 AF PJ29 UNCOUPLED DS 001926511 AF P.29 UNCOUPLED Dl T-0482.R1 SI 61-852A EM REVO-1 0010482a1 SI SI-852A EM REVO-1 T3011061HANG TAG (1 CC P-11.
T.8169.RiTU TG-01-T REV6.2 00181691 TU TG-01-T REVE 3VAL CE REVO01' i REVO-1)
-1 111B2 MM REVO-2 EV0-1 REVO-1 REVO-1 S REVO-1 REVO01
'S REVO-1 MM REVO-1)
.2-1 3081 1 T-8169-R WCC I TG-01-T 1 TU TG-01-T REV6.2-1 1
03JUN04 03JUN04 21:00 21:59 a
Run Date 02JUN04 13:57 LT-03 STANDARD PUBLICATION Sheet 18 of 19
© Pnmavera Systems. Inc.
FL-03 Execution Publication Set I
after 02JUN04 12:00 U1R28 WORKING SCHEDULE after 02JUN04 12:00 E
RESPQ WO EID DESCRIPTION RD ES EF MF JUN ST I
.10t12,14,16.18,20,221 0. 2, 4.6. R,.1U21,61,0.221 0. 2. 4.6. 8.10i12,14,16.1.
309 o T201662H W
W-210 HANG TAG (o VNWH 1
04JUN04 04JUN04 5
T201662HANG TAG (o VNWH V-210 MM REVO-1:
W-210 MM REV0-1) 00:00 00:59 310 0 T302217H WCC F-236 HANG TAG (0 STP F-236 1 04JUN04 04JUN04 6
T3022t7HHANG TAG (0 STFP F-236 MM REVO-1 MM REV0-1) o:00 o00:59 311 0
T305618R WCC P-031B-M REMOVE TAG (o CW I
04JUN04 04JUN04 468 T305618REMovE TAG (0 CW P-1B-M EM REV0-P-31B-M EM REVO-1) 01:00 01:59 LU 312 2 T306101R WCC Z-027-112/
EMOVE PERMIT (2 CW I 04JUN04 04JUN04 467 T306101RREMOVg PERMIT (2 CWZ-27 12V314MM REV0-
_-27-W314 MM REV0-1_
02:00 02:59 Fe 313 1 T301106R WCC P-O11A REMOVE TAG (I CC 1
04JUN04 04JUN04 466 T301106REMOVE TAG (1 CC
-11A MM REVO-1 P-11A MM REVO-1) 03:00 03:59 L,
314 2 T304865H WCC YS-03587 HANG TAG (2 CW 1
04JUN04 04JUN04 0
T304865sHANG TAG (2 CW Y -3587 MM REVO-1 YS-3587 MM REVO01) 05:00 05:59 la 315 1 T-8022-H WCC IWP 1 480V IWP 01-128-E-FN I 04JUN04 04JUN04 0
T-8022-H 1 480V IWP 01 128 E-FN -13B1) EM REVO (W-13B1) EM REVO02 07:00 07:59 1 480V IWP 01-2s-E-FN (W-13B1) E&I REVO-2001802il 316 0 T201662R WCC W-210 REMOVE TAG (o VNWH 1 04JUN04 04JUN04 459 T201662RREMOVE TAG (o VNWH V-210 MM REVO-1 I
I I
W-210 MM REV0-1) 10:00 10:59 I
4l 357 1 T-8022-R WCC IWP 1 480V IWP 01-128sE-FN 1
04JUN04 04JUN04 0C T-8022-R1 480V IWP 01-128sE-FN 04 13B1) EM REVO (W-13B1) EM REVO-2 12:00 12:59 1480% IWPO1-128sE-FN(W-13B1)EMREVO.200 8022U 318 0 T201664 R WCC W-211 REMOVE TAG (o VNWH 1
04JUN04 04JUN04 455 T201664RREMOVETAG (0 VNWH V-211 MM REVO-1 W-211 MM REVO-1) 14:00 14:59 L
Ll 319 0 T302217R jWCC F-236 REMOVE TAG (o STP I
04JUN04 04JUN04 454 T302217RREMOVE TAG (o STP F-236 MM REVO-1 F-236 MM REV0-1) 15:00 15:59 0
I 8
l EA 320 1 T-8019-R IWCC W01R3B1 I 484V IWP 01-128 FN 2 084JUN04 04JUN04 (W-1 1B1) CAUT REVO-1 (W-13B1) CAUT REVO-1 15:00 16:59 1 4 OV IWP 01-128sE-FN(W-13B1) CAUT REV0-1 0018019^
321 0
T201997H wCC W-013B1 HANG TAG (O VNCR 1
04JUN04 04JUN04 0
T201997HIANG TAG (o VNCR W113B1 MM REVO-1
-W-I381 MMREVO-1) 17:00' 17:59 l
l Run Date 02JUN04 13:57 LT-03 STANDARD PUBLICATION Sheet 19 of 19