ML052030216

From kanterella
Jump to navigation Jump to search
Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML052030216
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/02/2004
From: Olvera J
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML052030216 (3)


Text

CY. -d Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST N-.

Date:

June 2,2004 Time:

1400 Preparer:

John Olvera U

I R

28 NOTE:

Refer to base procedure NP 10.3.6for safety assessment checklist KSF definitions.

NOTE:

WIhenever fuel has been removed from the reactor vessel and refueling cavity, all key safety functions are GREEN except spent fiel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration 3275 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Subtotal Condition RED ORANGE I.Wird8 4

EN; (0-1) 1 (0-2) 2 (0-1) 1 (0-1) 1 0-1 2

3-4 5

Subtotal =

5 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 2 0-1 RED

2.

Refueling cavity filled (0-1) 0 2

ORANGE

3.

Number of trains RHR available (0-2) 2 3

Ni;LMV

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS Temperature = 1907F; 60 days shutdown RCS is solid, SIC tubes filled Subtotal =

5 RCS Time to Boil N/A (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

J and 345 kV levels)

(0-2) 2 4-5 CGREEN)

2.

G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal =

4 INVENTORY Subtotal Condition 0-1 RED

1.

Pressurizer level 220 percent w/head on.

(0-1) 1 2

ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 0 3

4L

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal =

4 Intrmaboin tUs record was deeWd in accordance with tie Freedom of Inlornon 10130/02 Act. exm 4P V-1Q

References:

NP 10.3.6 NP 10.2.1 PBF-1562 Revision 2 I of9 Fow A4)-"-

'10 &U

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.11.D) (Containment Operable) (ITS TS 3.6.1) set

2.

Containment Closure CL-lE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (Oor2) 2 (0-1) 1 Subtotal 0

1 2-3 4-5-6 Condition RED ORANGE

<2>

(0-1) 1 Subtotal =

4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 independent offsite power source during periods of single X-03 or X-04 availability (*).

1.

"A" SFP cooling pump available with power available from:

G-02 or G-01 via 2B-32

-(*) an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via IB42

.(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

  • Subtotal 0-1 2

3 4-5 Condition RED ORANGE YELLOW GREEN (0-1)

NA (0-1)

NA (0-1)

NA (0-1)

NA (0-1)

NA SFP Temperatures:

NW NA OF SE NA OF SFP Average Temp NA SFP Time to Boil NA Subtotal =

NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

  • One flow path for both Reactivity and Inventory changed from I) charging pump P-2C via the auxiliary charging line, to 2) RIVST to the 'B' Safety Injection train.
  • Instrument Air Compressor K-2B removed from Unit 2 protected equipment list for maintenance.

PBF-1562 Revision 2 10/30/02

References:

NP 10.3.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

1

. DATE:

June 2, 2004 TIME:

1400 KEY SAFETY-FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

GREEN GREEN GREEN GREEN GREEN NA PROTECTED EOUIPMENT:

COMMENTS:

  • One flow path for both Reactivity and Inventory changed from 1) charging pump P-2C via the auxiliary charging line, to 2) RWST to the '13' Safety Injection train to reflect the isolation of the auxiliary charging line.
  • Instrument Air Compressor K-21B removed from Unit 2 protected equipment list for maintenance.

PBF-1 562 Revision 2 10130/02 Rcrerences: NP 10.3.6 NP 10.2.1 Page 5 of 9