ML052000480

From kanterella
Jump to navigation Jump to search
Final Qa/Related Forms (Folder 1)
ML052000480
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 03/23/2005
From: D'Antonio J, Joubert S
Entergy Nuclear Operations, Operations Branch I
To: Conte R
Operations Branch I
Conte R
References
ES-201, ES-201-1
Download: ML052000480 (8)


Text

~

~~

3.
4.

Facility contact briefed on security and other requirements (C.2.c)

Corporate notification letter sent (C.2.d)

[5. Reference material due (C.1.e; C.3.c; Attachment 211 Y-Y rJ

~

ES-201 Examination Preparation Checklist F

o

~

ES-201-1 Date of Examination: y/z5/oJ -

Facility:

Z;aL Examinations Developed by:

Facility /

NRC (circle one)

I Target Date Chief Examiners initials Task Description (Reference) 7-

-180

1.

Examination administration date confirmed (C.1.a; C.2.a and b)

-1 20

2.

NRC examiners and facility contact assigned (C.1.d; C.2.e)

I T

~

-120

-120

(-901

-75

6. Integrated examination outline(s) due, including Foms ES-201-2. ES-201-3.

ES-301-1, ES-301-2, ES-301-5, ES-D-ls, ES-401-112. ES-401-3, and ES-401-4, as applicable (C.1.e and f; C.3.d)

-70

7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee (C.2.h; C.3.e)

-45

8. Proposed examinations (including written, walk-through JPMs. and scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6. and ES-401-6), and reference materials due (C.l.e, f, g and h; C.3.d)

-30

9.

Preliminary license applications (NRC Form 398s) due (C.l.I; C.2.g; ES-202)

-14

10. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; ES-202)

-14 1 1. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f)

~

~

12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g)

/r/l/

-14

-7

13. Written examinations and operating tests approved by NRC supervisor (C.2.i; C.3.h)

-7

14. Final applications reviewed; examination approval and waiver letters sent (C.2.i; Attachment 4; ES-204)

-7

15. Proctoringhmtten exam administration guidelines reviewed with facility licensee (C.3.k)

-7

16. Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i)

~~

Target dates are keyed to the examination date identified in the corporate notification letter.

They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

Applies only to examinations prepared by the NRC.

[ ]

ES-201, Page 24 of 27

ES-201 Examination Outline Quality Checklist Form ES-201-2 Item Facility:

Date of Examination:

Initials a I b ' I d Task Description R

I -

1.

W

a. Verify that the outline(s) fit@) the appropriate model, in accordance with ES-401.
b. Assess whether the outline was systematically and randomly prepared in accordance with Section D.1 of ES-401 and whether all KIA categories are appropriately sampled.
2.

S P

I E

c. Assess whether the outline overemphasizes any systems, evolutions, or generic topics.
d. Assess whether the justifications for deselected or rejected K/A statements are appropriate.

N

a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, and major transients.
3.

w I T

I M

U L

A T

0 R

b. Assess whether there are enough scenario sets (and spares) to test the projected number and mix of applicants in accordance with the expected crew composition and rotation schedule without compromising exam integrity, and ensure that each applicant can be tested using at least one new or significantly modified scenario, that no scenarios are duplicated from the applicants' audit test@), and that scenarios will not be repeated on subsequent days.
c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative and quantitative criteria specified on Form ES-301-4 and described in Appendix D.
4.
a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections.
a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:

(1) the outline(s) contain(s) the required number of control room and in-plant tasks distributed among the safety functions as specified on the form (2) task repetition from the last hw NRC examinations is \\M'thin the limits specified on the form (3) no tasks are duplicated from the applicants' audit test@)

(4) the number of new or m o d i tasks meets or exceeds the minimums specfed on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form.

b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:

(1) the tasks are distributed among the topics as specified on the form (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations

c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.

E N

1

b. Assess *ether the 10 CFR 55.41143 and 55.45 sampling is appropriate.

Ensure that K/A importance ratings (except for plant-specific priorities) are at least 2.5.

r u ' # fl w.3a fP

c.
d. Check for duplication and overlap among exam sections.

Check the entire exam for balance of coverage.

f. Assess whether the exam fits the appropriate job level (RO or SRO).

.'I P

e.
  1. / l N I B W

q Note:

  1. Independent NRC reviewer initial items in Column %"; chief examiner concurrence required.

ES-201, Page 25 of 27

ES-201 Examination Security Agreement Form ES-201-3

1.

Pre-Examination wb-I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.

as of the

2.

Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of L t ! t q ! a r. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

JOB TITLE / RESPONSIBILITY SIGNATURE (1)

DATE SIGNATURE (2)

DATE NOTE I a.

NOTES:

ES-201, Page 26 of 27

L I do confirm Mark Leone Joubert, Ste From:

Leone, Mark C.

Sent:

To:

Joubert, Stephen

Subject:

Tuesday, May 03,2005 9:03 PM RE: NRC EXAM SECURITY AGREEMENT From: Joubert, Stephen Sent: Tuesday, May 03, 2005 9:06 AM To: Leone, Mark C.; Cosentino, Michael; Montross, Richard; Cornax, Dennis; Bordas, Edward; Huron, Robert; Drown, Keith

Subject:

NRC EXAM SECURITY AGREEMENT Importance: High Hi, Please confirm the following to close out the security agreement for Unit 2 ILO NRC exam of 4/29/05. (I will be coming around today and tomorrow for signatures, but just in case I miss you).

To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered on 4/29/05. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

You can respond with something like "I do confirm"

Thanks, Steve

Joubert, S From:

Eccleston, Douglas Sent:

To:

Joubert, Stephen

Subject:

Tuesday, May 03, 2005 8:23 PM RE: NRC EXAM SECURITY AGREEMENT

Stephen, You probably will not get in touch with me because I am working midnights in the Unit 2 Control Room to keep my license active.

Concerning the security agreement for the Unit 2 ILO NRC exam of 4/29/05 To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered on 4/29/05. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

Douglas Eccleston From: Joubert, Stephen Sent: Tuesday, May 03, 2005 12:ll PM To: Eccleston, Douglas

Subject:

FW: NRC EXAM SECURITY AGREEMENT Importance: High Hi Doug, Please confirm the following to close out the security agreement for Unit 2 ILO NRC exam of 4/29/05. (I will be coming around today and tomorrow for signatures, but just in case I miss you).

To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered on 4/29/05. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

You can respond with something like I do confirm

Thanks, Steve

From: Joubert, Stephen Sent: Tuesday, May 03, 2005 8:50 AM To: 'robert heidecker'

Subject:

NRC EXAM SECURrPl AGREEMENT - POST EXAM Importance: High Hi Bob, Please confirm the following to close out the security agreement for Unit 2 ILO NRC exam of 4/29/05.

To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered on 4/29/05. From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

Note: Inadvertently involved in periodic testing while on the security agreement. NRC Lead Examiner notified, corrective actions submitted and accepted.

ES-401 Written Examination Quality Checklist Form ES-401-6 Facility Date of Exam Exam Level ROlSRO I

Initial Item Description a

b*

1.

Questions and answers are technically accurate and applicable to the facility.

2.
a.

NRC WAS are referenced for all questions.

3.
4.
b.

Facility learning objectives are referenced as available.

SRO questions are appropriate in accordance with Section D.2.d of ES401 If more than four RO and two SRO questions are repeated from the last two NRC licensing exams, the facility licensee's sampling process was random and systematic.

Question duplication from the license screeninglaudit exam was controlled as indicated below (check the item that applies) and appears appropriate:

the audit exam was systematically and randomly developed the audit exam was completed before the license exam was started

5.

the examinations were developed independently the licensee certifies that there is no duplication other (explain)

6.

Bank use meets limits (no more than 75 percent Bank Modified New from the bank, at least 10 percent new, and the rest new or modified); enter the actual RO I SRO-only question distribution(s) at right.

2.9'4-12 I 5 34\\16 I

7.

Between 50 and 60 percent of the questions on the RO Memory CIA exam are written at the comprehension1 analysis level; the SRO exam may exceed 60 percent if the randomly selected WAS support the higher cognitive levels; enter Referenceslhandouts provided do not give away answers or aid in the elimination of distractors.

the actual RO l SRO question distribution@.)

at right.

' 8 4L'Il 3 3

0.
9.

Question content conforms with specific WA statements in the previously approved examination outline and is appropriate for the tier to which they are assigned; deviations are justified.

10.

Question psychometric quality and format meet the guidelines in ES Appendix B.

11.

The exam contains the required number of one-point. multiple choice items; the total is correct and agrees with the value on the cover sheet.

Date

a. Author 4 I L J O Y b Facility Reviewer (*)
c. NRC Chief Examiner (#)
d. NRC Regional Supervisor Note:

The facility reviewer's initialslsignature are not applicable for NRC-developed examinations.

  1. Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.

ES-401, Page 29 of 33

ES-403 Written Examination Grading Form ES-403-1 Quality Checklist

/

Facility: LTA Date of Exam: 4/lS/ o 5 xam Level-Item Description

1.
2.
3.
4.
5.
6.

Clean answer sheets copied before grading Answer key changes and question deletions justified Applicants' scores checked for addition errors (reviewers spot check > 25% of examinations)

Grading for all borderline cases (80 k2% overall and 70 or 80, as applicable, *4% on the SRO-only) reviewed in detail All other failing examinations checked to ensure that grades are justified Performance on missed questions checked for training deficiencies and wording problems; evaluate validity of questions missed by half or more of the applicants Printed NameEignature and documented fUON.6

a. Grader Initials C

Date

b. Facility Reviewer(*)

5 :roc/G.&-

c. NRC Chief Examiner (*)

w -

w x

d. NRC Supervisor (*)

W I

/

I /

I k,

w :gq

-'d

c. NRC Chief Examiner (*) /,
d. NRC Supervisor (*)

W I

/

W

~~

(*)

The facility reviewer's signature is not applicable for examinations graded by the NRC; two independent NRC reviews are required.

ES-403, Page 5 of 5