Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:
May 27, 2004 Time:
1300 Preparer:
Jon Leiker U
I R
28 NOTE:
Refer to base procedure AP 10.3.6for safety assessment checklist KSF definitions.
NOTE:
Wheneverfuel has been removedfroin the reactor vessel and refueling cavity, all key safet fiunctions are GREEN except spent fiel pool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY
- 1.
RCS Boron concentration = 3018 ppm a.)
For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)
For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1
- 2.
Number of boration paths (0-2) 2
- 3.
No fuel motion (0-1) 1
- 4.
SR instrumentation operable (0-1) 1 Subtotal 0-1 2
3-4 0
Condition RED ORANGE
,JEN Subtotal =
S CORE COOLING Subtotal Condition
- 1.
Number of SG available for DHR (0-2) 0 0-1 RED
- 2.
Refueling cavity filled (0-1) 0 2
- 3.
Number of trains RHR available (0-2) 2 0071%
- 4.
RCS level above REDUCED INVENTORY (0-1) 1. 9 RCS Temperature = 92"F; 54 days shutdown RCS Level = 70%
Subtotal =
3 RCS Time to Boil 98 min.
(Applicable at Cold or Refueling Shutdown)
POWVER AVAILABILITY Subtotal Condition
- 1.
Independent off-site power sources 1
RED available to A-05 and A-06 (totally 2
ORANGE independent at the 4160 V, 13.8 kV, and 345 kV levels)
(0-2) 2 C
R Nuf
- 2.
G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1
- 3.
G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(0-1) 0 Subtotal =
4 INVENTORY Subtotal Condition 0-1 RED
- 1.
Pressurizer level 220 percent * /head on (0-1) 0 2
- 2.
Refueling Cavity filled (see definition)
(0-3) 0 (D
- 3.
RCS level above REDUCED INVENTORY (0-1) 1 4
- 4.
Makeup from VCTIBLENDER and/or RWST available (0-2) 2 Subtotal =
3 Iniormabon in mns record wasdeled.
in accordance with the Freedom of Irormaon PBF.1562 10130/02 62 of 9 Revision 2 10130/02pcrd ~:
ams Page I of 9 V-36/
References:
NP 10.3.6 NP 10.2.1
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST I.
CONTAINMENT
- 1.
Containment integrity (TS 15.1.D) (Containment Operable) (ITS TS 3.6.1) set
- 2.
Containment Closure CL-IE maintained and closure < time to boil
- 3.
No fuel motion
- 4.
DHR Capability:
cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0
( or 2) 2 (0-1) 1 Subtotal 0
I 2-3 a-3-6 Condition RED ORANGE (0-1) 1 Subtotal =
4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
NOTE:
Take credit for only one P-12 independent offsite power source during periods of single X-03 or X-04 availability (*).
- 1.
"A" SFP cooling pump available with power available from:
G-02 or G-01 via 2B-32
-(*) an independent off-site power.
source different than that for Train B below
- 2.
"B" SFP cooling pump available with power available from:
G-03 or G-04 via IB42
-(*) an independent off-site power source different than that for Train A above
- 3.
Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
Subtotal 0-1 2
3 4-5 Condition RED ORANGE YELLOW GREEN (0-1)
NA (0-1)
NA (0-1)
NA (0-1) _A (0-1)
NA SFP Temperatures:
NNV NA OF SE NA OF SFP Average Temp NA SFP Time to Boil NA Subtotal =
NA OF GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
- TTB was calculated from SEP-i with vessel level at Y pipe and the 1.3 multiplier for being refueled. Note that TTB curve based on 50 days post shutdown was conservatively used (CAP056964).
PBF-1562 Revision 2 10/30/02 Page 2 of 9
References:
NP 10.3.6 NP 10.2.1
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
1 DATE:
May 27, 2004 TIME:
1300 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
CONTAINMENT:
SFP COOLING:
GREEN YELLOW GREEN YELLOW GREEN NA PROTECTED EQUIPMENT:
CONTMENTS:
- RCS Time to Boil is 98 minutes
- Fire Protection Condition III: Credit is taken for fire rounds as fire prevention contingency PBF 1562 Revision 2 10/30/02
References:
NP 10.3.6 NP 10.2.1 Page 5 of 9