Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

May 16.2004 Time:

0200 Preparer:

T. R. Branam U

I R

28 NOTE:

Refer to base procedure NP 10.3.6 for safety assessment checklist KSF definitions.

NOTE:

Iflheneverfuel has been removedfrom the reactor vessel and refueling cavity, all key safetyfunctions are GREEN excet spentffuelpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration = 3007 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.
Number of boration paths
3.

No fuel motion

4.

SR instrumentation operable Subtotal Condition RED ORANGE 3Xf:aQ (0-1) 1 (0-2) 2 (0-1)

I (0-1)

I 0-1 2

3-4 5

Subtotal =

5 CORE COOLING Subtotal

.Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED'

2.

Refueling cavity filled (0-1) 1 2

ORANGE

3.

Number of trains RHR available (0-2) 2 3

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 eaiii RCS Temperature = 79'F; 43 days shutdown RCS Level = Rod Latch Hleight; Reactor is rerueled Subtotal 4

RCS Time to Boil 30 hrs (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

V and 345 kV levels)

(0-2) 2 4-5

2.

G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1)

I

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal =

4 INVENTORY Subtotal Condition 0-1 RED

1.

Pressurizer level 220 percent w/head on (0-1) 0 2

ORANGE

2.

Refuelinig Cavity filled (see definition)

(0-3) 2 3

A L

3.

RCS level above REDUCED INVENTORY (0-1)

I1 4

4.

Makeup from VCT/BLENDER and/or RWST available (0-2)

. 2 Subtotal 5

ktr If n fiS rcord wa dId hI agonii hla e Sreldom of lWormadon PBF-1562 Ad. ex Revision 2 10130/02 i;0

.a

-7 1Ige I of 9 Rcfrcrnces-NP 10.3.6 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.l.D) (Containment Operable) {ITS TS 3.6.1) set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut

( or 4) 0

( or 2) 2 (0-1)

I Subtotal 0

1 2-3 4-5-6 Condition RED (0-1) 0 Subtotal =

3 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 independent offsite powersource during periods of single X-03 orX-04 availability (*).

1.

"A" SFP cooling pump available with power available from:

G-02 or G-0I via 2B-32

-(*) an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via I1-42

_(t) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SFP Temperatures:

NW NA

`F SE

  • NA

`F SFP Average Temp NA OF SFP Time to Boil NA Subtotal 0-1 2

3. 5 Condition RED ORANGE

- YELLOW GREEN (0-1)

NA

- - (0-1)

NA (0-1)

NA (0-1)

NA

- (0-1),NA Subtotal =

NA

.1~

1 GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

RWST level is being lowered in preparation for cavity drain down (will remain >40% level).

Look-ahead: When Cavity is drained to below Rod Latch height, we will lose one point for Core Cooling (will go YELLOW) and two points for Inventory (will go YELLOW).

PBF-1 562 Revision2 10/30/02

References:

NP 10.3.6 NP ID.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

1 DATE:

May 16. 2004 TIME:

0200 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

GREEN GREEN GREEN GREEN CONTAINMENT:

SF? COOLING:

YELLOW NA PROTECTED EOUIPMENT:

RCS Time to Boil is 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Using NP 10.3.6 Time To Boil curves.

Fire Protection Condition IN: Credit is taken for fire rounds as fire prevention contingency PBF 1562 Revision 2 10/30/02 Recferences: NP 10.3.6 NP 10.2.1 Page 5 of 9