CY. -d Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST N-.
Date:
June 2,2004 Time:
1400 Preparer:
John Olvera U
I R
28 NOTE:
Refer to base procedure NP 10.3.6for safety assessment checklist KSF definitions.
NOTE:
WIhenever fuel has been removed from the reactor vessel and refueling cavity, all key safety functions are GREEN except spent fiel pool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY
- 1.
RCS Boron concentration 3275 ppm a.)
For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)
For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C
- 2.
Number of boration paths
- 3.
No fuel motion
- 4.
SR instrumentation operable Subtotal Condition RED ORANGE I.Wird8 4
EN; (0-1) 1 (0-2) 2 (0-1) 1 (0-1) 1 0-1 2
3-4 5
Subtotal =
5 CORE COOLING Subtotal Condition
- 1.
Number of SG available for DHR (0-2) 2 0-1 RED
- 2.
Refueling cavity filled (0-1) 0 2
ORANGE
- 3.
Number of trains RHR available (0-2) 2 3
Ni;LMV
- 4.
RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS Temperature = 1907F; 60 days shutdown RCS is solid, SIC tubes filled Subtotal =
5 RCS Time to Boil N/A (Applicable at Cold or Refueling Shutdown)
POWER AVAILABILITY Subtotal Condition
- 1.
Independent off-site power sources I
RED available to A-05 and A-06 (totally 2
ORANGE independent at the 4160 V, 13.8 kV, 3
J and 345 kV levels)
(0-2) 2 4-5 CGREEN)
- 2.
G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1
- 3.
G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(0-1) 0 Subtotal =
4 INVENTORY Subtotal Condition 0-1 RED
- 1.
Pressurizer level 220 percent w/head on.
(0-1) 1 2
ORANGE
- 2.
Refueling Cavity filled (see definition)
(0-3) 0 3
4L
- 3.
RCS level above REDUCED INVENTORY (0-1) 1 4
- 4.
Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal =
4 Intrmaboin tUs record was deeWd in accordance with tie Freedom of Inlornon 10130/02 Act. exm 4P V-1Q
References:
NP 10.3.6 NP 10.2.1 PBF-1562 Revision 2 I of9 Fow A4)-"-
'10 &U
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT
- 1.
Containment integrity (TS 15.11.D) (Containment Operable) (ITS TS 3.6.1) set
- 2.
Containment Closure CL-lE maintained and closure < time to boil
- 3.
No fuel motion
- 4.
DHR Capability:
cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (Oor2) 2 (0-1) 1 Subtotal 0
1 2-3 4-5-6 Condition RED ORANGE
<2>
(0-1) 1 Subtotal =
4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
NOTE:
Take creditfor only one P-12 independent offsite power source during periods of single X-03 or X-04 availability (*).
- 1.
"A" SFP cooling pump available with power available from:
G-02 or G-01 via 2B-32
-(*) an independent off-site power source different than that for Train B below
- 2.
"B" SFP cooling pump available with power available from:
G-03 or G-04 via IB42
.(*) an independent off-site power source different than that for Train A above
- 3.
Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- Subtotal 0-1 2
3 4-5 Condition RED ORANGE YELLOW GREEN (0-1)
NA (0-1)
NA (0-1)
NA (0-1)
NA (0-1)
NA SFP Temperatures:
NW NA OF SE NA OF SFP Average Temp NA SFP Time to Boil NA Subtotal =
NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
- One flow path for both Reactivity and Inventory changed from I) charging pump P-2C via the auxiliary charging line, to 2) RIVST to the 'B' Safety Injection train.
- Instrument Air Compressor K-2B removed from Unit 2 protected equipment list for maintenance.
PBF-1562 Revision 2 10/30/02
References:
NP 10.3.6 NP 10.2.1 Page 2 of 9
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
1
. DATE:
June 2, 2004 TIME:
1400 KEY SAFETY-FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
CONTAINMENT:
SFP COOLING:
GREEN GREEN GREEN GREEN GREEN NA PROTECTED EOUIPMENT:
COMMENTS:
- One flow path for both Reactivity and Inventory changed from 1) charging pump P-2C via the auxiliary charging line, to 2) RWST to the '13' Safety Injection train to reflect the isolation of the auxiliary charging line.
- Instrument Air Compressor K-21B removed from Unit 2 protected equipment list for maintenance.
PBF-1 562 Revision 2 10130/02 Rcrerences: NP 10.3.6 NP 10.2.1 Page 5 of 9