Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051950344
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/12/2004
From: Leiker J
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051950344 (3)


Text

i I

AJ RJ 0 Point Beach Nuclcar Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

May 12. 2004 Time:

1400 Preparer:

Jon Leiker

(::.U I

R 28 NOTE:

Refer to base procedure NP 10.3.6for safety assessment checklist AKSF definitions.

NOTE:

-Ifien ever fuel has been removedfront the reactor vessel and refueling cavitl, all key safety functions are GREEN except spent fuel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = 1 through 4 REACTIVITY

1.

RCS Boron concentration = 3000 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Subtotal Condition RED ORANGE

-y.jWd=

(0-1)

I (0-2) 2 (0-1) 1 (0-1) 1 0-1 2

04 CD Subtotal =

5 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 1 2

ORANGE

3.

Number of trains RHR available (0-2) 2 XELL

_X

4.

RCS level above REDUCED INVENTORY (0-1) 1 5GREEN RCS Temperature =777F; 39 days shutdown; RCS Level = Rod Latch Height; Reactor Is refueled Subtotal =

4 RCS Time to Boil 30 hrs (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition I.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

i and 345 kV levels)

(0-2) 2 (5

d m

2.

G-01 or G-021A-051B-03 available (0-1) 1 G-03 or G-04/A-061B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to Ž 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal =

4 INVENTORY Subtotal Condition 0-1 RED

1.

Pressurizer level 220 percent w/head on (0-1) 0 2

ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 2 3

T V

3.

RCS level above REDUCED INVENTORY (0-1) 1 (I)

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 1 Subtotal =

4 PBF-1562 Revision 2 10/30/02 In womfcwuie t, Freedom of Informaton A ex L

Page 1 of 9

References:

NP 10.3.6 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.1.D) (Containment Operable) {ITS TS 3.6.11 )set

2.

Containment Closure CL-lE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1) 1 Subtotal 0

2d) 4-5-6 Condition RED (0-1) 0 Subtotal =

3 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take credit for only one P-12 independent offsite power source during periods of single X-03 or X-04 availability (*).

"A" SFP cooling pump available with power available from:

G-02 or G-01 via 2B-32

, (*) an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via IB42

-(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Subtotal 0-1 2

3 4-5 Condition RED ORANGE YELLOW GREEN (0-1)

NA (0-1)

NA (0-1)

NA (0-1)

NA (0-1)

NA SFP Temperatures:

NW NA OF SE NA OF SFP Average Temp NA SFP Time to Boil NA Subtotal =

NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

Refueling cavity at Rod Latch Height. Rod Latching is complete.

Look-ahead: When Cavity is drained to below Rod Latch height, we will lose one point for Core Cooling (go YELLOW) and two points for Inventory (if CVCS is not yet back, I recommend using the RNYST4RHR flowpath for Inventory instead of Reactivity to keep Inventory YELLOW and turn Reactivity YELLOW).

PBF-1562 Revision 2 10/30102

References:

NP 10.3.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

1 DATE:

May 12, 2004 TIME:

1400 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE. COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

GREEN GREEN GREEN GREEN YELLOW NA*

PROTECTED EOUIPMENT:

v-B RCS Time to Boil is 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Using NP 10.3.6 Time To Boil curves.

Fire Protection Condition III: Credit is taken for fire rounds as fire prevention contingency 9+*

PBF-1562 Revision 2 10130/02

References:

NP 10.3.6 NP 10.2.1 Page 5 of 9