Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML052030178
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/28/2004
From: John Hanna
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML052030178 (3)


Text

MRc gSq Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: May 28,2004 Time: 0200 Preparer: James Hanna LI R 28 NOTE: Refer to baseprocedure NP 10.3.6for safety assessment checklist KSF definitions.

NOTE: Wheneverfuel has been reinovedfrom the reactorvessel and refueling cavity, all key safely functions are GREEN except spentfuelpool cooling.

K/

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True-= I through 4 REACTIVITY Subtotal Condition

1. RCS Boron concentration = 3021 ppm a.) For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.) For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1 0-1 RED
2. Number of boration paths (0-2) 2 2 ORANGE
3. No fuel motion (0-1) I 3-4 GVNLNil
4. SR instrumentation operable (0-1) I 5 CAREN Subtotal = 5 CORE COOLING Subtotal Condition
1. Number of SG available for DHR (0-2) 0 0-1 RED
2. Refueling cavity filled (0-1) 0 2
3. Number of trains RHR available (0-2) 2 3 AELO
4. RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS Temperature = 92F; 55 days shutdown RCS Level = 70% Subtotal 3 RCS Time to Boil 98 min. (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1. Independent off-site power sources I RED available to A-05 and A-06 (totally 2 ORANGE independent at the 4160 V, 13.8 kV, 3 and 345 kV levels) (0-2) 2 4-5
2. G-0I or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06.1B-04 available (0-1) I
3. G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 0 Subtotal= 4 INVENTORY Subtotal Condition 0-1 RED
1. Pressurizer level 220 percent w/head on (0-1) 0 2
2. Refueling Cavity filled (see definition) (0-3) 0 3
3. RCS level above REDUCED INVENTORY (0-1) 1 4
4. Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal 3 Intrmabon I tinrecord was OeidO inaccordance wth the Freedom of Intorma PBF-I 562 Aoe exem eX

References:

NP 10.3.6 Revision 2 10/30/02 - _-2-Page I of 9 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT Subtotal Condition

1. Containment integrity (TS 15. .D) {Containment 0 RED Operable) {ITS TS 3.6.1) set (Oor 4) 0 1 ORANGE
2. Containment Closure CL- I E maintained 2-3

<M>

and closure < time to boil ( or 2) 2 4-5-6

3. No fuel motion (0-1) I
4. DHR Capability:

- cavity flooded and internals out OR

- at least one SG available OR

- one fan cooler with Equip hatch installed and personnel hatches capable of being shut (0-1) 1 Subtotal = 4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE: Take creditforonly one P-12 Independent offsile powersource duringperiods ofsingle X-03 orX-04 availability (*).

Subtotal Condition

1. "A" SFP cooling pump available 0-1 RED with power available from: 2 ORANGE

- G-02 or G-01 via 2B-32 (0-1) NA 3 YELLOW

-(*) an independent off-site power 4-5 GREEN source different than that for Train B below (0-1) NA

2. "B" SFP cooling pump available with power available from:

- G-03 or G-04 via IB-42 (0-1) NA

.*) an independent off-site power source different than that for Train A above (0-1) NA

3. Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) NA SFP Temperatures: Subtotal = NA NW NA OF SE NA 0F SFP Average Temp NA OF SFP Time to Boil NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

Shifted to shutdown fire protection Condition Il based on RCS intact. Both "A" and "B" SG's will be unavailable for short periods while draining and refilling with startup chemicals.

Fire rounds are being credited as a fire prevention contingency.

PBF-I 562

References:

NP 10.3.6 Revision 2 10/30/02 Paae 2 of 9 p in,) i

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: 1 DATE: May 28, 2004 TIME: 0200 KEY SAFETY FUNCTIONS:

REACTIVITY: GREEN CORE COOLING: YELLOW POWER AVAILABLE: GREEN INVENTORY: YELLOW CONTAINMENT: GREEN SFP COOLING: NA PROTECTED EQUIPMENT:

COMMENTS:

  • Fire Protection Condition 11: "A" and "B" SG's wvil be unavailable during drain and refill. Credit is taken for fire rounds as fire prevention contingency PBF-I 562

References:

NP 10.3.6 Revision 2 10/30/02 Page 5 of 9 NP 10.2.1