Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

May 20.2004 Time:

1430 Preparer:

Mike LeGreve U

I R

28 NOTE:

Refer to base procedure NP 10.3.6for safely assessment checklist KSF definitions.

NOTE:

Wheneverfuel has been removedfrom the reactor vessel and refueling cavity, all key safetyfunctions are GREEN excent spent fuel poolcooling.

KEY SAFETY FUNCTION CRITERIA: No/False =0, Yes/T rue

=

I through 4 REACTIVITY Subtotal Condition

1.

RCS Boron concentration =

3014 ppm a.)

For RSD, RCS boron >Refuleling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1 0-1 RED

2.

Number of boration paths (0-2) 2 2

ORANGE

3.

No fuel motion (0-1) 1 34

4.

SR instrumentation operable (0-1) 1 5

Subtotal =

5 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 1 2

ORANGE

3.

Number of trains RHR available (0-2) 2 3

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS Temperature - 82F; 45 days shutdown RCS Level = Rod Latch Height Subtotal 4

RCS Time to Boil 30 hrs (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3V and 345 kV levels)

(0-2) 2 4-5

2.

G-01 or G-02/A-05/B-03 available (0-1)

I G-03 or G-04/A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal 4

INVENTORY Subtotal Condition 0O.

RED

1.

Pressurizer level 220 percent w/head on (0-1) 0 2

ORANGE

2.

Refiieling Cavity filled (see definition)

(0-3) 2 3

a

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 1 Subtotal =

4 Wraton s roeod w d*Wd In mcmordnewi Fmr im Of WIarma,o All Pagel1of 9 Refercnces: NP 10.3.6 NP 102.1 PBF-1562 Revision 2 10130/02

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.1.D) (Containment Operable) {ITS TS 3.6.1) set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1)

I Subtotal 0

2-3 4-5-6 Co6dition RED ORANGE

<=5 (0-1) 1 Subtotal =

4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 Independent offste power source during periods of single X-03 orX-04 availability (*).

1.

"A" SFP cooling pump available with power available from:

G-02 or G-01 via 2B-32

.*)

an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via IB-42 an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-OS available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Subtotal 0-1 2

3 4-5 Condition RED ORANGE-YELLOW GREEN (0-1)

NA (0-1)

NA (0-1)

NA (0-1)

NA (0-1)

NA Subtotal = NA SFP Temperatures:

NW NA

'F SE

-NA OF SFP Average Temp NA SFP Time to Boil NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

1X03 returned to service. This restored two independent of site power sources (Power Availability: YELLOW

=> GREEN).

G01 returned to service and normal alignment.

PBF-1562 Revision 2 10/30102

References:

NP 10.3.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

1 DATE:

May 20,2004 TIME:

1430 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

GREEN GREEN GREEN GREEN GREEN NA PROTECTED EQUIPMENT:

COMMENTS:

RCS Time to Boil is 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Using NP 10.3.6 Time To Boil curves and curve for core reload complete.

Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency.

PBF-1562 Revisian 2 10/30/02

References:

NP 103.6 NP 10.2.1 Page 5 of 9