ML051950593

From kanterella
Jump to navigation Jump to search
Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051950593
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/18/2004
From: Scott S
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051950593 (3)


Text

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

AMay 18, 2004 Time:

0200 Preparer:

Sara Scott U

I R

28 NOTE:

Refer to base procedure NP 10.3.6for safety assessment checklist KSF definitions.

NOTE:

Wheneverfuel has been removed from the reactor vessel and refueling cavit, all key safetyfunctions are GREEN excent spentfuelpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration = 3020 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

-SR instrumentation operable Subtotal Condition RED ORANGE CupM.Q (0-1) 1 (0-2) 2 (0-1) 1 (0-1) 1 0-1 2

3-4 5

Subtotal =

5 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 1 2

ORANGE

3.

Number of trains RHR available (0-2) 2 3

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 CGREEN RCS Temperature = 79F; 44 days shutdown RCS Level = Rod Latch Height Subtotal =

4 RCS Time to Boil 30 hrs (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

independent at the 4160 V. 13.8 kV, 3

E o

and 345 kV levels)

(0-2) 1 4-5

2.

G-O0 or G-02/A-051B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal =

3 INVENTORY Subtotal Condition 0-1 RED

1.

Pressurizer level Ž20 percent w/head on (01) 0 2

ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 2 3

3.

RCS level above REDUCED INVENTORY (0-1) 41 4

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 1 Subtotal =

4 PBF-1 562 Revision 2 I~ndomabon M

~scordww de*eiW hinaccordance wd ijecMcikfmallaon 10130102 RWAlAAJU rev~ I of 9 Rcferences: NP 10.3.6 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.1.D) (Containment Operable) (ITS TS 3.6.1 ) set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and inteinals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1) 1 Subtotal 0

1 2-3 4-5-6 Condition RED ORANGE CM>I (0-1)

I Subtotal =

4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take credit for only one P-12 independent offsite power source during periods of single X-03 or X-04 availability (*).

1.

'A" SFP cooling pump available with power available from:

G-02 or G-01 via 2B-32

.(*) an independent off-site power source different than that for Train B below

2.

'B" SFP cooling pump available with power available from:

G-03 or G-04 via IB42

-(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Subtotal 0-1 2

3 4-5 Condition RED.

ORANGE YELLOW GREEN

-(0-1)

NA (0-1)

NA.

(0-1)

NA (0-1)

NA (0-1)

NA Subtotal =

NA SFP Temperatures:

NW NA OF SE

-NA OF SFPAverage Temp

. NA SFP Time to Boil

.NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

RCS Boron increased from 3002 to 3020 ppm

-.The RHR Reactivity flow path changed from train "B" to train "A".

PBF-1562 Revision 2 10/30/02

References:

NP 10.3.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

1 DATE:

May 18, 2004 TIME:

0200 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SEP COOLING:

GREEN GREEN YELLOW GREEN GREIN NA PROTECTED EOUIPMENT:

COMMENTS:

V RCS Time to Boil is 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Using NP 10.3.6 Time To Boil curves and curve for core reload complete.

Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF-1562 Revision 2 10/30/02

References:

NP 10.3.6 NP 10.2.1 Page 5 of 9