PSEG Response Letter Regarding NRC Review of Use of the Executive Review Board Process
ML052000325
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 07/19/2005
From: Blough A
Division of Reactor Safety I
To: Levis W
Public Service Enterprise Group
References
Download: ML052000325 (4)


Text

July 19, 2005 Mr. William Levis Chief Nuclear Officer and President PSEG LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

PSEG RESPONSE LETTER REGARDING NRC REVIEW OF USE OF THE EXECUTIVE REVIEW BOARD PROCESS

Dear Mr. Levis:

This letter acknowledges receipt of your response letter dated July 1, 2005, discussing your re-assessment of the evidence of worker perceptions regarding the advisability of raising issues or challenging decisions in the current environment at the Salem and Hope Creek Generating Stations. You stated in your response that it is your view that employees will raise nuclear safety issues; however, you recognized indications that some employees are reluctant to raise other issues.

The NRC reviewed your response; and on July 13, 2005, Mr. Eugene Cobey, Chief, Projects Branch 3, NRC Region I, discussed the results of your re-assessment and planned corrective actions with Mr. Darin Benyak, Director Regulatory Assurance, PSEG. We understand that PSEG intends to implement corrective actions to address the reluctance of some employees to raise issues or challenge managements decisions. Specifically, PSEG intends to develop and implement continuing training on safety conscious work environment, develop and implement a corrective action excellence plan, and increase management focus on outlier organizations identified in the 2005 Synergy survey, among others.

The NRC will continue to review this issue, and the metrics you have developed to measure your progress, as part of our on-going assessment of the performance of the Salem and Hope Creek Generating Stations. If you have any questions on this matter, please contact Mr. Eugene Cobey at 610-337-5171.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and your response will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

A. Randolph Blough, Director Division of Reactor Safety

Mr. William Levis 2

Docket No:

50-272, 50-311, 50-354 License No:

DPR-70, DPR-75, NPF-57 cc:

T. Joyce, Salem Site Vice President G. Barnes, Hope Creek Site Vice President M. Gallagher, Vice President - Engineering and Technical Support W. F. Sperry, Director - Business Support D. Benyak, Director - Regulatory Assurance C. J. Fricker, Salem Plant Manager M. Massaro, Hope Creek Plant Manager J. J. Keenan, Esquire M. Wetterhahn, Esquire Consumer Advocate, Office of Consumer Advocate F. Pompper, Chief of Police and Emergency Management Coordinator J. Lipoti, Ph.D., Assistant Director of Radiation Programs, State of New Jersey K. Tosch - Chief, Bureau of Nuclear Engineering, NJ Dept. of Environmental Protection H. Otto, Ph.D., DNREC Division of Water Resources, State of Delaware N. Cohen, Coordinator - Unplug Salem Campaign W. Costanzo, Technical Advisor - Jersey Shore Nuclear Watch E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance

Mr. William Levis 3

Distribution:

S. Collins, RA M. Dapas, DRA R. Blough, DRS B. Holian, DRP E. Cobey, DRP B. Welling, DRP M. Gray, DRP, Senior Resident Inspector D. Orr, DRP, Senior Resident Inspector K. Venuto, DRP, Resident OA S. Lee, RI OEDO D. Collins, PM, NRR R. Ennis, (Backup) PM, NRR R. Laufer, NRR Region I Docket Room (with concurrences)

DOCUMENT NAME: E:\\Filenet\\ML052000325.wpd SISP Review Complete: EWC (Reviewers Initials)

After declaring this document An Official Agency Record it will/will not be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP RI/DRS NAME TWingfield/T VW Ecobey/EWC Bholian/BEH RBlough/ARB DATE 07/15/2005 07/15/2005 07/18/2005 07/19/2005 OFFICIAL RECORD COPY