CAD System 3.6.3.1 3.6 CONTAINMENT SYSTEMS 3.6.3.1 Containment Atmosphere Dilution (CAD) System LCO 3.6.3.1 Two CAD subsystems shall be OPERABLE.
APPLICABILITY:
MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CAD subsystem A.1 Restore CAD subsystem 30 days inoperable.
to OPERABLE status.
B. Two CAD subsystems B.1 Verify by administrative 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable means that the hydrogen control function is AND maintained.
Once per 12 AND hours thereafter B.2 Restore one CAD 7 days subsystem to OPERABLE status.
C. Required Action and C.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
BFN-UNIT 1 3.6-40 Amendment No. 234, 249, 255