C J/

M h C/

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

May 15, 2004 Time:

0230 Preparer:

T. R. Branam U

I R

28 NOTE:

Refer to base procedure NP 10.3.6for safety assessment checklist KSFdefinittions.

NOTE:

W11h eneverfiuel has been removedfront the reactor vessel and refuiteling cavity, ail key safetjyfinctions are GREEN excent spetifuel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False =0, Yes/True = I through 4 REACTIVITY Subtotal Condition I.

RCS Boron concentration = 3006 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1)

I 0-1 RED

2.

Number of boration paths (0-2) 2 2

ORANGE

3.

No fuel motion (0-1) 1 3-4

4.

SR instrumentation operable (0-1) 1 5

Subtotal 5

CORE COOLING Subtotal Condition I.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1)

I 2

ORANGE

3.

Number of trains RHR available (0-2) 2

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 tGEENj RCS Temperature = 827F; 42 days shutdown RCS Level = Rod Latch Height; Reactor is refueled Subtotal =

'RCS Time to Boil 30 hrs (Applicable at Cold or Refueling Shutdowi n)

POWER AVAILABILITY Subtotal

-Condition I.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 1 3.8 kV, 3

and 345 kV levels)

(0-2) 2 4-5 LGREEr

2.

G-0I or G-021A-05/B-03 available (0-I)

I G-03 or G-04/A-06/B-04 available (0-I)

I

3.

G-05 available, Reactor Cavity filled to 2 23 fl above the top of the reactor vessel flange, upper internals removed and RCS time to boil a 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal 4

INVENTORY Subtotal

'Condition 0-1 RED I.

Pressurizer level Ž2-0 percent W/head on (0-l) 0 2

ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 2 3

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal S

- ;,.a l'BF-562 n

a oxhlWm ti ~edmof Informabon Rcvision 2 101/30/02k exPc,,

I of 9 nfickrences: NPl 101t, Nil 102.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT I.

Containment integrity (TS 15. I.D) (Containment Operable) {ITSTS3.6.l} set

2.

Containment Closure CL-IE maintained aand closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4)

.0 (O or 2) 2 (0-I)

I Subtotal 0

2-3 4-5-6 Condition RED 51 L&%i (0-1) 0 Subtotal 3

SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE Take creditfor only oileP-12 independent offslrepowersource duringperlods of singleX-03 orX-04 availability (*)

Subtotal Condition

  • 1.

"A" SFP cooling pump-available

.0-1 RED with power available from:

2 ORANGE G-02orG-0I via 2B-32 (0-1)

NA

.3 YELLOW

-(*) an independent off-site power 4-5 GREEN source different than that for

'Train B belowv

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 vial B-42

-(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil a 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1)

NA (0-1)

NA ji

1!-~l (0-1)

NA (0-I)

NA SFP Temperatures:

NW NA OF SE NA 0F SFP Average Temp NA OF

. SFP Time to Boil NA Subtotal -

NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

RWST level is being lowered in preparation for cavity d rain down (will remain >.40%/o level).

Look-ahead: When Cavity is drained to below Rod Latch height, we will lose one point for Core Cooling (will go YELLOW) and two points for Incnto-y (will go YELLOW).

PBF-I 562 Revision 2 10130A02 Page 2 of 9 Rerfcrnces: NP 10.3.6 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

1 DATE:

May 15, 2004 TIME:

0230 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

GREEN GREEN GREEN GREEN YELLOW NA.

PROTECTED EOUIPMENT:

RCS Time to Boil is 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Using NP 10.3.6 Time To Boil curves.