Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:
May 28,2004 Time:
1300 Preparer:
Jon Leiker U
I R
28 NOTE:
Referto baseprocedure NP 10.3.6for safety assessment checklistKSF definitions.
NOTE:
Vheneverfuelhas been removedfrom the reactor vesselandrefueling cavity allkey safetyfunctions are GREEN excep t spent fuel pool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False =0, Yesitrue = I through 4 REACTIVITY I.
RCS Boron concentration >2200 ppm a.)
For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)
For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C
- 2.
Number of boration paths
- 3.
No fuel motion
- 4.
SR instrumentation operable Subtotal Condition RED ORANGE dt_
(0-1) 1 (0-2) 2 (0-1) 1
' (0-1) 1 0-1 2
Subtotal-5 CORE COOLING Subtotal Condition
- 1.
Number of SG available for DHR (& RCPs bumped)
(0-2) 0 0-1 RED
- 2.
Refueling cavity filled (0-1) 0 DRAWEE
- 3.
Number of trains RHR available (0-2) 2 6
- 4. e RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS Temperature = 94F; 55 days shutdown RCS Level >76% and rising Subtotal =
3 RCS Time to Boil 126 min.
(Applicable at Cold or Refueling Shutdown)
POWER AVAILABILITY Subtotal Condition
- l.
Independent off-site power sources I
RED available to A-05 and A-06 (totally 2
ORANGE independent at the 4160 V, 13.8 kV, and 345 kV levels)
(0-2) 2
- 2.
G-01 or G-02/A-051B-03 available (0-1) 1 G-03 or G-04/A-061B-04 available (0-l) 1
- 3.
G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(0-1) 0 Subtotal =
4 INVENTORY Subtotal Condition 0-1 RED
- 1.
Pressurizer level 220 percent wlhead on (& RCPs bumped) (0-1) 0
- 2.
Refueling Cavity filled (see definition)
(0-3) 0
(
- 3.
RCS level above REDUCED INVENTORY (0-1) 1 4
G
- 4.
Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal =
3 Intflrmabon M s reo o wM s u*
in accordance with th Freedom of Informa~of.
Ac, exam po_
10/30102 PO=
Pagc V-40.
References:
NP 10.3.6 NP 10.2.1 PBF-1562 Revision 2
-I of 9
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT
- 1.
Containment integrity (TS 15.1.D) (Containment Operable) (ITS TS 3.6.1 ) set
- 2.
Containment Closure CL-1E maintained and closure < time to boil
- 3.
No fuel motion
- 4.
DHR Capability:
cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut
( or 4) 0
( or 2) 2 (0-1) 1 Subtotal
.0 1
2-3 5-6 Condition RED ORANGE
_<M>
(0-1)
I Subtotal =
4 SPENT FUEL POOL COOLING (ONLY APPUCABLE when starting AND during FULL CORE OFFLOADS)
NOTE:
Take creditfor only one P-12 independent offsite power source during periods of single X-03 or X-04 availabily (*).
- 1.
"A' SFP cooling pump available with power available from:
G-2 or G-01 via 2B-32
.(*) an independent off-site power source different than that for Train B below
- 2.
"B" SFP cooling pump available with power available from:
G-03 or G-04 via IB-42
-(*) an independent off-site power source different than that for Train A above
- 3.
Temporary power available to one SFP cooling pump, G-05 available, and SEP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
SFP Temperatures:
NW NA OF SE NA 0F SFP Average Temp NA 9F SFP Time to Boil NA Subtotal 1 2
3 4-5 Condition RED ORANGE YELLOW GREEN (0-1)
NA (0-1)
NA (0-1)
NA (0-a)
NA (0-1)
NA Subtotal. =
NA GIVE A BRIEF EXPLANATION OF ANY.CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
- We will transition to Fire Protection Condition II when one S/G meets the reflux cooling requirements in SEP 1.1 (S/G tubes drained, vent path available, secondary makeup available, and SIG level above 400 inches). Fire rounds are credited as a fire prevention contingency.
Core Cooling and Inventory willremain YELLOW until the RCPs are bumped.
- Credited flow paths for Reactivity and Inventbry were changed due to use of BAST water to fill/vent RCS.
PBF-1562 Revision 2 10/30/02 Page 2 of 9
References:
NP 103.6 NP 10.2.1
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
1 DATE:
May 28,2004 TIME:
1300 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
GREEN YELLOW GREEN YELLOW CONTAINMENT:
SP COOLING:
- GREEN NA r
PROTECTED EOUIPMENT:
COMMENTS:
- RCS Time to Boil is 126 minutes
- Core Cooling and Inventory will remain YELLOW until the RCPs are bumped.
- We will transition to Fire Protection Condition I when one S/G meets the reflux cooling requirements in SEP 1.1 (S/G tubes drained, vent path available, secondary makeup available, and S/G level above 400 inches). Fire rounds are credited as a fire prevention contingency.
PBF-1562 Revision 2 10/30/02 ReLnces: NP 103.6 NP 10.2.1 Page 5 of 9