Point Beach Nuclear Plant PBNP SHUTDOWNN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

May 25. 2004 Time:

0300 Preparer:

T. R. Branam U

I R

28 NOTE:

Refer to base procedure"P 10.3.6for safety assessment checklist KSFdefinitions.

INOTE.

1I71enever fidel h as been removed from JIhe reactor vessel and rifirelinqg cavity, all key safefu Snctions are GREENexcept spentfuelpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration = 3013 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1

2.

Number of boration paths (0-2) 2

3.

No fuel motion (0:1) 1

4.

SR instrumentation operable (0-1) 1 Subtotal Condition 0-1 RED 2

ORANGE 34

-JE.LW 5

Subtotal =

5 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1

2.

Refueling cavity filled (0-1) 0 2

3.

Number of trains RHR available (0-2) 2 3

4.

RCS level above REDUCED INVENTORY (0-1) 0 4-5 GREEN RCS Temperature = 80'F; 51 days shutdown RCS Level <55 %

Subtotal =

2 RCS Time to Boil 106 min.

(Applicable at Cold or Refueling Shutdown)

POWVER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

and 345 kV levels)

(0-2) 2 4-5

2.

G-0I or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal =

4 INVENTORY Subtotal Condition 0-1

1.

Pressurizer level 220 percent w/head on (0-1) 0 2

2.

Refueling Cavity filled (see definition)

(0-3) 0 3

3.

RCS level above REDUCED INVENTORY (0-1) 0 4

GREEN

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal =

2 Intormabori n tINs MMmwas Me in accordance vAth the Freedom of Inltmd Ad, por X

Rererences: NP 10.3.6 NP 10.2.1 DOFCI Cfi Revision2 1/3002 f

,Page I of 9

Point Beach Nuclear Plant PBNP SHUTDON' SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1. -

Containment integrity (TS 15.1.D) (Containment Operable) {ITS TS 3.6.1) set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1) 1 Subtotal 0

I 2-3 4-5-6 Condition RED ORANGE

<Mm>

(0-1) 1 Subtotal =

4

  • SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take credi for only one P-12 independent offsitepower source during periods of single X-03 or X-04 availability (*).

1.

"A" SFP cooling pump available with power available from:

G-02 or G-01 via 2B-32

-(*) an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via IB42

-('9 an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Subtotal 0-1 2

3 4-5 Condition RED

.ORANGE YELLOW GREEN (0-1)

NA (0-1)

NA (0-1)

NA (0-1)

NA (0-1)

NA SFP Temperatures:

NW NA OF SE NA 0F SFP Average Temp NA SFP Time to Boil NA Subtotal =

NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

  • Core Cooling to ORANGE due to RCS level < 55 %
  • Inventory to ORANGE due to RCS level < 55 %
  • Time to Boil at 106 min. due to 22% RPV level, calculated from SEP-I, Degraded RHR System Capability, with vessel level at 22%, 80 'F, 51 days, and the 1.3 multiplier credit is taken.

PBF-I 562 Revision 2 10130/02 Rererences: NP 10.3.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

1 DATE:

May 25, 2004 TIME:

0300 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

PONVER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

GREEN ORANGE GREEN ORANGE GREEN NA I

PROTECTED EQUIPMENT:

CONIMIIENTS: Fire Protection Condition III: Credit is taken for fire rounds as fire prevention contingency.

-.k

.JI

References:

NP 10.3.6 NP 10.2.1 PBF-1562 Revision 2 10/30/02 Page 5 of 9