Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML052030207
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/30/2004
From: John Hanna
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML052030207 (3)


Text

Point Beach Nuclear Planit PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

May 30,2004 Time:

0200 Preparer:

James Hanna U

I R

28 NOTE:

Refer to base procedure NP 10.3. 6for safety assessment checklist KSF definitions.

NOTE:

If henever fuel has been removedfrom tle reactor vessel and refueling cavity, all key safetyfunctions are GREEN exceD! spent fuelpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration 2686 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Subtotal Condition RED ORANGE IQ&vl C<ED' (0-1) 1 (0-2) 2 (0-1)

I (0-1)

I 0-1 2

3-4 5

Subtotal =

5 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (&- RCPs bumped)

(0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 0 2

3.

Number of trains RHR available (0-2) 2 3

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS Temperature = 95F; 57 days shutdown RCS is solid, S/G tubes not filled Subtotal 3

RCS Time to Boil 126 min.

(Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition I.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

O k'

and 345 kV levels)

(0-2) 2 4-5 CGREEN:

2.

G-01 or G-02/A-05/B-03 available (0-1)

I G-03 or G-04/A-06/B-04 available (0-1)

I

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal 4

INVENTORY Subtotal Condition 0-1 RED

1.

Pressurizef level 220 percent w/head on (& RCPs bumped)

(0-1) 0 2

2.

Refueling Cavity filled (see definition)

(0-3) 0 3

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal=

3 ine ^

acoac with theFredo of do fomaed in accodanc Wft heof lgbmaom Act, exemp1ons m mi Page] of 9 W_ 0

References:

NP 10.3.6 NP 10.2.1 PBF-1562 Revision 2 10/30/02

Point Beach Nuclear Plant PBNP SIUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.1.D) {Containment Operable) {ITS TS 3.6.1) set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-I)

I Subtotal 0

1 2-3 4-5-6 Condition RED ORANGE

<M (0-1) 1 Subtotal =

4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 Independent offslte powersource during periods of single X-03 orX-04 availability (*).

1.

"A" SFP cooling pump available with power available from:

G-02 or G-01 via 2B-32

-(*) an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via I B42

.(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Subtotal 0-1 2

3 4-5 Condition RED ORANGE YELLOW GREEN (0-1)

NA (0-1)

NA (0-1)

NA (0-1)

NA (0-1)

NA SFP Temperatures:

NW NA

'F SE NA

'F SFP Average Temp NA SFP Time to Boil NA Subtotal=

NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

  • Core Cooling and Inventory wvill remain YELLOW until tle RCPs are bumped to ensure SG tubes are filled PBF-1 562 Revision2 10/30102

References:

NP 103.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

1 DATE:

iSlay 30, 2004 TIME:

0200 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

GREEN YELLOW GREEN YELLOW GREEN NA PROTECTED EQUIPMENT:

COMMENTS:

  • Core Cooling and Inventory wvil become GREEN after OP4B-060 (RCP A/B 10 minute run and vent)

PBF-1562 Revision 2 10/30/02

References:

NP 10.3.6 NP 10.2.1 Page 5 of 9