Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:
May 27,2004 Time:
0200 Preparer:
Mike Meyer U
I R
28 NOTE:
Refer to base procedure NP 10.3.6for safety assessment checklistKSF definitions.
NOTE:
Wlheneverfuel has been removedfrom the reactor vessel and refueling cavity, all key safetyfunctions are GREEN except spent fuelpool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY
- 1.
RCS Boron concentration = 3018 ppm a.)
For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)
For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C
- 2.
Number of boration paths
- 3.
No fuel motion
- 4.
SR instrumentation operable Subtotal Condition RED ORANGE
.x_~ha (0-1) 1 (0-2) 2 (0-1) 1 (0-I)
I 0-1 2
3.4 5
Subtotal 5
CORE COOLING Subtotal Condition
- 1.
Number of SG available for DHR (0-2) 0 0-1 RED
- 2.
Refueling cavity filled (0-1) 0 2
C NL
- 3.
Number of trains RHR available (0-2) 2 3
- 4.
RCS level above REDUCED INVENTORY (0-1) 1 4-5 9
R RCS Temperature= 92'F; 54 days shutdown RCS Level = 70%
Subtotal 3
RCS Time to Boil 98 min.
(Applicable at Cold or Refueling Shutdown)
POWER AVAILABILITY Subtotal Condition
- 1.
Independent off-site power sources I
RED available to A-05 and A-06 (totally 2
ORANGE independent at the 4160 V, 13.8 kV, 3
and 345 kV levels)
(0-2) 2 4-5
- 2.
G-0I or G-021A-051B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1
- 3.
G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(0-1) 0 Subtotal 4
INVENTORY Subtotal Condition 0-1 RED
- 1.
Pressurizer level 220 percent W/head on (0-1) 0 2
L,
=
- 2.
Refueling Cavity filled (see definition)
(0-3) 0 3
- 3.
RCS level above REDUCED INVENTORY (0-1) 1 4
(44 )
- 4.
Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal e 3
intmrmabion in ms rcuwas WM in acordance Wthl the Freedom of tnlorma~ol PaeeI of 9
References:
NP 10.3.6 NP 10.2.1 PBF-1 562 Rpvkinn~ 1flflfl/fl
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT
- 1.
Containment integrity (TS 15.1.D) {Containment Operable) {ITS TS 3.6.1) set
- 2.
Containment Closure CL-IE maintained and closure < time to boil
- 3.
No fuel motion
- 4.
DHR Capability:
cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1) 1 Subtotal 0
I 2-3 4-5-6 Condition RED ORANGE
<EN (0-1)
I Subtotal -
4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
NOTE:
Take creditfor only one P-12 independent offsite power source during periods of single X-03 or X-04 availabilIy (*).
- 1.
"A" SFP cooling pump available with power available from:
G-02 or G-0I via 2B-32 an independent off-site power source different than that for Train B below
- 2.
"B" SFP cooling pump available with power available from:
G-03 or G-04 via I B-42 an independent off-site power source different than that for Train A above
- 3.
Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
Subtotal 0-1 2
3 4-5 Condition RED ORANGE YELLOW GREEN (0-1)
NA (0-1)
NA (0-1)
NA (0-1)
NA (0-1)
NA SFP` Temperatures:
NW NA OF SE NA OF SFP Average Temp NA SFP Time to Boil NA Subtotal = NA OF GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
- TTB was calculated from SEP-I with vessel level at -X pipe and the 1.3 multiplier for being refueled. Note that TT-1 curve based on 50 days post shutdown was conservatively used (CAP056964).
PBF-1562
References:
NP 10.3.6 Revi-inn 2 10130/02 D -n^ ) -AO I
- arn; £ Us :
NY 1U.2.1
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSM~lENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
1 DATE:
May27, 2004 TIME:
0200 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
CONTAINMENT:
SFP COOLING:
GREEN YELLOW GREEN YELLOW GREEN NA PROTECTED EQUIPMENT:
COMMENTS:
'N
- RCS Time to Boil is 98 minutes
- Fire Protection Condition III: Credit is taken for fire rounds as fire prevention contingency PBP-1562 Rpvicinn7 In/Il/t02 Referenccs: NP 103.6 NP 10.2.1 Page S of 9