Point Beach Nuclear Plant C3- ;q-7 PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:
May 24. 2004 Time:
0200 Preparer:
T. R. Branam U
I R
28 NOTE:
Refer to base procedure NP 10.3.6 for safety assessment checklist KSF definitions.
NOTE:
Whf eneverfuel has been removedfromn the reactor vessel and refueling cavity, all key safety functions are GREEN except spentfuelpool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY
- 1.
RCS Boron concentration = 3013 ppm a.)
For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)
For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C
- 2.
Number of boration paths
- 3.
No fuel motion
- 4.
SR instrumentation operable Subtotal Condition (0-1) 1 (0-2) 2 (0-1) 1 (0-1) 1 0- I RED 2
ORANGE 3-4
-YFT..OW 5.
Subtotal =
5 CORE COOLING a'
. Subtotal Condition
- 1.
Number of SG available for DHR (0-2) 0 0-1
- 2.
Refueling cavity filled (0-1) 0 2
(ORANGE)
- 3.
Number of trains RHR available (0-2) 2 3
- 4.
RCS level above REDUCED INVENTORY (0-1) 0 4-5 GREEN RCS Temperature = 80F; 50 days shutdown RCS Level <55 %
Subtotal 2
RCS Time to Boil 106 min.
(Applicable at Cold or Refueling Shutdown)
POWER AVAILABILITY Subtotal Condition
- 1.
Independent off-site power sources I
RED available to A-05 and A-06 (totally 2
ORANGE independent at the 4160 V, 13.8 kV, 3
and 345 kV levels)
(0-2) 2 4-5
- 2.
G-0 I or G-02/A-05/B-03 available (0-1)
I G-03 or G-04/A-06/B-04 available (0-1) 1
- 3.
G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(0-1) 0 Subtotal 4
INVENTORY Subtotal Condition 0-1
- 1.
Pressurizer level 220 percent W/head on (0-1) 0 2
ORAIdjGo
- 2.
Refueling Cavity filled (see definition)
(0-3) 0 3
- 3.
RCS level above REDUCED INVENTORY (0-1) 0 4
GREEN
- 4.
Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal 2
Intfrmpt~n In tINS recod was deleted in accordance wth t RFeedom of wa1ftm AcL ex Revvsio 2
/.
an o
References:
NP 10.3.6 NP 10.2.1 PBF-1 562 Revision 2 lO/3/02 Page I of 9
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT
- 1.
Containment integrity (TS 15.1).D) {Containment Operable) {ITS TS 3.6.1) set
- 2.
Containment Closure CL-IE maintained and closure < time to boil
- 3.
No fuel motion
- 4.
DHR Capability:
cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1) 1 Subtotal 0
2-3 4-5-6 Condition RED ORANGE (0-1) 1.
Subtotal =
4 L
SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
NOTE:
Take creditfor only one P-12 independent offsitepowversource during periods of single X-03 orX-04 availability (*).
- 1.
"A" SFP cooling pump available with power available from:
G-02 or G-O I via 2B-32
-(*) an independent off-site power source different than that for Train B below
- 2.
"B" SFP cooling pump available with power available from:
G-03 or G-04 via IB42
-(*) an independent off-site power source different than that for Train A above
- 3.
Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
Subtotal 0-1 2
3 4-5 Condition RED 1:
ORANGE YELLOW GREEN (0-1)
NA (0-1)
NA (0-1)
NA (0-1)
NA (0-1)
NA SFP Temperatures:
NW NA 0F SE NA 0
F SFP Average Temp NA SFP Time to Boil NA Subtotal =
NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
- Core Cooling to ORANGE due to RCS level < 55 % to remove Nozzle Dams
- Inventory to ORANGE due to RCS level < 55 % to remove Nozzle Dams
- Time to Boil changed to 106 min. due to draindown to 22% RPV level, calculated from SEP-1, Degraded RHR System Capability, with vessel level at 22%, 80 'F, 50 days. and the 1.3 multiplier credit is taken.
PBF-1562 Rererences: NP 1O.3 Revision 2 10/30/02 Page 2 of 9 NP I0.2 1.6 LI.
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
1 DATE:
May 24, 2004 TIME:
0200 KEY SAFETY FUNCTIONS:
REACTIVITY:
GREEN CORE COOLING:
ORANGE POWER AVAILABLE:
GREEN INVENTORY:
ORANGE CONTAINMENT:
G REEN SFP COOLING:
NA PROTECTED EOUIPMENT:
COMMEINTS: Fire Protection Condition III: Credit is taken for fire rounds as fire prevention RX contingency.
PBF-1562
References:
NP 10.3.6 Revision 2 10/30/02 Page5 of 9 NP 10.2.1