Final As-Administered Administrative Jpms for the Monticello Initial Examination - May 2005
ML051990266
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/02/2005
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
References
50-263/05-301 50-263/05-301
Download: ML051990266 (63)


Text

QF-1030-11 Rev. 2 (FP-T-SAT-30)

Retention: Life of policy + 10yrs.

Disposition: Reviewer and Approver Retain in: Training Program File M/jlg Page 1 of 8 JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

OVERTIME RESTRICTIONS JPM NUMBER:

JPM-4 AWI-08.10.01-001 REV.

0 RELATED PRA INFORMATION:

None TASK NUMBER(S) /

TASK TITLE(S):

CR206.102 K/A NUMBERS:

Generic 2.1.1 Rating: 3.8/3.7 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

X EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

X Lab:

Time for Completion:

10 Minutes Time Critical:

NO Alternate Path / Faulted:

NO TASK APPLICABILITY:

SRO:

SRO/RO:

SRO/RO/NLO:

X Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.10.01-001, OVERTIME RESTRICTIONS, Rev. 0 M/jlg Page 2 of 8 JPM Number: JPM-4 AWI-08.10.01-001 JPM

Title:

Overtime Restrictions Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.10.01-001, OVERTIME RESTRICTIONS, Rev. 0 M/jlg Page 3 of 8 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

SIMULATOR SETUP:

None INITIAL CONDITIONS:

The task conditions are as follows:

You are a licensed operator The Reactor is at rated conditions No outages or power reductions are scheduled INITIATING CUES (IF APPLICABLE):

[STATE OPERATORS NAME] review your proposed work schedule per OW1-01.01 (OPERATIONS GROUP ORGANIZATION AND RESPONSIBILITY ASSIGNMENTS) including scheduled overtime, for the upcoming rotation to ensure compliance.

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.10.01-001, OVERTIME RESTRICTIONS, Rev. 0 M/jlg Page 4 of 8 JPM PERFORMANCE INFORMATION Required Materials:

PREPARED NON-OUTAGE ROTATING SCHEDULE General

References:

OWI-01.01, 4 AWI-08.10.01 Task Standards:

REVIEW WORK SCHEDULE FOR COMPLIANCE Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Critical: N Locates procedure(s) OWI-01.01 (OPERATIONS GROUP ORGANIZATION AND RESPONSIBILITY ASSIGNMENTS) and 4 AWI-08.10.01 (OVERTIME RESTRICTIONS AND FITNESS FOR DUTY REQUIREMENTS).

Standard:

Locates procedure(s)

NOTE: 4 AWI-08.10.01 may not be obtained until STEP 2.

Evaluator Note:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Critical: N Overtime work restrictions as established in 4 AWI-08.10.01 (OVERTIME RESTRICTIONS AND FITNESS FOR DUTY REQUIREMENTS) SHALL be adhered to in establishing the shift schedule.

Standard:

Locates procedure 4 AWI-08.10.01 Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.10.01-001, OVERTIME RESTRICTIONS, Rev. 0 M/jlg Page 5 of 8 Performance Step: 3 Critical: N Work schedules SHALL be established such that use of overtime is avoided to the extent practical. The objective SHALL be to have site personnel work a nominal 40-hour week while the site is in normal operation. When circumstances warrant overtime work, the requirements of this instruction SHALL be adhered to.

Standard:

Reviews procedure step.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical: N Excluding shift turnover time, site personnel SHALL NOT work more than:

A. 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> straight Operator reviews proposed work schedule and informs supervision of any errors.

Standard:

Determines that this requirement is met.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Critical: Y Excluding shift turnover time, site personnel SHALL NOT work more than:

B. 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24-hour period.

Operator reviews proposed work schedule.

Standard:

Determines that this requirement will be exceeded on the last Saturday.

NOTE: NOTIFICATION OF ERROR MAY OCCUR AT THE CONCLUSION OF THE REVIEW.

Evaluator Cue:

If notified of error, acknowledge as supervision.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.10.01-001, OVERTIME RESTRICTIONS, Rev. 0 M/jlg Page 6 of 8 Performance Step: 6 Critical: N Excluding shift turnover time, site personnel SHALL NOT work more than:

C. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48-hour period Operator reviews proposed work schedule.

Standard:

Determines that this requirement is met.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical: N Excluding shift turnover time, site personnel SHALL NOT work more than:

D. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7-day period.

Operator reviews proposed work schedule.

Standard:

Determines that this requirement is met.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Critical: N Excluding shift turnover time, site personnel SHALL NOT work more than:

E. 15 consecutive days without 2 consecutive days off.

Operator reviews proposed work schedule.

Standard:

Determines that this requirement will be met.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.10.01-001, OVERTIME RESTRICTIONS, Rev. 0 M/jlg Page 7 of 8 Performance Step: 9 Critical: N The following interpretation applies to the provisions of 4.2.2:

A. One day off after working 14 consecutive days does not violate the overtime work restrictions. The first workday after the day off will start the count for applying the next 15 consecutive day provision.

Operator reviews proposed work schedule.

Standard:

Determines that this requirement will be met.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Critical: Y A break of at least eight hours, including shift turnover time, SHALL be allowed between work periods. This allows the shift turnover time (typically 15 minutes) to be included in the eight-hour break.

Operator reviews proposed work schedule.

Standard:

Determines that this requirement will be exceeded on the last Friday.

NOTE: Notification of error may occur at the conclusion of the review.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Standard:

Operator informs evaluator that the task is completed.

Evaluator Cue:

Acknowledge Report Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

WHEN OPERATOR INFORMS THE EVALUATOR THAT THE TASK IS COMPLETE, STATE THE JPM IS COMPLETE.

Stop Time:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC, Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: (Optional)

M/jlg Page 8 of 8

QF-1030-11 Rev. 2 (FP-T-SAT-30)

Retention: Life of policy + 10yrs.

Disposition: Reviewer and Approver Retain in: Training Program File M/jlg Page 1 of 14 JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

INDEPENDENT VERIFICATION OF RCIC JPM NUMBER:

JPM-4 AWI-04.04.02-003 REV.

0 RELATED PRA INFORMATION:

None TASK NUMBER(S) /

TASK TITLE(S):

CR206.102 K/A NUMBERS:

Generic 2.1.29 Rating: 3.4/3.3 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

X EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

X Other:

Lab:

Time for Completion:

15 Minutes Time Critical:

NO Alternate Path / Faulted:

NO TASK APPLICABILITY:

SRO:

SRO/RO:

X SRO/RO/NLO:

Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC, Rev. 0 M/jlg Page 2 of 14 JPM Number: JPM-4 AWI-04.04.02-003 JPM

Title:

Independent Verification of RCIC Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC, Rev. 0 M/jlg Page 3 of 14 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

SIMULATOR SETUP:

Initialize to any IC where RCIC is operable.

Fill out Procedure 0255-08-IA-1 as follows:

Control Room Supervisor approval on coversheet.

Reason to Perform - Quarterly. (In conjunction with NO other tests.)

Fill in numbers and initial STEPS 1 through 75.

Place control switch for mo-2096 (cooling water supply) in the open position.

INITIAL CONDITIONS:

The task conditions are as follows:

The routine quarterly RCIC pump and valve surveillance has just been completed Through STEP 75.

Independent verification is now required.

You are an extra licensed operator and did not participate in the test up to this point.

INITIATING CUES (IF APPLICABLE):

[STATE OPERATORS NAME] The Control Room Supervisor directs you to perform the required independent verification, for the components in the Control Room, to assure the components are in an ECCS line-up. Perform STEP 76 of Test 0255-08-IA-1 (RCIC QUARTERLY PUMP & VALVE TEST).

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC, Rev. 0 M/jlg Page 4 of 14 JPM PERFORMANCE INFORMATION Required Materials:

TEST 0255-08-IA-1 General

References:

4 AWI-04.04.02 Task Standards:

Place the RCIC System in Standby Readiness Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

EVALUATOR NOTE:

THE CANDIDATE SHALL ENSURE VERIFICATION IS PERFORMED SEPARATELY FROM THE ACTIONS OF THE INDIVIDUAL POSITIONING THE COMPONENTS.

THE CANDIDATE SHALL NOT REPOSITION ANY COMPONENT ON THE CHECKLIST (4 AWI-04.04.02, SECTION 4.3.6.C).

VIOLATION OF EITHER OF THE ABOVE CONDITIONS SHOULD CONSTITUTE FAILURE OF THIS JPM.

Performance Step: 1 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

Pump Flow Controller, FIC-13-91 set to control flow 400 gpm.

Standard:

Operator observed FIC-13-91 set to control flow 400 gpm.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC, Rev. 0 M/jlg Page 5 of 14 Performance Step: 2 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

Verify FIC-13-91 in AUTO position.

Standard:

Operator observed verify FIC-13-91 in AUTO position.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

HO-8 Turbine control valve OPEN; red light on.

Standard:

Operator observed HO-8 Turbine control valve OPEN; red light on.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

MO-2080 OPEN; red light on; green light off.

Standard:

Operator observed MO-2080 OPEN; red light on; green light off.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC, Rev. 0 M/jlg Page 6 of 14 Performance Step: 5 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

MO-2078 Control Switch, 13A-S2, in AUTO position; green light on.

Standard:

Operator observed MO-2078 Control Switch, 13A-S2, in AUTO position; green light on.

Evaluator Cue:

NONE Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

MO-2076 Control Switch, 13A-S3, in AUTO position; red light on.

Standard:

Operator observed MO-2076 Control Switch, 13A-S3, in AUTO position; red light on.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

MO-2075 Control Switch, 13A-S1, in NEUTRAL position; red light on.

Standard:

Operator observed MO-2075 Control Switch, 13A-S1, in NEUTRAL position; red light on.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC, Rev. 0 M/jlg Page 7 of 14 Performance Step: 8 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

MO-2102 Control Switch, 13A-S4, in AUTO position; red light on.

Standard:

Operator observed MO-2102 Control Switch, 13A-S4, in AUTO position; red light on.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

MO-2101 Control Switch, 13A-S9, in AUTO position; green light on.

Standard:

Operator observed MO-2101 Control Switch, 13A-S9, in AUTO position; green light on.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

MO-2100 Control Switch, 13A-S10, in AUTO position; green light on.

Standard:

Operator observed MO-2100 Control Switch, 13A-S10, in AUTO position; green light on.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC, Rev. 0 M/jlg Page 8 of 14 Performance Step: 11 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

System components are in the normal standby condition:

AO-13-22 actuator-blue-neutral light on; green disc position light on.

Standard:

Operator observed AO-13-22 actuator-blue-neutral light on; green disc position light on.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

MO-2107 Control Switch, 13A-S5, in AUTO position; green light on.

Standard:

Operator observed MO-2107 Control Switch, 13A-S5, in AUTO position; green light on.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

MO-2106 Control Switch, 13A-S6 in AUTO position; green light on Standard:

Operator observed MO-2106 Control Switch, 13A-S6,, in AUTO position; green light on.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC, Rev. 0 M/jlg Page 9 of 14 Performance Step: 14 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

MO-2110 Control Switch, 13A-S7, in AUTO position; green light on.

Standard:

Operator observed MO-2110 Control Switch, 13A-S7, in AUTO position; green light on.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 15 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

CV-2082A and CV-2082B Control Switch, 13A-S11, in OPEN position; red lights on for both valves.

Standard:

Operator observed CV-2082A and CV-2082B Control Switch, 13A-S11, in OPEN position; red lights on for both valves.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 16 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

MO-2104 Control Switch, 13A-S21, in AUTO position; green light on.

Standard:

Operator observed MO-2104 Control Switch, 13A-S21, in AUTO position; green light on.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC, Rev. 0 M/jlg Page 10 of 14 Performance Step: 17 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

CV-2079, RCIC STEAM LINE DRAIN TRAP ST-2081 BYPASS, Control Switch, 13A-S13, in CLOSE position; green light on.

Standard:

Operator observed CV-2079, RCIC STEAM LINE DRAIN TRAP ST-2081 BYPASS, Control Switch, 13A-S13, in CLOSE position; green light on.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 18 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

MO-3502 Control Switch, HS-3502, in AUTO position; green light on.

Standard:

Operator observed MO-3502 Control Switch, HS-3502, in AUTO position; green light on.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 19 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

CV-2848 and CV-2849 Control Switch, 13A-S12, in CLOSE position; green lights on for both valves.

Standard:

Operator observed CV2848 and CV-2849 Control Switch, 13A-S12, in CLOSE position; green lights on for both valves.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC, Rev. 0 M/jlg Page 11 of 14 Performance Step: 20 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

Barometric Condenser Condensate Pump Control Switch, 13A-S14, in AUTO position; green light on.

Standard:

Operator observed Barometric Condenser Condensate Pump Control Switch, 13A-S14, in AUTO position; green light on.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 21 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

Barometric Condenser Vacuum Pump Control Switch, 13A-S15 in AUTO position; green light on.

Standard:

Operator observed Barometric Condenser Condensate Pump Control Switch, 13A-S15 in AUTO position; green light on.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 22 Critical: Y Perform independent verification that the following RCIC System components are in the normal standby condition:

MO-2096 Control Switch, 13A-S8, in AUTO position; green light on.

Standard:

Operator observed MO-2096 Control Switch, 13A-S8, in OPEN position; red light on.

Evaluator Cue:

The CRS will have another operator correct the position. Continue with the independent verification.

Evaluator Note:

Candidate may

  • this step and make a comment in the Comment Section of the procedure identifying the miss positioned valve. He may also wait to the end to make this comment.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC, Rev. 0 M/jlg Page 12 of 14 Performance Step: 23 Critical: N Perform independent verification that the following RCIC System components are in the normal standby condition:

Mechanical overspeed trip lights are off.

Standard:

Operator observed Mechanical overspeed trip lights are off.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 24 Critical: N Local RCIC verifications:

Panel C-296 Overspeed Trip Light OFF Overspeed Trip Mechanism RESET Front Standard Bearing Reservoir Drain Valve is CLOSED and capped Standard:

Operator instructed local plant operator to perform verifications.

Evaluator Cue:

When instructed to perform, replay as outplant operator that all verifications are satisfactory.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 25 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Standard:

Operator informs evaluator that the task is completed.

Evaluator Cue:

Acknowledge Report Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

WHEN OPERATOR INFORMS THE EVALUATOR THAT THE TASK IS COMPLETE, STATE THE JPM IS COMPLETE.

Stop Time:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

M/jlg Page 13 of 14 SIMULATOR SET-UP SHEET INITIAL CONDITIONS:

Any 100% IC.

SET UP INSTRUCTIONS:

Override lights for MO-2096 for both red and green lamps ON.

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC, Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: (Optional)

M/jlg Page 14 of 14

QF-1030-11 Rev. 2 (FP-T-SAT-30)

M/jlg Page 1 of 10 JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

ROD BLOCK MONITOR FUNCTIONAL TEST JPM NUMBER:

JPM-0045-001 REV.

0 RELATED PRA INFORMATION:

None TASK NUMBER(S) /

TASK TITLE(S):

CR215.107 Perform RBM Functional Test K/A NUMBERS:

2.2.12 Rating: SRO/RO:

3.0/3.4 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

X EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

X Other:

Lab:

Time for Completion:

20 Minutes Time Critical:

NO Alternate Path / Faulted:

NO TASK APPLICABILITY:

SRO:

SRO/RO:

X SRO/RO/NLO:

Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-0045-001, ROD BLOCK MONITOR FUNCTIONAL TEST, Rev. 0 M/jlg Page 2 of 10 JPM Number: JPM-0045-001 JPM

Title:

RBM Functional Test Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-0045-001, ROD BLOCK MONITOR FUNCTIONAL TEST, Rev. 0 M/jlg Page 3 of 10 JPM BRIEFING/TURNOVER (See MTCP-03.32, Figure 6.2)

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The task conditions are as follows:

The plant is at 100% power.

No other testing is in progress.

Test 0045 is being performed to satisfy quarterly requirement per Tech Specs. and is in progress.

The following LPRMs are bypassed due to faulty detectors:

28-29A 44-21C 20-13D 28-37D Nuclear Engineering has submitted the following list of control rods for use with this test:

RBM 7, two string rod 18-11 RBM 8, two string rod 46-27 RBM 7, three string rod 10-31 RBM 8, three string rod 34-19 RBM 7, four string rod 26-31 RBM 8, four string rod 34-43 You are the Balance of Plant Operator.

INITIATING CUES (IF APPLICABLE):

[STATE OPERATORS NAME] directs you to complete step 189 of Test Procedure 0045 to verify all control rod selections.

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-0045-001, ROD BLOCK MONITOR FUNCTIONAL TEST, Rev. 0 M/jlg Page 4 of 10 JPM PERFORMANCE INFORMATION Required Materials:

INITIALIZE THE SIMULATOR TO ANY IC WITH THE PLANT AT 100% POWER.

PROVIDE COPY OF TEST NO. 0045 TO OPERATOR.

General

References:

TEST NO. 0045 Task Standards:

COMPLETE PREREQUISITES #2 Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Critical: Y Review Attachments 1, 2 and 3, and choose control rods for Steps 192, 198, and 204 from each Attachment. Enter the rods below: (N/A if reason for performing procedure is No. 4.)

NOTE: Do not select a control rod with a bypassed C level detector in any of the surrounding strings.

Operator determines acceptable for RBM 7, two string rod 18-11, refer to attachment 1 of Procedure 0045 and ensure this rod meets the standard for Prerequisite # 2.

Standard:

Determined Rod 18-11 acceptable.

Evaluator Cue:

NOTE TO EVALUATOR: JPM steps 2-7 may be done in any order, but all must be done.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-0045-001, ROD BLOCK MONITOR FUNCTIONAL TEST, Rev. 0 M/jlg Page 5 of 10 Performance Step: 2 Critical: Y Review Attachments 1, 2 and 3, and choose control rods for Steps 192, 198, and 204 from each Attachment. Enter the rods below: (N/A if reason for performing procedure is No. 4.)

NOTE: Do not select a control rod with a bypassed C level detector in any of the surrounding strings.

Operator determines acceptable for RBM 8, two string rod 46-27, refer to attachment 1 of Procedure 0045 and ensure this rod meets the standard for Prerequisite # 2.

Standard:

Determined Rod 46-27 suggested by Nuclear Engineer to be unacceptable and picks any of the following Control Rods:

18-11 10-19 26-47 Evaluator Cue:

When candidate indicates that this rod is not acceptable for use then state the following: The Shift Manager directs you to select another 2 string rod for use.

NOTE TO EVALUATOR: This rod is not acceptable because LPRM 44-21C is bypassed. The candidate may select any of the following rods: 18-11, 10-19, or 26-47.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-0045-001, ROD BLOCK MONITOR FUNCTIONAL TEST, Rev. 0 M/jlg Page 6 of 10 Performance Step: 3 Critical: Y Review Attachments 1, 2 and 3, and choose control rods for Steps 192, 198, and 204 from each Attachment. Enter the rods below: (N/A if reason for performing procedure is No. 4.)

NOTE: Do not select a control rod with a bypassed C level detector in any of the surrounding strings.

Operator determines acceptable for RBM 7, three string rod 10-31, refer to attachment 2 of Procedure 0045 and ensure this rod meets the standard for Prerequisite # 2.

Standard:

Determined that Control Rod 10-31 is acceptable.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical: Y Review Attachments 1, 2 and 3, and choose control rods for Steps 192, 198, and 204 from each Attachment. Enter the rods below: (N/A if reason for performing procedure is No. 4.)

NOTE: Do not select a control rod with a bypassed C level detector in any of the surrounding strings.

Operator determines acceptable for RBM 8, three string rod 34-19, refer to attachment 2 of Procedure 0045 and ensure this rod meets the standard for Prerequisite # 2.

Standard:

Determined Control Rod 34-19 is unacceptable. Selects any other 3 string rod except 38-19 42-19 38-15 Evaluator Cue:

When candidate indicates that this rod is not acceptable for use then state the following: The Shift Manager directs you to select another 3 string rod for use.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-0045-001, ROD BLOCK MONITOR FUNCTIONAL TEST, Rev. 0 M/jlg Page 7 of 10 Performance Step: 5 Critical: Y Review Attachments 1, 2 and 3, and choose control rods for Steps 192, 198, and 204 from each Attachment. Enter the rods below: (N/A if reason for performing procedure is No. 4.)

NOTE: Do not select a control rod with a bypassed C level detector in any of the surrounding strings.

Operator determines acceptable for RBM 7, four string rod 26-31, refer to attachment 3 of Procedure 0045 and ensure this rod meets the standard for Prerequisite # 2.

Standard:

Determined Rod 26-31 is acceptable.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical: Y Review Attachments 1, 2 and 3, and choose control rods for Steps 192, 198, and 204 from each Attachment. Enter the rods below: (N/A if reason for performing procedure is No. 4.)

NOTE: Do not select a control rod with a bypassed C level detector in any of the surrounding strings.

Operator determines acceptable for RBM 8, four string rod 34-43, refer to attachment 3 of Procedure 0045 and ensure this rod meets the standard for Prerequisite # 2.

Standard:

Determined Rod 34-43 is acceptable.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-0045-001, ROD BLOCK MONITOR FUNCTIONAL TEST, Rev. 0 M/jlg Page 8 of 10 Performance Step: 7 Critical: Y Review Attachments 1, 2 and 3, and choose control rods for Steps 192, 198, and 204 from each Attachment. Enter the rods below: (N/A if reason for performing procedure is No. 4.)

NOTE: Do not select a control rod with a bypassed C level detector in any of the surrounding strings.

Operator initials Shift Supervision approval line for this prerequisite or if RO candidate informs Shift Supervision that the prerequisite is complete.

Standard:

Determined prerequisite complete.

Evaluator Cue:

If RO candidate informs CRS that initial prerequisite can now be met.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Standard:

Operator informs evaluator that the task is completed.

Evaluator Cue:

Acknowledge Report Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

WHEN REPORT IS MADE THAT TASK IS COMPLETE, STATE THAT THE JPM IS COMPLETE.

Stop Time:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-0045-001, ROD BLOCK MONITOR FUNCTIONAL TEST, Rev. 0 M/jlg Page 9 of 10 SIMULATOR SET UP: (Modify table as necessary)

Simulator Setup Instructions:

Initialize the simulator to any IC with the plant at 100% power.

EVENT NUMBER EVENT FILE NAME EVENT WORD DESCRITPTION

1.
2.

SIMULATOR - MALFUNCTIONS:

MALF ID MALFUNCTION TITLE DELAY RAMP EVENT VALUE FINAL.

1.

None 00:00:00 00:00:00

2.

00:00:00 00:00:00

3.

00:00:00 00:00:00

4.

00:00:00 00:00:00 SIMULATOR - OVERRIDES:

OVERRIDE ID.

OVERRIDE DESCRIPTION DELAY RAMP EVENT VALUE FINAL

1.

None 00:00:00 00:00:00

2.
3.
4.

SIMULATOR - REMOTE FUNCTIONS:

REMOTE FUNC. No.

REMOTE FUNCTION TITLE DELAY RAMP EVENT VALUE FINAL

1.
2.

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-0045-001, ROD BLOCK MONITOR FUNCTIONAL TEST, Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: (Optional)

M/jlg Page 10 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

M/jlg Page 1 of 9 JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

HIGH RADIATION AREA ENTRY JPM NUMBER:

JPM-4 AWI-08.04.06-001 REV.

0 RELATED PRA INFORMATION:

None TASK NUMBER(S) /

TASK TITLE(S):

CR999.299 ADMINISTRATIVE PROCEDURES K/A NUMBERS:

2.3.10 Rating: SRO/RO:

3.3/2.9 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

X Perform:

EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

Lab:

X Time for Completion:

15 Minutes Time Critical:

NO Alternate Path / Faulted:

NO TASK APPLICABILITY:

SRO:

SRO/RO:

SRO/RO/NLO:

X Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.04.06-001 HIGH RADIATION AREA ENTRY, Rev. 0 M/jlg Page 2 of 9 JPM Number: JPM-4 AWI-08.04.06-001 JPM

Title:

HIGH RADIATION AREA ENTRY Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.04.06-001 HIGH RADIATION AREA ENTRY, Rev. 0 M/jlg Page 3 of 9 JPM BRIEFING/TURNOVER (See MTCP-03.32, Figure 6.2)

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The task conditions are as follows:

The plant is at 100% power.

An entry into Rad Waste Pump Room 985 level must be performed to inspect a potential blockage of the T-24 (waste collector tank) drain valve located at the south end of the tank.

Provide Survey Map Provide RWP INITIATING CUES (IF APPLICABLE):

[STATE OPERATORS NAME] perform the specific instructions per 4 AWI-08.04.06 for entry into the posted high radiation area for the inspection.

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.04.06-001 HIGH RADIATION AREA ENTRY, Rev. 0 M/jlg Page 4 of 9 JPM PERFORMANCE INFORMATION Required Materials:

SURVEY MAP AND RWP FOR HI RADIATION AREA TO BE ENTERED General

References:

4 AWI-08.04.06, AREA CONTROL Task Standards:

PERFORM INDIVIDUAL EXPOSURE CONTROL DUTIES Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Critical: N Provided a copy of 4 AWI-08.04.06 (AREA CONTROL) reviews procedure and locates Section 4.4.2 specific instructions for high, locked high, and very high radiation areas.

Standard:

Locates appropriate section of procedure.

Evaluator Cue:

Provide copy of procedure 4 AWI-08.04.06 (AREA CONTROL)

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.04.06-001 HIGH RADIATION AREA ENTRY, Rev. 0 M/jlg Page 5 of 9 Performance Step: 2 Critical: N Specific instructions for high, lock high, and very high radiation areas.

A. Obtain any required special approvals as follows:

1. locked high radiation area:

Non-routine entries under extended RWPs require completion of form 5677 (rwp request) and the signature of your supervisor (if on site), the shift supervisor, or the Rad Prot Coord to show concurrence with the need for the entry. supervisors may approve their own entries.

2. Very high radiation area you SHALL obtain written approval from the plant manager, which is based on a sound operational or safety reason.

Determines neither of the above conditions apply as the entry is for a high radiation area.

Standard:

Determines step is not applicable.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical: N A radiological briefing from radiation protection is required prior to entry.

Standard:

Determines that a radiological briefing must be performed.

Evaluator Cue:

State that the radiological briefing has been performed.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.04.06-001 HIGH RADIATION AREA ENTRY, Rev. 0 M/jlg Page 6 of 9 Performance Step: 4 Critical: Y Prepare to perform your individual exposure control duties as follows:

1. You SHALL determine the expected area does rates for all regions of the area you will be entering by reviewing area survey.

Reviews areas surveys provided and determines the dose rate for the inspection is 400Mrem/hr.

Standard:

Determined dose rate will be 400 Mrem/hr.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Critical: Y Prepare to perform your individual exposure control duties as follows:

2. Determine the expected duration of the entry and the expected dose needed to make the entry.

Operator determines expected dose using determined dose rate and given duration of entry.

Standard:

Determined expected dose to be 100 Mrem.

Evaluator Cue:

State the expected duration of the entry is 15 minutes.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical: N Prepare to perform your individual exposure control duties as follows:

3. IF a dose rate meter is required by the RWP, THEN obtain a meter from main access control.

Operator determines no meter is required from the RWP.

Standard:

Determines no meter is required.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.04.06-001 HIGH RADIATION AREA ENTRY, Rev. 0 M/jlg Page 7 of 9 Performance Step: 7 Critical: Y Prepare to perform your individual exposure control duties as follows:

4. Determine the allowable entry dose, either from the electronic dosimeter login process, from the local control point, or from your dosimeter.

Operator determines the allowable entry dose from the dosimeter and notes it to be 50 Mrem/hr from the RWP.

Standard:

Determined allowable entry dose.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Critical: Y Prepare to perform your individual exposure control duties as follows:

5. IF the allowable entry dose is less than the expected entry dose, THEN you SHALL report to the Rad Prot Coord for resolution.

Operator determines the allowable entry dose is less than the expected entry dose and reports to the Rad Prot Coord.

Standard:

Reports to Rad Prot Coord that allowable dose is less than expected dose.

Evaluator Cue:

Acknowledge report as the Rad Prot Coord.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

WHEN REPORT IS MADE, STATE THAT THE JPM IS COMPLETE.

Stop Time:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.04.06-001 HIGH RADIATION AREA ENTRY, Rev. 0 M/jlg Page 8 of 9 SIMULATOR SET UP: (Modify table as necessary)

Simulator Setup Instructions:

Initialize the simulator to any IC with the plant at 100% power.

EVENT NUMBER EVENT FILE NAME EVENT WORD DESCRITPTION

1.
2.

SIMULATOR - MALFUNCTIONS:

MALF ID MALFUNCTION TITLE DELAY RAMP EVENT VALUE FINAL.

1.

None 00:00:00 00:00:00

2.

00:00:00 00:00:00

3.

00:00:00 00:00:00

4.

00:00:00 00:00:00 SIMULATOR - OVERRIDES:

OVERRIDE ID.

OVERRIDE DESCRIPTION DELAY RAMP EVENT VALUE FINAL

1.

None 00:00:00 00:00:00

2.
3.
4.

SIMULATOR - REMOTE FUNCTIONS:

REMOTE FUNC. No.

REMOTE FUNCTION TITLE DELAY RAMP EVENT VALUE FINAL

1.
2.

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-0045-001, ROD BLOCK MONITOR FUNCTIONAL TEST, Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: (Optional)

M/jlg Page 9 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

Retention: Life of policy + 10yrs.

Disposition: Reviewer and Approver Retain in: Training Program File M/jlg Page 1 of 7 JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

TEMPORARY MODIFICATION VERIFICATION OF ELECTRICAL JUMPER JPM NUMBER:

JPM-4 AWI-05.08.03-001 REV.

0 RELATED PRA INFORMATION:

None TASK NUMBER(S) /

TASK TITLE(S):

SS299.162 K/A NUMBERS:

2.2.11 Rating: SRO/RO:

3.4/2.5 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

X EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

X Other:

Lab:

Time for Completion:

20 Minutes Time Critical:

NO Alternate Path / Faulted:

NO TASK APPLICABILITY:

SRO:

X SRO/RO:

SRO/RO/NLO:

Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-05.08.03-001 (TEMPORARY MODIFICATION VERIFICATION OF ELECTRICAL JUMPER) Rev. 0 M/jlg Page 2 of 7 JPM Number: JPM-4 AWI-05.08.03-001 JPM

Title:

Temporary Modification Verification of Electrical Jumper Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-05.08.03-001 (TEMPORARY MODIFICATION VERIFICATION OF ELECTRICAL JUMPER) Rev. 0 M/jlg Page 3 of 7 JPM BRIEFING/TURNOVER (See MTCP-03.32, Figure 6.2)

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

The task conditions are as follows:

The plant is operating at 100% power.

HPCI is in a normal standby lineup.

A Temporary Modification has been initiated for an electrical jumper and needs to be verified.

You are an extra senior licensed operator.

INITIATING CUES (IF APPLICABLE):

[STATE OPERATORS NAME] you are directed to verify that the proposed electrical jumper is correct per 4 AWI-05.08.03 step 4.1.4. Inform me when your action(s) are complete.

Provide the operator a marked up copy of Form QF-0540 to be used for verification.

ALL OPERATOR ACTIONS ARE TO BE SIMULATED.

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-05.08.03-001 (TEMPORARY MODIFICATION VERIFICATION OF ELECTRICAL JUMPER) Rev. 0 M/jlg Page 4 of 7 JPM PERFORMANCE INFORMATION Required Materials:

NONE General

References:

4 AWI-05.08.03, LOGIC DIAGRAMS NX-8292-12-1 AND NX-8292-12-3 Task Standards:

VERIFIES QF-0540 Temporary Modification Control Form Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Critical: N Locate procedure 4 AWI-05.08.03 Operator locates procedure 4 AWI-04.04.03 and refers to Step 4.1.4.

Standard:

Located procedure and referred to Step 4.1.4.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-05.08.03-001 (TEMPORARY MODIFICATION VERIFICATION OF ELECTRICAL JUMPER) Rev. 0 M/jlg Page 5 of 7 Performance Step: 2 Critical: Y Whenever electrical circuits are modified, the TMod SHALL require configuration verification. The verification SHALL be documented in the Tmod Package, a procedure pre-requisite or a WO step, as appropriate.

Operator obtains LOGIC DIAGRAMS NX-8292-12-1 AND NX-8292-12-3 Standard:

Obtains logic diagrams Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical: Y Whenever electrical circuits are modified, the TMod SHALL require configuration verification. The verification SHALL be documented in the Tmod Package, a procedure pre-requisite or a WO step, as appropriate.

Operator determines jumper will simulate MO-2036 is OPEN.

Standard:

Operator determines jumper will simulate MO-2036 is OPEN.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical: Y Whenever electrical circuits are modified, the TMod SHALL require configuration verification. The verification SHALL be documented in the Tmod Package, a procedure pre-requisite or a WO step, as appropriate.

Operator verifies alarms 3-A-15, 3-A-39, and 3-B-9 would alarm when jumper is installed.

Standard:

Operator verifies alarms 3-A-15, 3-A-39, and 3-B-9 would alarm when jumper is installed.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-05.08.03-001 (TEMPORARY MODIFICATION VERIFICATION OF ELECTRICAL JUMPER) Rev. 0 M/jlg Page 6 of 7 Performance Step: 5 Critical: N Operator notifies evaluator that the Tmod jumper is correct.

Standard:

Operator notifies evaluator that the Tmod jumper is correct.

Evaluator Cue:

When told the verification is complete, state JPM is complete.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When told the verification is complete, state JPM is complete.

Stop Time:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-05.08.03-001 (TEMPORARY MODIFICATION VERIFICATION OF ELECTRICAL JUMPER) Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: (Optional)

M/jlg Page 7 of 7

QF-1030-11 Rev. 2 (FP-T-SAT-30)

Retention: Life of policy + 10yrs.

Disposition: Reviewer and Approver Retain in: Training Program File M/jlg Page 1 of 6 JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

DETERMINE CURRENT PROCEDURE REVISION JPM NUMBER:

JPM-4 AWI-02.01.02-001 REV. 0 RELATED PRA INFORMATION:

None TASK NUMBER(S) /

TASK TITLE(S):

SS299.292 IMPLEMENT THE PROCEDURE USE STANDARDS THAT WILL ENSURE THAT OPERATIONAL PROCEDURES ARE EFFECTIVELY IMPLEMENTED K/A NUMBERS:

2.1.21 Rating: SRO/RO:

3.2/3.1 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

X Perform:

EVALUATION LOCATION:

In-Plant:

X Control Room:

Simulator:

Other:

Lab:

Time for Completion:

15 Minutes Time Critical:

NO Alternate Path / Faulted:

NO TASK APPLICABILITY:

SRO:

X SRO/RO:

SRO/RO/NLO:

Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-02.01.02-001, DETERMINE CURRENT PROCEDURE REVISION, Rev. 0 M/jlg Page 2 of 6 JPM Number: JPM-4 AWI-02.01.02-001 JPM

Title:

Determine Current Procedure Revision Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-02.01.02-001, DETERMINE CURRENT PROCEDURE REVISION, Rev. 0 M/jlg Page 3 of 6 JPM BRIEFING/TURNOVER (See MTCP-03.32, Figure 6.2)

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

Core spray comprehensive pump and valve test, 0255-03-III-1A is scheduled to be performed.

The Reactor is operating at rated conditions.

INITIATING CUES (IF APPLICABLE):

OBTAIN TEST 0255-03-III-1A AND VERIFY IT IS THE CURRENT REVISION ALL OPERATOR ACTIONS ARE TO BE PERFORMED.

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-02.01.02-001, DETERMINE CURRENT PROCEDURE REVISION, Rev. 0 M/jlg Page 4 of 6 JPM PERFORMANCE INFORMATION Required Materials:

General

References:

Task Standards:

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Critical: N Obtains copy of Test 0255-03-III-1A Standard:

Obtains test procedure.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Test procedure may be obtained from file cabinet in the work Control Area or document control.

Performance Step: 2 Critical: N The current revision of the document SHALL be verified by one of the following methods:

A. Consult the database via the computer terminal (see Section 4.3 for instructions on accessing controlled document database).

Standard:

Attempts to log into Champs database.

Evaluator Cue:

Inform the operator that the document control database is unavailable for use at this time.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

If the candidate chooses to contact document control, see STEP 7.

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-02.01.02-001, DETERMINE CURRENT PROCEDURE REVISION, Rev. 0 M/jlg Page 5 of 6 Performance Step: 3 Critical: Y The current revision of the document SHALL be verified by one of the following methods:

B. Check the controlled document master file in the Site Admin Building.

1. For procedures, verify that any 3087 Categories A, B, E and G, is addressed as part of the procedure being used.

Standard:

Locates master and verifies categories A, B, E and G is addressed.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical: N The current revision of the document SHALL be verified by one of the following methods:

C. Contact appropriate personnel in documents and records management group for assistance.

Standard:

Attempts to contact a member of this group.

Evaluator Cue:

If this option is attempted, state that no one in this group can be contacted.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Standard:

Operator informs evaluator that the task is completed.

Evaluator Cue:

Acknowledge task complete, state that JPM is complete.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

DO NOT PROMPT.

Terminating Cues:

Stop Time:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-02.01.02-001, DETERMINE CURRENT PROCEDURE REVISION, Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: (Optional)

M/jlg Page 6 of 6

QF-1030-11 Rev. 2 (FP-T-SAT-30)

Retention: Life of policy + 10yrs.

Disposition: Reviewer and Approver Retain in: Training Program File M/jlg Page 1 of 9 JOB PERFORMANCE MEASURE (JPM)

SITE:

MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE:

OFF-SITE PROTECTIVE ACTION RECOMMENDATIONS JPM NUMBER:

JPM-A.2-204-003 REV.

2 RELATED PRA INFORMATION:

None TASK NUMBER(S) /

TASK TITLE(S):

SS304.121 Formulate off-site protective action recommendations for the general public during the early phase of an emergency.

K/A NUMBERS:

Generic 2.4.44 Rating: SRO/RO:

4.0/2.1 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

X EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

X Other:

Lab:

Time for Completion:

12 Minutes Time Critical:

YES Alternate Path / Faulted:

NO TASK APPLICABILITY:

SRO:

X SRO/RO:

SRO/RO/NLO:

Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor (See JPM Validation Checklist, Attachment 1)

Date Approved by:

Training Supervisor Date

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-A.2-204-003, OFF-SITE PROTECTIVE ACTION RECOMMENDATIONS, Rev. 2 M/jlg Page 2 of 9 JPM Number: JPM-A.2-204-003 JPM

Title:

Off-Site Protective Action Recommendations Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Comments SHALL be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-A.2-204-003, OFF-SITE PROTECTIVE ACTION RECOMMENDATIONS, Rev. 2 M/jlg Page 3 of 9 JPM BRIEFING/TURNOVER (See MTCP-03.32, Figure 6.2)

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

THIS IS A DRILL.

The plant is shutdown in an Emergency Condition. An escalation to a General Emergency has just been declared (EAL Guideline 28, Section E.).

All release rates are normal.

Current Met Data is:

Wind direction (from) Ch. 5: 285 degrees Wind speed: Ch. 4 10 mph Temperature: 55°F Precipitation: none Ch. 11 - Diff. Temp: -0.79 INITIATING CUES (IF APPLICABLE):

THIS IS A DRILL.

Initiate and complete Form 5790-102-02 (MONTICELLO EMERGENCY NOTIFICATION REPORT FORM) and provide to the SEC.

The SEC will require 3 minutes to review the form and initiate the required notifications.

ALL OPERATOR ACTIONS ARE TO BE PERFORMED.

THIS IS A DRILL.

INSTRUCTOR NOTE: This JPM is time critical. Start time is when the initiating cue is acknowledged by the examinee. Stop time is when the examinee returns the JPM paper work to you or verbally states the task is complete.

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-A.2-204-003, OFF-SITE PROTECTIVE ACTION RECOMMENDATIONS, Rev. 2 M/jlg Page 4 of 9 JPM PERFORMANCE INFORMATION Required Materials:

None General

References:

Simulator Task Standards:

A.2-204 Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Critical: N Locate General Emergency form packet. (May also reference procedure A.2-204 OFF-SITE PROTECTION ACTON RECOMMENDATIONS)

Standard:

Locates General Emergency packet.

Evaluator Cue:

When Candidate states the need for a General Emergency packet, hand them a packet, OR (if performed in the simulator, packets are located in the SM desk left drawer).

Performance:

SATISFACTORY UNSATISFACTORY Comments:

The items covered by JPM steps 2 and 3 may be done in any order as long as the standard for each step is met.

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-A.2-204-003, OFF-SITE PROTECTIVE ACTION RECOMMENDATIONS, Rev. 2 M/jlg Page 5 of 9 Performance Step: 2 Critical: Y Procedure A.2-204 (Step 6.1.1.A and 6.1.1.B) 6.1.1 Initiate Form 5790-102-02 (MONTICELLO EMERGENCY NOTIFICATION REPORT FORM)

A. Complete the Protective Action Recommendations section recommending sheltering or an evacuation of a 2 mile radius and 5 miles downwind and advise the remainder of the plume EPZ to go indoors to monitor EAS broadcasts. (See Figure 7.3.A for assistance.)

B. Determine which geopolitical subareas are affected by referring to the Sector-Subarea Conversion Table on Form 5790-102-02 Standard:

Complete Section 10 of Form 5790-102-02. The grading standard is as follows:

Item B is circled.

The word Evacuate is circled.

The blank in front of Sectors out to 2 miles contains the word ALL The blank in front of Sectors out to 5 miles contains the word downwind or E,F,G Only the following subareas are circled: 2, 5E and 5S.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

See attached form with data filled in.

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-A.2-204-003, OFF-SITE PROTECTIVE ACTION RECOMMENDATIONS, Rev. 2 M/jlg Page 6 of 9 Performance Step: 3 Critical: Y Procedure A.2-204 (Step 6.1.1.C)

Initiate Form 5790-102-02 C.

Ensure completion of the remaining sections of Form 5790-102-02 and submit the completed form to the ED for approval.

Standard:

The grading standard is as follows:

Section 1: item B should be circled (not critical).

Section 2: item B should be circled (not critical).

Section 4: item D should be circled.

Section 5: item A circled (not critical), date and time filled in and GL # 28.

Section 6: item A should be circled.

Section 7: item A should be circled (not critical).

Section 8: Wind direction is 285 degrees and affected downwind sectors E, F and G should be circled.

Section 9: Wind speed of 10 mph and stability class E circled.

Section 11: Examinee should indicate that they would use the label from the General emergency packet here (specifically the label for GL 28E).

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

See attached form with data filled in.

Performance Step: 4 Critical: N INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Standard:

Operator informs evaluator that the task is completed.

Evaluator Cue:

None Performance:

SATISFACTORY UNSATISFACTORY Comments:

DO NOT PROMPT.

Terminating Cues:

When told the actions are complete, acknowledge, and state the JPM is complete.

Stop Time:

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-A.2-204-003, OFF-SITE PROTECTIVE ACTION RECOMMENDATIONS, Rev. 2 M/jlg Page 7 of 9 SIMULATOR SET UP: (Modify table as necessary)

Simulator Setup Instructions:

None EVENT NUMBER EVENT FILE NAME EVENT WORD DESCRITPTION

1.
2.

SIMULATOR - MALFUNCTIONS:

MALF ID MALFUNCTION TITLE DELAY RAMP EVENT VALUE FINAL.

1.

None 00:00:00 00:00:00

2.

00:00:00 00:00:00

3.

00:00:00 00:00:00

4.

00:00:00 00:00:00 SIMULATOR - OVERRIDES:

OVERRIDE ID.

OVERRIDE DESCRIPTION DELAY RAMP EVENT VALUE FINAL

1.
2.
3.
4.

SIMULATOR - REMOTE FUNCTIONS:

REMOTE FUNC. No.

REMOTE FUNCTION TITLE DELAY RAMP EVENT VALUE FINAL

1.
2.
  • Set for current weather condition

QF-1030-11 Rev. 2 (FP-T-SAT-30)

M/jlg Page 8 of 9 TURNOVER SHEET INITIAL CONDITIONS:

THIS IS A DRILL.

The plant is shutdown in an Emergency Condition. An escalation to a General Emergency has just been declared (EAL Guideline 28, Section E.).

All release rates are normal.

Current Met Data is:

Wind direction (from) Ch. 5: 285 degrees Wind speed: Ch. 4 10 mph Temperature: 55°F Precipitation: none Ch. 11 - Diff. Temp: -0.79 INITIATING CUES (IF APPLICABLE):

THIS IS A DRILL.

Initiate and complete Form 5790-102-02 (MONTICELLO EMERGENCY NOTIFICATION REPORT FORM) and provide to the SEC.

The SEC will require 3 minutes to review the form and initiate the required notifications.

ALL OPERATOR ACTIONS ARE TO BE PERFORMED.

THIS IS A DRILL.

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-A.2-204-003, OFF-SITE PROTECTIVE ACTION RECOMMENDATIONS, Rev. 2 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: (Optional)

M/jlg Page 9 of 9