ML052030216
ML052030216 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 06/02/2004 |
From: | Olvera J Nuclear Management Co |
To: | Office of Nuclear Reactor Regulation |
References | |
FOIA/PA-2004-0282 | |
Download: ML052030216 (3) | |
Text
CY . -d
. N-. Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: June 2,2004 Time: 1400 Preparer: John Olvera U I R 28 NOTE: Refer to base procedureNP 10.3.6for safety assessment checklist KSF definitions.
NOTE: WIheneverfuel has been removed from the reactor vessel and refueling cavity, all key safety functions are GREEN except spentfiel pool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY Subtotal Condition
- 1. RCS Boron concentration 3275 ppm a.) For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.) For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1 0-1 RED
- 2. Number of boration paths (0-2) 2 2 ORANGE
- 3. No fuel motion (0-1) 1 3-4 I.Wird8
- 4. SR instrumentation operable (0-1) 1 5 4 EN; Subtotal = 5 CORE COOLING Subtotal Condition
- 2. Refueling cavity filled (0-1) 0 2 ORANGE
- 3. Number of trains RHR available (0-2) 2 3 Ni;LMV
- 4. RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS Temperature = 1907F; 60 days shutdown RCS is solid, SIC tubes filled Subtotal = 5 RCS Time to Boil N/A (Applicable at Cold or Refueling Shutdown)
POWER AVAILABILITY Subtotal Condition
- 1. Independent off-site power sources I RED available to A-05 and A-06 (totally 2 ORANGE independent at the 4160 V, 13.8 kV, 3 J _
and 345 kV levels) (0-2) 2 4-5 CGREEN)
- 2. G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1
- 3. G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 0 Subtotal = 4 INVENTORY Subtotal Condition 0-1 RED
- 1. Pressurizer level 220 percent w/head on. (0-1) 1 2 ORANGE
- 2. Refueling Cavity filled (see definition) (0-3) 0 3 4L
- 3. RCS level above REDUCED INVENTORY (0-1) 1 4
- 4. Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal = 4 IntrmabointUs record was deeWd PBF-1562 inaccordance with tie Freedom of Inlornon V-1Q
References:
NP 10.3.6 Revision 2 10130/02 Act. exm 4P I of9 NP 10.2.1 Fow A4)-"- '10 &U
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT Subtotal Condition
- 1. Containment integrity (TS 15.11.D) (Containment 0 RED Operable) (ITS TS 3.6.1) set (O or 4) 0 1 ORANGE
- 2. Containment Closure CL-lE maintained 2-3
<2>
and closure < time to boil (Oor2) 2 4-5-6
- 3. No fuel motion (0-1) 1
- 4. DHR Capability:
- cavity flooded and internals out OR
- at least one SG available OR
- one fan cooler with Equip hatch installed and personnel hatches capable of being shut (0-1) 1 Subtotal = 4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
NOTE: Take creditforonly one P-12 independent offsite power source duringperiods of single X-03 or X-04 availability (*).
- Subtotal Condition
- 1. "A" SFP cooling pump available 0-1 RED with power available from: 2 ORANGE
- G-02 or G-01 via 2B-32 (0-1) NA 3 YELLOW
-(*) an independent off-site power 4-5 GREEN source different than that for Train B below (0-1) NA
- 2. "B" SFP cooling pump available with power available from:
- G-03 or G-04 via IB42 (0-1) NA
.(*) an independent off-site power source different than that for Train A above (0-1) NA
- 3. Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) NA SFP Temperatures: Subtotal = NA NW NA OF SE NA OF SFP Average Temp NA SFP Time to Boil NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
- One flow path for both Reactivity and Inventory changed from I) charging pump P-2C via the auxiliary charging line, to 2) RIVST to the 'B' Safety Injection train.
- Instrument Air Compressor K-2B removed from Unit 2 protected equipment list for maintenance.
PBF-1562
References:
NP 10.3.6 Revision 2 10/30/02 Page 2 of 9 NP 10.2.1
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: 1 . DATE: June 2, 2004 TIME: 1400 KEY SAFETY-FUNCTIONS:
REACTIVITY: GREEN CORE COOLING: GREEN POWER AVAILABLE: GREEN INVENTORY: GREEN CONTAINMENT: GREEN SFP COOLING: NA PROTECTED EOUIPMENT:
COMMENTS:
- One flow path for both Reactivity and Inventory changed from 1) charging pump P-2C via the auxiliary charging line, to 2) RWST to the '13' Safety Injection train to reflect the isolation of the auxiliary charging line.
- Instrument Air Compressor K-21B removed from Unit 2 protected equipment list for maintenance.
PBF-1 562 Rcrerences: NP 10.3.6 Revision 2 10130/02 Page 5 of 9 NP 10.2.1