Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML052030216
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/02/2004
From: Olvera J
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML052030216 (3)


Text

CY . -d

. N-. Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: June 2,2004 Time: 1400 Preparer: John Olvera U I R 28 NOTE: Refer to base procedureNP 10.3.6for safety assessment checklist KSF definitions.

NOTE: WIheneverfuel has been removed from the reactor vessel and refueling cavity, all key safety functions are GREEN except spentfiel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY Subtotal Condition

1. RCS Boron concentration 3275 ppm a.) For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.) For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1 0-1 RED
2. Number of boration paths (0-2) 2 2 ORANGE
3. No fuel motion (0-1) 1 3-4 I.Wird8
4. SR instrumentation operable (0-1) 1 5 4 EN; Subtotal = 5 CORE COOLING Subtotal Condition
1. Number of SG available for DHR (0-2) 2 0-1 RED
2. Refueling cavity filled (0-1) 0 2 ORANGE
3. Number of trains RHR available (0-2) 2 3 Ni;LMV
4. RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS Temperature = 1907F; 60 days shutdown RCS is solid, SIC tubes filled Subtotal = 5 RCS Time to Boil N/A (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1. Independent off-site power sources I RED available to A-05 and A-06 (totally 2 ORANGE independent at the 4160 V, 13.8 kV, 3 J _

and 345 kV levels) (0-2) 2 4-5 CGREEN)

2. G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1
3. G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 0 Subtotal = 4 INVENTORY Subtotal Condition 0-1 RED
1. Pressurizer level 220 percent w/head on. (0-1) 1 2 ORANGE
2. Refueling Cavity filled (see definition) (0-3) 0 3 4L
3. RCS level above REDUCED INVENTORY (0-1) 1 4
4. Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal = 4 IntrmabointUs record was deeWd PBF-1562 inaccordance with tie Freedom of Inlornon V-1Q

References:

NP 10.3.6 Revision 2 10130/02 Act. exm 4P I of9 NP 10.2.1 Fow A4)-"- '10 &U

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT Subtotal Condition

1. Containment integrity (TS 15.11.D) (Containment 0 RED Operable) (ITS TS 3.6.1) set (O or 4) 0 1 ORANGE
2. Containment Closure CL-lE maintained 2-3

<2>

and closure < time to boil (Oor2) 2 4-5-6

3. No fuel motion (0-1) 1
4. DHR Capability:

- cavity flooded and internals out OR

- at least one SG available OR

- one fan cooler with Equip hatch installed and personnel hatches capable of being shut (0-1) 1 Subtotal = 4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE: Take creditforonly one P-12 independent offsite power source duringperiods of single X-03 or X-04 availability (*).

  • Subtotal Condition
1. "A" SFP cooling pump available 0-1 RED with power available from: 2 ORANGE

- G-02 or G-01 via 2B-32 (0-1) NA 3 YELLOW

-(*) an independent off-site power 4-5 GREEN source different than that for Train B below (0-1) NA

2. "B" SFP cooling pump available with power available from:

- G-03 or G-04 via IB42 (0-1) NA

.(*) an independent off-site power source different than that for Train A above (0-1) NA

3. Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) NA SFP Temperatures: Subtotal = NA NW NA OF SE NA OF SFP Average Temp NA SFP Time to Boil NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
  • One flow path for both Reactivity and Inventory changed from I) charging pump P-2C via the auxiliary charging line, to 2) RIVST to the 'B' Safety Injection train.
  • Instrument Air Compressor K-2B removed from Unit 2 protected equipment list for maintenance.

PBF-1562

References:

NP 10.3.6 Revision 2 10/30/02 Page 2 of 9 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: 1 . DATE: June 2, 2004 TIME: 1400 KEY SAFETY-FUNCTIONS:

REACTIVITY: GREEN CORE COOLING: GREEN POWER AVAILABLE: GREEN INVENTORY: GREEN CONTAINMENT: GREEN SFP COOLING: NA PROTECTED EOUIPMENT:

COMMENTS:

  • One flow path for both Reactivity and Inventory changed from 1) charging pump P-2C via the auxiliary charging line, to 2) RWST to the '13' Safety Injection train to reflect the isolation of the auxiliary charging line.
  • Instrument Air Compressor K-21B removed from Unit 2 protected equipment list for maintenance.

PBF-1 562 Rcrerences: NP 10.3.6 Revision 2 10130/02 Page 5 of 9 NP 10.2.1