Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML052030195
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/28/2004
From: Leiker J
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML052030195 (3)


Text

NRAC..

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

May 28,2004 Time:

1300 Preparer:

Jon Leiker U

I R

28 NOTE:

Referto baseprocedure NP 10.3.6for safety assessment checklistKSF definitions.

NOTE:

Vheneverfuelhas been removedfrom the reactor vesselandrefueling cavity allkey safetyfunctions are GREEN excep t spent fuel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False =0, Yesitrue = I through 4 REACTIVITY I.

RCS Boron concentration >2200 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Subtotal Condition RED ORANGE dt_

(0-1) 1 (0-2) 2 (0-1) 1

' (0-1) 1 0-1 2

Subtotal-5 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (& RCPs bumped)

(0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 0 DRAWEE

3.

Number of trains RHR available (0-2) 2 6

4. e RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS Temperature = 94F; 55 days shutdown RCS Level >76% and rising Subtotal =

3 RCS Time to Boil 126 min.

(Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

l.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, and 345 kV levels)

(0-2) 2

2.

G-01 or G-02/A-051B-03 available (0-1) 1 G-03 or G-04/A-061B-04 available (0-l) 1

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal =

4 INVENTORY Subtotal Condition 0-1 RED

1.

Pressurizer level 220 percent wlhead on (& RCPs bumped) (0-1) 0

2.

Refueling Cavity filled (see definition)

(0-3) 0

(

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

G

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal =

3 Intflrmabon M s reo o wM s u*

in accordance with th Freedom of Informa~of.

Ac, exam po_

10/30102 PO=

Pagc V-40.

References:

NP 10.3.6 NP 10.2.1 PBF-1562 Revision 2

-I of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.1.D) (Containment Operable) (ITS TS 3.6.1 ) set

2.

Containment Closure CL-1E maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut

( or 4) 0

( or 2) 2 (0-1) 1 Subtotal

.0 1

2-3 5-6 Condition RED ORANGE

_<M>

(0-1)

I Subtotal =

4 SPENT FUEL POOL COOLING (ONLY APPUCABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 independent offsite power source during periods of single X-03 or X-04 availabily (*).

1.

"A' SFP cooling pump available with power available from:

G-2 or G-01 via 2B-32

.(*) an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via IB-42

-(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SEP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SFP Temperatures:

NW NA OF SE NA 0F SFP Average Temp NA 9F SFP Time to Boil NA Subtotal 1 2

3 4-5 Condition RED ORANGE YELLOW GREEN (0-1)

NA (0-1)

NA (0-1)

NA (0-a)

NA (0-1)

NA Subtotal. =

NA GIVE A BRIEF EXPLANATION OF ANY.CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

  • We will transition to Fire Protection Condition II when one S/G meets the reflux cooling requirements in SEP 1.1 (S/G tubes drained, vent path available, secondary makeup available, and SIG level above 400 inches). Fire rounds are credited as a fire prevention contingency.

Core Cooling and Inventory willremain YELLOW until the RCPs are bumped.

  • Credited flow paths for Reactivity and Inventbry were changed due to use of BAST water to fill/vent RCS.

PBF-1562 Revision 2 10/30/02 Page 2 of 9

References:

NP 103.6 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

1 DATE:

May 28,2004 TIME:

1300 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

GREEN YELLOW GREEN YELLOW CONTAINMENT:

SP COOLING:

- GREEN NA r

PROTECTED EOUIPMENT:

COMMENTS:

  • Core Cooling and Inventory will remain YELLOW until the RCPs are bumped.
  • We will transition to Fire Protection Condition I when one S/G meets the reflux cooling requirements in SEP 1.1 (S/G tubes drained, vent path available, secondary makeup available, and S/G level above 400 inches). Fire rounds are credited as a fire prevention contingency.

PBF-1562 Revision 2 10/30/02 ReLnces: NP 103.6 NP 10.2.1 Page 5 of 9