C M J/ h C/

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: May 15, 2004 Time: 0230 Preparer: T. R. Branam U I R 28 NOTE: Refer to baseprocedureNP 10.3.6for safety assessment checklist KSFdefinittions.

NOTE: W11h eneverfiuel has been removedfront the reactorvessel and refuiteling cavity, ail key safetjyfinctions are GREEN excent spetifuel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False =0, Yes/True = I through 4 REACTIVITY Subtotal Condition I. RCS Boron concentration = 3006 ppm a.) For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.) For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) I 0-1 RED

2. Number of boration paths (0-2) 2 2 ORANGE
3. No fuel motion (0-1) 1 3-4
4. SR instrumentation operable (0-1) 1 5 Subtotal 5 CORE COOLING Subtotal Condition I. Number of SG available for DHR (0-2) 0 0-1 RED
2. Refueling cavity filled (0-1) I 2 ORANGE
3. Number of trains RHR available (0-2) 2  ;
4. RCS level above REDUCED INVENTORY (0-1) 1 4-5 tGEENj RCS Temperature = 827F; 42 days shutdown RCS Level = Rod Latch Height; Reactor is refueled Subtotal =

'RCS Time to Boil 30 hrs (Applicable at Cold or Refueling Shutdowi n)

POWER AVAILABILITY Subtotal -Condition I. Independent off-site power sources I RED available to A-05 and A-06 (totally . 2 ORANGE independent at the 4160 V, 13.8 kV, 3 and 345 kV levels) (0-2) 2 4-5 LGREEr

2. G-0I or G-021A-05/B-03 available (0-I) I G-03 or G-04/A-06/B-04 available . (0-I) I
3. G-05 available, Reactor Cavity filled to 2 23 fl above the top of the reactor vessel flange, upper internals removed and RCS time to boil a 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 0 Subtotal 4 INVENTORY Subtotal 'Condition 0-1 RED I. Pressurizer level Ž2-0 percent W/head on (0-l) 0 2 ORANGE
2. Refueling Cavity filled (see definition) - - (0-3) 2 3
3. RCS level above REDUCED INVENTORY (0-1) 1 4
4. Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal
  • , , . S . - ; , .a .

l'BF-562 an oxhlWm ti ~edmof Informabon nfickrences: NPl 101t, Rcvision 2 101/30/02k exPc,, I of 9 Nil 102.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT Subtotal Condition I. Containment integrity (TS 15. I.D) (Containment 0 RED Operable) {ITSTS3.6.l} set (Oor 4) .0 51 L&%i

2. Containment Closure CL-IE maintained 2-3 aand closure < time to boil (Oor 2) 2 4-5-6
3. No fuel motion (0-I) I
4. DHR Capability:

- cavity flooded and internals out OR

- at least one SG available OR

- one fan cooler with Equip hatch installed and personnel hatches capable of being shut (0-1) 0 Subtotal 3 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE Take creditfor only oileP-12 independent offslrepowersourceduringperlodsofsingleX-03 orX-04 availability (*)

Subtotal Condition

  • 1. "A" SFP cooling pump-available .0-1 RED with power available from: 2 ORANGE

- G-02orG-0I via 2B-32 (0-1) NA .3 YELLOW

-(*) an independent off-site power 4-5 GREEN source different than that for

'Train B belowv (0-1) NA

2. "B" SFP cooling pump available with power available from:

- G-03 or G-04 vial B-42 (0-1) NA ji

-(*) an independent off-site power :1!

source different than that for -~l Train A above . (0-1) NA

3. Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil a 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-I) NA SFP Temperatures: Subtotal - NA NW NA OF SE NA 0F SFP Average Temp NA OF

. SFP Time to Boil NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

RWST level is being lowered in preparation for cavity drain down (will remain >.40%/o level).

Look-ahead: When Cavity is drained to below Rod Latch height, we will lose one point for Core Cooling (will go YELLOW) and two points for Incnto-y (will go YELLOW).

PBF-I 562 Rerfcrnces: NP 10.3.6 Revision 2 10130A02 Page 2 of 9 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: 1 DATE: May 15, 2004 TIME: 0230 KEY SAFETY FUNCTIONS:

REACTIVITY: GREEN CORE COOLING: GREEN POWER AVAILABLE: GREEN INVENTORY: GREEN CONTAINMENT: YELLOW SFP COOLING: NA .

PROTECTED EOUIPMENT:

RCS Time to Boil is 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Using NP 10.3.6 Time To Boil curves.

Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF-1562 Rcrcrences: NP 10.3.6 Revision 2 10/30/02 Page 5 of 9 NP 10.2.1