AR6C qv Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:
Mlay 23, 2004 Time:
0230 Preparer:
Mike Meyer U
I R
28 NOTE:
Refer to base procedure NP 10.3.6for safety assessment checklist KSF definitions.
NOTE:
Wheneverfuel has been removed from the reactor vessel and refueling cavity, all key safet functions are GREEN excent spentfuelpool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False = 0, YeslTrue = I through 4 REACTIVITY
- 1.
RCS Boron concentration = 3013 ppm a.)
For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)
For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C
- 2.
Number of boration paths
- 3.
No fuel motion
- 4.
SR instrumentation operable Subtotal Condition RED ORANGE (0-1) 1 (0-2) 2 (0-1) 1 (0-1) 1 0-1 2
334 5
Subtotal =
5 CORE COOLING Subtotal Condition
- 1.
Number of SG available for DHR (0-2) 0 0-1 RED
- 2.
Refueling cavity filled (0-1) 0 2
0R NaL
- 3.
Number of trains RHR available (0-2) 2 3
T
=LLO5in
- 4.
RCS level above REDUCED INVENTORY (0-1) 1 4-5 a
RCS Temperature = 81PF; 49 days shutdown RCS Level = Rod Latch Height Subtotal =
3 RCS Time to Boil 136 min.
(Applicable at Cold or Refueling Shutdown)
POWER AVAILABILITY Subtotal Condition
- 1.
Independent off-site power sources I
RED available to A-OS and A-06 (totally 2
ORANGE independent at the 4160 V, 13.8 kV, 3
and 345 kV levels)
(0-2) 2 4-5
- 2.
G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-061B-04 available (0-1) 1
- 3.
G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(0-1) 0 Subtotal =
4 INVENTORY Subtotal Condition 0-1 RED
- 1.
Pressurizer level 220 percent wlhead on (0-1) 0 2
- 2.
Refueling Cavity filled (see definition)
(0-3) 0 3
- 3.
RCS level above REDUCED INVENTORY (0-1) 1 4
G
- 4.
Makeup from VCTIBLENDER andlor RWST available (0-2) 2 Subtotal =
3 Inrom AAtSywl pb d wk in acwcdac th Fredom oInmftr PBF-1562
-ag ex r
1 of 9..
Revision 203/2 O~"
-ej,;
Page 1 of 9 V- //
References:
NP 10.3.6 NP 10.2.1
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT
- 1.
Containment integrity (TS 15.1.D) IContainment Operable) fITS TS 3.6.1) set
- 2.
Containment Closure CL-IE maintained and closure < time to boil
- 3.
No fuel motion
- 4.
DHR Capability:
cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut
( or 4) 0 (Oor2) 2 (0-1) 1 Subtotal 0
l 2-3 4-5-6 Condition RED ORANGE
-MMMN&I (0-1) 1 Subtotal =
4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
NOTE:
Take credit for only one P-12 independent offsite power source duringperiods of single X.03 or X-04 availability (*).
- 1.
"A" SFP cooling pump available with power available from:
G-02 or G-01 via 2B-32
-(*) an independent off-site power source different than that for Train B below
- 2.
"B" SFP cooling pump available with power available from:
G-03 or G-04 via IB-42
-(*) an independent off-site power source different than that for Train A above
- 3.
Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
SFP Temperatures:
NW NA 0F SE NA OF SFP Average Temp NA OF SFP Time to Boil NA Subtotal 0-1 2
3 4-5 Condition RED ORANGE YELLOW GREEN (0-1)
NA (0-1)
NA (0-1)
NA (0-1)
NA (0-1)
NA Subtotal =
NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
- Core Cooling to YELLOW due to draindown below rod latch height Inventory to YELLOW due to draindown below rod latch height
- Time to Boil changed to 136 min. due to draindown to RPV flange height PBF-1562 Revision 2 1t030/02 Page 2 of 9
References:
NP 10.3.6 NP 10.2.1
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
1 DATE:
May 23, 2004 TIME:
0230 KEY SAFETY FUNCTIONS:
REACTIVITY:
GREEN CORE COOLING:
YELLOW POWER AVAILABLE:
GREEN INVENTORY:
YELLOW CONTAINMENT:
GREEN SFP COOLING:
NA PROTECTED EQUIPMENT:
COMMENTS:
- Look Ahead: CORE COOLING and INVENTORY will go ORANGE once we draindown to less than 55%
Protected Equipment signs staged for OP14F Reduced Inventory
- RCS Time to Boil is 136 minutes due to draindown to RPV flange level
- Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency.
PBF-1562
References:
NP 10.3.6 Revision 2 1013/02 Page 5 of 10 NP 10.2.1
-