Tech Spec Pages for Amendment 255, Regarding Completion Time for Containment Atmosphere Dilution Subsystem Inoperability
ML052020182
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 07/18/2005
From:
NRC/NRR/DLPM
To:
CHERNOff, M H, NRR/DLPM, 301-415-4018
Shared Package
ML052020349 List:
References
TAC MC3960
Download: ML052020182 (1)


Text

-

CAD System 3.6.3.1 3.6 CONTAINMENT SYSTEMS 3.6.3.1 Containment Atmosphere Dilution (CAD) System LCO 3.6.3.1 Two CAD subsystems shall be OPERABLE.

APPLICABILITY:

MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CAD subsystem A.1 Restore CAD subsystem 30 days inoperable.

to OPERABLE status.

B. Two CAD subsystems B.1 Verify by administrative 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable means that the hydrogen control function is AND maintained.

Once per 12 AND hours thereafter B.2 Restore one CAD 7 days subsystem to OPERABLE status.

C. Required Action and C.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.

BFN-UNIT 1 3.6-40 Amendment No. 234, 249, 255