Text

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: OVERTIME RESTRICTIONS JPM NUMBER: JPM-4 AWI-08.10.01-001 REV. 0 RELATED PRA None INFORMATION:

TASK NUMBER(S) / CR206.102 TASK TITLE(S):

K/A NUMBERS: Generic 2.1.1 Rating: 3.8/3.7 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other: X Lab:

Time for Completion: 10 Minutes Time Critical: NO Alternate Path / Faulted: NO TASK APPLICABILITY: SRO: SRO/RO: SRO/RO/NLO: X Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File M/jlg Page 1 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.10.01-001, OVERTIME RESTRICTIONS , Rev. 0 JPM Number: JPM-4 AWI-08.10.01-001 JPM

Title:

OVERTIME RESTRICTIONS Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

M/jlg Page 2 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.10.01-001, OVERTIME RESTRICTIONS , Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

SIMULATOR SETUP:

NONE INITIAL CONDITIONS:

STATE THE FOLLOWING:

THE TASK CONDITIONS ARE AS FOLLOWS:

  • YOU ARE A LICENSED OPERATOR
  • THE REACTOR IS AT RATED CONDITIONS
  • NO OUTAGES OR POWER REDUCTIONS ARE SCHEDULED INITIATING CUES (IF APPLICABLE):

[STATE OPERATORS NAME] REVIEW YOUR PROPOSED WORK SCHEDULE PER OW1-01.01, OPERATIONS GROUP ORGANIZATION AND RESPONSIBILITY ASSIGNMENTS, INCLUDING SCHEDULED OVERTIME, FOR THE UPCOMING ROTATION TO ENSURE COMPLIANCE.

M/jlg Page 3 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.10.01-001, OVERTIME RESTRICTIONS , Rev. 0 JPM PERFORMANCE INFORMATION Required Materials: PREPARED NON-OUTAGE ROTATING SCHEDULE General

References:

OWI-01.01, 4 AWI-08.10.01 Task Standards: REVIEW WORK SCHEDULE FOR COMPLIANCE Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 LOCATES PROCEDURE(S) OWI-01.01 (OPERATIONS GROUP Critical: N ORGANIZATION AND RESPONSIBILITY ASSIGNMENTS) AND 4 AWI-08.10.01 (OVERTIME RESTRICTIONS AND FITNESS FOR DUTY REQUIREMENTS).

Standard: LOCATES PROCEDURE(S)

NOTE: 4 AWI-08.10.01 MAY NOT BE OBTAINED UNTIL STEP 2.

Evaluator Note: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 4 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.10.01-001, OVERTIME RESTRICTIONS , Rev. 0 Performance Step: 2 OVERTIME WORK RESTRICTIONS AS ESTABLISHED IN 4 AWI-08.10.01 Critical: N (OVERTIME RESTRICTIONS AND FITNESS FOR DUTY REQUIREMENTS)

SHALL BE ADHERED TO IN ESTABLISHING THE SHIFT SCHEDULE.

Standard: LOCATES PROCEDURE 4 AWI-08.10.01 Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 WORK SCHEDULES SHALL BE ESTABLISHED SUCH THAT USE OF Critical: N OVERTIME IS AVOIDED TO THE EXTENT PRACTICAL. THE OBJECTIVE SHALL BE TO HAVE SITE PERSONNEL WORK A NOMINAL 40 HOUR WEEK WHILE THE SITE IS IN NORMAL OPERATION. WHEN CIRCUMSTANCES WARRANT OVERTIME WORK, THE REQUIREMENTS OF THIS INSTRUCTION SHALL BE ADHERED TO.

Standard: REVIEWS PROCEDURE STEP Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 EXCLUDING SHIFT TURNOVER TIME, SITE PERSONNEL SHALL NOT WORK Critical: N MORE THAN:

A. 16 HOURS STRAIGHT OPERATOR REVIEWS PROPOSED WORK SCHEDULE AND INFORMS SUPERVISION OF ANY ERRORS Standard: DETERMINES THAT THIS REQUIREMENT IS MET.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 5 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.10.01-001, OVERTIME RESTRICTIONS , Rev. 0 Performance Step: 4 EXCLUDING SHIFT TURNOVER TIME, SITE PERSONNEL SHALL NOT WORK Critical: Y MORE THAN:

B. 16 HOURS IN ANY 24 HOUR PERIOD OPERATOR REVIEWS PROPOSED WORK SCHEDULE Standard: DETERMINES THAT THIS REQUIREMENT WILL BE EXCEEDED ON THE LAST SATURDAY.

NOTE: NOTIFICATION OF ERROR MAY OCCUR AT THE CONCLUSION OF THE REVIEW.

Evaluator Cue: IF NOTIFIED OF ERROR, ACKNOWLEDGE AS SUPERVISION Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 EXCLUDING SHIFT TURNOVER TIME, SITE PERSONNEL SHALL NOT WORK Critical: N MORE THAN:

C. 24 HOURS IN ANY 48 HOUR PERIOD OPERATOR REVIEWS PROPOSED WORK SCHEDULE Standard: DETERMINES THAT THIS REQUIREMENT IS MET.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 6 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.10.01-001, OVERTIME RESTRICTIONS , Rev. 0 Performance Step: 6 EXCLUDING SHIFT TURNOVER TIME, SITE PERSONNEL SHALL NOT WORK Critical: N MORE THAN:

D. 72 HOURS IN ANY 7 DAY PERIOD OPERATOR REVIEWS PROPOSED WORK SCHEDULE Standard: DETERMINES THAT THIS REQUIREMENT IS MET.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 EXCLUDING SHIFT TURNOVER TIME, SITE PERSONNEL SHALL NOT WORK Critical: N MORE THAN:

E. 15 CONSECUTIVE DAYS WITHOUT 2 CONSECUTIVE DAYS OFF.

OPERATOR REVIEWS PROPOSED WORK SCHEDULE Standard: DETERMINES THAT THIS REQUIREMENT WILL BE MET Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 7 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.10.01-001, OVERTIME RESTRICTIONS , Rev. 0 Performance Step: 8 THE FOLLOWING INTERPRETATION APPLIES TO THE PROVISIONS OF Critical: N 4.2.2:

A. ONE DAY OFF AFTER WORKING 14 CONSECUTIVE DAYS DOES NOT VIOLATE THE OVERTIME WORK RESTRICTIONS. THE FIRST WORK DAY AFTER THE DAY OFF WILL START THE COUNT FOR APPLYING THE NEXT 15 CONSECUTIVE DAY PROVISION.

OPERATOR REVIEWS PROPOSED WORK SCHEDULE Standard: DETERMINES THAT THIS REQUIREMENT WILL BE MET Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 A BREAK OF AT LEAST EIGHT HOURS, INCLUDING SHIFT TURNOVER TIME, Critical: Y SHALL BE ALLOWED BETWEEN WORK PERIODS. THIS ALLOWS THE SHIFT TURNOVER TIME (TYPICALLY 15 MINUTES) TO BE INCLUDED IN THE EIGHT HOUR BREAK.

OPERATOR REVIEWS PROPOSED WORK SCHEDULE Standard: DETERMINES THAT THIS REQUIREMENT WILL BE EXCEEDED ON THE LAST FRIDAY.

NOTE: NOTIFICATION OF ERROR MAY OCCUR AT THE CONCLUSION OF THE REVIEW.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 8 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.10.01-001, OVERTIME RESTRICTIONS , Rev. 0 Performance Step: 10 INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Critical: N Standard: OPERATOR INFORMS EVALUATOR THAT THE TASK IS COMPLETED.

Evaluator Cue: ACKNOWLEDGE REPORT Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: WHEN OPERATOR INFORMS THE EVALUATOR THAT THE TASK IS COMPLETE, STATE THE JPM IS COMPLETE.

Stop Time:

M/jlg Page 9 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC , Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: (Optional)

M/jlg Page 10 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: INDEPENDENT VERIFICATION OF RCIC JPM NUMBER: JPM-4 AWI-04.04.02-003 REV. 0 RELATED PRA None INFORMATION:

TASK NUMBER(S) / CR206.102 TASK TITLE(S):

K/A NUMBERS: Generic 2.1.29 Rating: 3.4/3.3 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: NO Alternate Path / Faulted: NO TASK APPLICABILITY: SRO: SRO/RO: X SRO/RO/NLO:

Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File M/jlg Page 1 of 13

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC , Rev. 0 JPM Number: JPM-4 AWI-04.04.02-003 JPM

Title:

Independent Verification of RCIC Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

M/jlg Page 2 of 13

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC , Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

SIMULATOR SETUP:

  • FILL OUT PROCEDURE 0255-08-IA-1 AS FOLLOWS:

CONTROL ROOM SUPERVISOR APPROVAL ON COVERSHEET.

REASON TO PERFORM - QUARTERLY. (IN CONJUNCTION WITH NO OTHER TESTS.)

FILL IN NUMBERS AND INITIAL STEPS 1 THROUGH 75.

INITIAL CONDITIONS:

STATE THE FOLLOWING:

THE TITLE OF THIS JPM IS INDEPENDENT VERIFICATION OF RCIC THE TASK CONDITIONS ARE AS FOLLOWS:

  • THE ROUTINE QUARTERLY RCIC PUMP AND VALVE SURVEILLANCE HAS JUST BEEN COMPLETED THROUGH STEP 75.
  • INDEPENDENT VERIFICATION IS NOW REQUIRED.
  • YOU ARE AN EXTRA LICENSED OPERATOR AND DID NOT PARTICIPATE IN THE TEST UP TO THIS POINT.

INITIATING CUES (IF APPLICABLE):

[STATE OPERATORS NAME] THE CONTROL ROOM SUPERVISOR DIRECTS YOU TO PERFORM THE REQUIRED INDEPENDENT VERIFICATION, FOR THE COMPONENTS IN THE CONTROL ROOM, TO ASSURE THE COMPONENTS ARE IN AN ECCS LINE-UP. PERFORM STEP 76 OF TEST 0255-08-IA-1 (RCIC QUARTERLY PUMP & VALVE TEST).

M/jlg Page 3 of 13

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC , Rev. 0 JPM PERFORMANCE INFORMATION Required Materials: TEST 0255-08-IA-1 General

References:

4 AWI-04.04.02 Task Standards: PLACE THE RCIC SYSTEM IN STANDBY READINESS Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step:

Critical: N Standard:

Evaluator Note: THE CANDIDATE SHALL ENSURE VERIFICATION IS PERFORMED SEPARATELY FROM THE ACTIONS OF THE INDIVIDUAL POSITIONING THE COMPONENTS.

THE CANDIDATE SHALL NOT REPOSITION ANY COMPONENT ON THE CHECKLIST (4 AWI-04.04.02, SECTION 4.3.6.C).

VIOLATION OF EITHER OF THE ABOVE CONDITIONS SHOULD CONSTITUTE FAILURE OF THIS JPM.

Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 4 of 13

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC , Rev. 0 Performance Step: 1 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

FIC-13-91 SET TO CONTROL FLOW AT 80% (400 GPM).

Standard: OPERATOR OBSERVED FIC-13-91 SET TO CONTROL FLOW AT 80% (400 GPM).

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

VERIFY FIC-13-91 IN AUTO POSITION.

Standard: OPERATOR OBSERVED VERIFY FIC-13-91 IN AUTO POSITION.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

HO-8 TURBINE CONTROL VALVE OPEN; RED LIGHT ON.

Standard: OPERATOR OBSERVED HO-8 TURBINE CONTROL VALVE OPEN; RED LIGHT ON.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 5 of 13

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC , Rev. 0 Performance Step: 4 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

MO-2080 OPEN; RED LIGHT ON; GREEN LIGHT OFF.

Standard: OPERATOR OBSERVED MO-2080 OPEN; RED LIGHT ON; GREEN LIGHT OFF.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

MO-2078 CONTROL SWITCH, 13A-S2, IN AUTO POSITION; GREEN LIGHT ON.

Standard: OPERATOR OBSERVED MO-2078 CONTROL SWITCH, 13A-S2, IN AUTO POSITION; GREEN LIGHT ON.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

MO-2076 CONTROL SWITCH, 13A-S3, IN AUTO POSITION; RED LIGHT ON.

Standard: OPERATOR OBSERVED MO-2076 CONTROL SWITCH, 13A-S3, IN AUTO POSITION; RED LIGHT ON.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 6 of 13

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC , Rev. 0 Performance Step: 7 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

MO-2075 CONTROL SWITCH, 13A-S1, IN NEUTRAL POSITION, RED LIGHT ON.

Standard: OPERATOR OBSERVED MO-2075 CONTROL SWITCH, 13A-S1, IN NEUTRAL POSITION, RED LIGHT ON.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

MO-2102 CONTROL SWITCH, 13A-S4, IN AUTO POSITION, RED LIGHT ON.

Standard: OPERATOR OBSERVED MO-2102 CONTROL SWITCH, 13A-S4, IN AUTO POSITION, RED LIGHT ON.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

MO-2101 CONTROL SWITCH, 13A-S9, IN AUTO POSITION, GREEN LIGHT ON.

Standard: OPERATOR OBSERVED MO-2101 CONTROL SWITCH, 13A-S9, IN AUTO POSITION, GREEN LIGHT ON.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 7 of 13

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC , Rev. 0 Performance Step: 10 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

MO-2100 CONTROL SWITCH, 13A-S10, IN AUTO POSITION, GREEN LIGHT ON.

Standard: OPERATOR OBSERVED MO-2100 CONTROL SWITCH, 13A-S10, IN AUTO POSITION, GREEN LIGHT ON.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

AO-13-22 ACTUATOR-BLUE-NEUTRAL LIGHT ON; GREEN DISC POSITION LIGHT ON.

Standard: OPERATOR OBSERVED AO-13-22 ACTUATOR-BLUE-NEUTRAL LIGHT ON; GREEN DISC POSITION LIGHT ON.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

MO-2107 CONTROL SWITCH, 13A-S5, IN AUTO POSITION, GREEN LIGHT ON.

Standard: OPERATOR OBSERVED MO-2107 CONTROL SWITCH, 13A-S5, IN AUTO POSITION, GREEN LIGHT ON.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 8 of 13

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC , Rev. 0 Performance Step: 13 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

MO-2106 CONTROL SWITCH, 13A-S6, IN AUTO POSITION, GREEN LIGHT ON.

Standard: OPERATOR OBSERVED MO-2106 CONTROL SWITCH, 13A-S6, IN AUTO POSITION, GREEN LIGHT ON.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 14 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

MO-2110 CONTROL SWITCH, 13A-S7, IN AUTO POSITION, GREEN LIGHT ON.

Standard: OPERATOR OBSERVED MO-2110 CONTROL SWITCH, 13A-S7, IN AUTO POSITION, GREEN LIGHT ON.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 15 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

CV-2082A AND CV-2082B CONTROL SWITCH, 13A-S11, IN OPEN POSITION; RED LIGHTS ON FOR BOTH VALVES.

Standard: OPERATOR OBSERVED CV-2082A AND CV-2082B CONTROL SWITCH, 13A-S11, IN OPEN POSITION; RED LIGHTS ON FOR BOTH VALVES.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 9 of 13

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC , Rev. 0 Performance Step: 16 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

MO-2104 CONTROL SWITCH, 13A-S21, IN AUTO POSITION, GREEN LIGHT ON.

Standard: OPERATOR OBSERVED MO-2104 CONTROL SWITCH, 13A-S21, IN AUTO POSITION, GREEN LIGHT ON.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 17 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

CV-2079, RCIC STEAM LINE DRAIN TRAP ST-2081 BYPASS, CONTROL SWITCH, 13A-S13, IN CLOSE POSITION, GREEN LIGHT ON.

Standard: OPERATOR OBSERVED CV-2079, RCIC STEAM LINE DRAIN TRAP ST-2081 BYPASS, CONTROL SWITCH, 13A-S13, IN CLOSE POSITION, GREEN LIGHT ON.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 18 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

MO-3502 CONTROL SWITCH, HS-3502, IN AUTO POSITION, GREEN LIGHT ON.

Standard: OPERATOR OBSERVED MO-3502 CONTROL SWITCH, HS-3502, IN AUTO POSITION, GREEN LIGHT ON.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 10 of 13

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC , Rev. 0 Performance Step: 19 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

CV-2848 AND CV-2849 CONTROL SWITCH, 13A-S12, IN CLOSE POSITION, GREEN LIGHTS ON FOR BOTH VALVES.

Standard: OPERATOR OBSERVED CV2848 AND CV-2849 CONTROL SWITCH, 13A-S12, IN CLOSE POSITION, GREEN LIGHTS ON FOR BOTH VALVES.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 20 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

BAROMETRIC CONDENSER CONDENSATE PUMP CONTROL SWITCH, 13A-S14, IN AUTO POSITION, GREEN LIGHT ON.

Standard: OPERATOR OBSERVED BAROMETRIC CONDENSER CONDENSATE PUMP CONTROL SWITCH, 13A-S14, IN AUTO POSITION, GREEN LIGHT ON.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 21 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

BAROMETRIC CONDENSER VACUUM PUMP CONTROL SWITCH, 13A-S15, IN AUTO POSITION, GREEN LIGHT ON.

Standard: OPERATOR OBSERVED BAROMETRIC CONDENSER VACUUM PUMP CONTROL SWITCH, 13A-S15, IN AUTO POSITION, GREEN LIGHT ON.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 11 of 13

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC , Rev. 0 Performance Step: 22 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

MO-2096 CONTROL SWITCH, 13A-S8, IN AUTO POSITION, GREEN LIGHT ON.

Standard: OPERATOR OBSERVED MO-2096 CONTROL SWITCH, 13A-S8, IN AUTO POSITION, GREEN LIGHT ON.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 23 PERFORM INDEPENDENT VERIFICATION THAT THE FOLLOWING RCIC Critical: Y SYSTEM COMPONENTS ARE IN THE NORMAL STANDBY CONDITION:

MECHANICAL OVERSPEED TRIP LIGHTS ARE OFF.

Standard: OPERATOR OBSERVED MECHANICAL OVERSPEED TRIP LIGHTS ARE OFF.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 24 INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Critical: N Standard: OPERATOR INFORMS EVALUATOR THAT THE TASK IS COMPLETED.

Evaluator Cue: ACKNOWLEDGE REPORT Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: WHEN OPERATOR INFORMS THE EVALUATOR THAT THE TASK IS COMPLETE, STATE THE JPM IS COMPLETE.

Stop Time:

M/jlg Page 12 of 13

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.02-003, INDEPENDENT VERIFICATION OF RCIC , Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: (Optional)

M/jlg Page 13 of 13

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: ROD BLOCK MONITOR FUNCTIONAL TEST JPM NUMBER: JPM-0045-001 REV. 0 RELATED PRA None INFORMATION:

TASK NUMBER(S) / CR215.107 TASK TITLE(S): Perform RBM Functional Test K/A NUMBERS: 2.2.12 Rating: SRO/RO: 3.0/3.4 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 20 Minutes Time Critical: NO Alternate Path / Faulted: NO TASK APPLICABILITY: SRO: SRO/RO: X SRO/RO/NLO:

Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date M/jlg Page 1 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-0045-001, ROD BLOCK MONITOR FUNCTIONAL TEST, Rev. 0 JPM Number: JPM-0045-001 JPM

Title:

RBM Functional Test Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

M/jlg Page 2 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-0045-001, ROD BLOCK MONITOR FUNCTIONAL TEST, Rev. 0 JPM BRIEFING/TURNOVER (See MTCP-03.32, Figure 6.2)

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

STATE THE FOLLOWING:

THE TITLE OF THIS JPM IS ROD BLOCK MONITOR FUNCTIONAL TEST THE TASK CONDITIONS ARE AS FOLLOWS:

  • THE PLANT IS AT 100% POWER.
  • NO OTHER TESTING IS IN PROGRESS.
  • TEST 0045 IS BEING PERFORMED TO SATISFY QUARTERLY REQUIREMENT PER TECH SPECS.
  • THE FOLLOWING LPRMS ARE BYPASSED DUE TO FAULTY DETECTORS:
  • 28-29A
  • 44-21C
  • 20-13D
  • 28-37D
  • NUCLEAR ENGINEERING HAS SUBMITTED THE FOLLOWING LIST OF CONTROL RODS FOR USED WITH THIS TEST:
  • YOU ARE THE OPERATOR AT THE CONTROLS INITIATING CUES (IF APPLICABLE):

[STATE OPERATORS NAME] DIRECTS YOU TO COMPLETE PREREQUISITES #2 OF TEST PROCEDURE 0045.

M/jlg Page 3 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-0045-001, ROD BLOCK MONITOR FUNCTIONAL TEST, Rev. 0 JPM PERFORMANCE INFORMATION Required Materials: INITIALIZE THE SIMULATOR TO ANY IC WITH THE PLANT AT 100% POWER.

PROVIDE COPY OF TEST NO. 0045 TO OPERATOR.

General

References:

TEST NO. 0045 Task Standards: COMPLETE PREREQUISITES #2 Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 REVIEW ATTACHMENTS 1, 2 AND 3, AND CHOOSE CONTROL RODS FOR Critical: Y STEPS 192, 198, AND 204 FROM EACH ATTACHMENT. ENTER THE RODS BELOW: (N/A IF REASON FOR PERFORMING PROCEDURE IS NO. 4.)

NOTE: DO NOT SELECT A CONTROL ROD WITH A BYPASSED C LEVEL DETECTOR IN ANY OF THE SURROUNDING STRINGS.

OPERATOR DETERMINES ACCEPTABLE FOR RBM 7, TWO STRING ROD 18-11, REFER TO ATTACHMENT 1 OF PROCEDURE 0045 AND ENSURE THIS ROD MEETS THE STANDARD FOR PREREQUISITE # 2.

OPERATOR ENTERS SELECTED CONTROL ROD IN APPROPRIATE SPACE ON PAGE 4 OF PROCEDURE 0045.

Standard: DETERMINED ROD 18-11 ACCEPTABLE.

Evaluator Cue: NONE NOTE TO EVALUATOR: JPM STEPS 2-7 MAY BE DONE IN ANY ORDER, BUT ALL MUST BE DONE.

Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 4 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-0045-001, ROD BLOCK MONITOR FUNCTIONAL TEST, Rev. 0 Performance Step: 2 REVIEW ATTACHMENTS 1, 2 AND 3, AND CHOOSE CONTROL RODS FOR Critical: Y STEPS 192, 198, AND 204 FROM EACH ATTACHMENT. ENTER THE RODS BELOW: (N/A IF REASON FOR PERFORMING PROCEDURE IS NO. 4.)

NOTE: DO NOT SELECT A CONTROL ROD WITH A BYPASSED C LEVEL DETECTOR IN ANY OF THE SURROUNDING STRINGS.

OPERATOR DETERMINES ACCEPTABLE FOR RBM 8, TWO STRING ROD 46-47, REFER TO ATTACHMENT 1 OF PROCEDURE 0045 AND ENSURE THIS ROD MEETS THE STANDARD FOR PREREQUISITE # 2.

OPERATOR ENTERS SELECTED CONTROL ROD IN APPROPRIATE SPACE ON PAGE 4 OF PROCEDURE 0045.

Standard: DETERMINED ROD SUGGESTED BY NUCLEAR ENGINEER TO BE UNACCEPTABLE AND PICKS ANY OF THE FOLLOWING CONTROL RODS:

  • 18-11
  • 10-19
  • 26-47 Evaluator Cue: WHEN CANDIDATE INDICATES THAT THIS ROD IS NOT ACCEPTABLE FOR USE THEN STATE THE FOLLOWING: THE SHIFT MANAGER DIRECTS YOU TO SELECT ANOTHER 2 STRING ROD FOR USE.

NOTE TO EVALUATOR: THIS ROD IS NOT ACCEPTABLE BECAUSE LPRM 44-21C IS BYPASSED. THE CANDIDATE MAY SELECT ANY OF THE FOLLOWING RODS:

18-11, 10-19, OR 26-47.

Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 5 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-0045-001, ROD BLOCK MONITOR FUNCTIONAL TEST, Rev. 0 Performance Step: 3 REVIEW ATTACHMENTS 1, 2 AND 3, AND CHOOSE CONTROL RODS FOR Critical: Y STEPS 192, 198, AND 204 FROM EACH ATTACHMENT. ENTER THE RODS BELOW: (N/A IF REASON OR PERFORMING PROCEDURE IS NO. 4.)

NOTE: DO NOT SELECT A CONTROL ROD WITH A BYPASSED C LEVEL DETECTOR IN ANY OF THE SURROUNDING STRINGS.

OPERATOR DETERMINES ACCEPTABLE FOR RBM 7, THREE STRING ROD 10-31, REFER TO ATTACHMENT 2 OF PROCEDURE 0045 AND ENSURE THIS ROD MEETS THE STANDARD FOR PREREQUISITE # 2.

OPERATOR ENTERS SELECTED CONTROL ROD IN APPROPRIATE SPACE ON PAGE 4 OF PROCEDURE 0045.

Standard: DETERMINED THAT CONTROL ROD WAS ACCEPTABLE.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 REVIEW ATTACHMENTS 1, 2 AND 3, AND CHOOSE CONTROL RODS FOR Critical: Y STEPS 192, 198, AND 204 FROM EACH ATTACHMENT. ENTER THE RODS BELOW: (N/A IF REASON FOR PERFORMING PROCEDURE IS NO. 4.)

NOTE: DO NOT SELECT A CONTROL ROD WITH A BYPASSED C LEVEL DETECTOR IN ANY OF THE SURROUNDING STRINGS.

OPERATOR DETERMINES ACCEPTABLE FOR RBM 8, THREE STRING ROD 34-19, REFER TO ATTACHMENT 2 OF PROCEDURE 0045 AND ENSURE THIS ROD MEETS THE STANDARD FOR PREREQUISITE # 2.

OPERATOR ENTERS SELECTED CONTROL ROD IN APPROPRIATE SPACE ON PAGE 4 OF PROCEDURE 0045.

Standard: DETERMINED CONTROL ROD UNACCEPTABLE. SELECTED ANY OTHER 3 STRING ROD EXCEPT

  • 38-19
  • 42-19
  • 38-15 Evaluator Cue: WHEN CANDIDATE INDICATES THAT THIS ROD IS NOT ACCEPTABLE FOR USE THEN STATE THE FOLLOWING: THE SHIFT MANAGER DIRECTS YOU TO SELECT ANOTHER 3 STRING ROD FOR USE.

Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 6 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-0045-001, ROD BLOCK MONITOR FUNCTIONAL TEST, Rev. 0 Performance Step: 5 REVIEW ATTACHMENTS 1, 2 AND 3, AND CHOOSE CONTROL RODS FOR Critical: Y STEPS 192, 198, AND 204 FROM EACH ATTACHMENT. ENTER THE RODS BELOW: (N/A IF REASON FOR PERFORMING PROCEDURE IS NO. 4.)

NOTE: DO NOT SELECT A CONTROL ROD WITH A BYPASSED C LEVEL DETECTOR IN ANY OF THE SURROUNDING STRINGS.

OPERATOR DETERMINES ACCEPTABLE FOR RBM 7, FOUR STRING ROD 26-31, REFER TO ATTACHMENT 3 OF PROCEDURE 0045 AND ENSURE THIS ROD MEETS THE STANDARD FOR PREREQUISITE # 2.

OPERATOR ENTERS SELECTED CONTROL ROD IN APPROPRIATE SPACE ON PAGE 4 OF PROCEDURE 0045.

Standard: DETERMINED ROD WAS ACCEPTABLE.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 REVIEW ATTACHMENTS 1, 2 AND 3, AND CHOOSE CONTROL RODS FOR Critical: Y STEPS 192, 198, AND 204 FROM EACH ATTACHMENT. ENTER THE RODS BELOW: (N/A IF REASON OR PERFORMING PROCEDURE IS NO. 4.)

NOTE: DO NOT SELECT A CONTROL ROD WITH A BYPASSED C LEVEL DETECTOR IN ANY OF THE SURROUNDING STRINGS.

OPERATOR DETERMINES ACCEPTABLE FOR RBM 8, FOUR STRING ROD 34-43, REFER TO ATTACHMENT 3 OF PROCEDURE 0045 AND ENSURE THIS ROD MEETS THE STANDARD FOR PREREQUISITE # 2.

OPERATOR ENTERS SELECTED CONTROL ROD IN APPROPRIATE SPACE ON PAGE 4 OF PROCEDURE 0045 Standard: DETERMINED ROD WAS ACCEPTABLE.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 7 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-0045-001, ROD BLOCK MONITOR FUNCTIONAL TEST, Rev. 0 Performance Step: 7 REVIEW ATTACHMENTS 1, 2 AND 3, AND CHOOSE CONTROL RODS FOR Critical: Y STEPS 192, 198, AND 204 FROM EACH ATTACHMENT. ENTER THE RODS BELOW: (N/A IF REASON FOR PERFORMING PROCEDURE IS NO. 4.)

NOTE: DO NOT SELECT A CONTROL ROD WITH A BYPASSED C LEVEL DETECTOR IN ANY OF THE SURROUNDING STRINGS.

OPERATOR INITIALS SHIFT SUPERVISION APPROVAL LINE FOR THIS PREREQUISITE OR IF RO CANDIDATE INFORMS SHIFT SUPERVISION THAT THE PREREQUISITE IS COMPLETE..

Standard: DETERMINED PREREQUISITE COMPLETE.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Critical: N Standard: Operator informs evaluator that the task is completed.

Evaluator Cue: Acknowledge Report Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: WHEN REPORT IS MADE THAT TASK IS COMPLETE, STATE THAT THE JPM IS COMPLETE.

Stop Time:

M/jlg Page 8 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-0045-001, ROD BLOCK MONITOR FUNCTIONAL TEST, Rev. 0 SIMULATOR SET UP: (Modify table as necessary)

Simulator Setup Instructions:

  • Initialize the simulator to any IC with the plant at 100% power.

EVENT NUMBER EVENT FILE NAME EVENT WORD DESCRITPTION 1.

2.

SIMULATOR - MALFUNCTIONS:

MALF ID MALFUNCTION TITLE DELAY RAMP EVENT VALUE FINAL.

1. None 00:00:00 00:00:00
2. 00:00:00 00:00:00
3. 00:00:00 00:00:00
4. 00:00:00 00:00:00 SIMULATOR - OVERRIDES:

OVERRIDE ID. OVERRIDE DELAY RAMP EVENT VALUE FINAL DESCRIPTION

1. None 00:00:00 00:00:00 2.

3.

4.

SIMULATOR - REMOTE FUNCTIONS:

REMOTE REMOTE FUNCTION TITLE DELAY RAMP EVENT VALUE FINAL FUNC. No.

1.

2.

M/jlg Page 9 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-0045-001, ROD BLOCK MONITOR FUNCTIONAL TEST, Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: (Optional)

M/jlg Page 10 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: HIGH RADIATION AREA ENTRY JPM NUMBER: JPM-4 AWI-08.04.06-001 REV. 0 RELATED PRA None INFORMATION:

TASK NUMBER(S) / CR999.299 TASK TITLE(S): ADMINISTRATIVE PROCEDURES K/A NUMBERS: 2.3.10 Rating: SRO/RO: 3.3/2.9 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: X Perform:

EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other:

Lab: X Time for Completion: 15 Minutes Time Critical: NO Alternate Path / Faulted: NO TASK APPLICABILITY: SRO: SRO/RO: SRO/RO/NLO: X Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date M/jlg Page 1 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.04.06-001 HIGH RADIATION AREA ENTRY, Rev. 0 JPM Number: JPM-4 AWI-08.04.06-001 JPM

Title:

HIGH RADIATION AREA ENTRY Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

M/jlg Page 2 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.04.06-001 HIGH RADIATION AREA ENTRY, Rev. 0 JPM BRIEFING/TURNOVER (See MTCP-03.32, Figure 6.2)

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

THE TASK CONDITIONS ARE AS FOLLOWS:

  • THE PLANT IS AT 100% POWER.
  • AN ENTRY INTO RAD WASTE PUMP ROOM 985 LEVEL MUST BE PERFORMED TO INSPECT A POTENTIAL BLOCKAGE OF THE T-24 (WASTE COLLECTION TANK) DRAIN VALVE LOCATED AT THE SOUTH END OF THE TANK.
  • PROVIDE SURVEY MAP
  • PROVIDE RWP INITIATING CUES (IF APPLICABLE):

[STATE OPERATORS NAME] PERFORM THE SPECIFIC INSTRUCTIONS PER 4 AWI-08.04.06 FOR ENTRY INTO THE POSTED HIGH RADIATION AREA FOR THE INSPECTION.

M/jlg Page 3 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.04.06-001 HIGH RADIATION AREA ENTRY, Rev. 0 JPM PERFORMANCE INFORMATION Required Materials: SURVEY MAP AND RWP FOR HI RADIATION AREA TO BE ENTERED General

References:

4 AWI-08.04.06, AREA CONTROL Task Standards: PERFORM INDIVIDUAL EXPOSURE CONTROL DUTIES Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 PROVIDED A COPY OF 4 AWI-08.04.06 (AREA CONTROL) REVIEWS Critical: N PROCEDURE AND LOCATES SECTION 4.4.2 SPECIFIC INSTRUCTIONS FOR HIGH, LOCKED HIGH, AND VERY HIGH RADIATION AREAS Standard: LOCATES APPROPRIATE SECTION OF PROCEDURE Evaluator Cue: PROVIDE COPY OF PROCEDURE 4 AWI-08.04.06 (AREA CONTROL)

Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 4 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.04.06-001 HIGH RADIATION AREA ENTRY, Rev. 0 Performance Step: 2 SPECIFIC INSTRUCTIONS FOR HIGH, LOCK HIGH, AND VERY HIGH Critical: Y RADIATION ARES.

A. OBTAIN ANY REQUIRED SPECIAL APPROVALS AS FOLLOWS:

1. LOCKED HIGH RADIATION AREA:

NON-ROUTINE ENTRIES UNDER EXTENDED RWPS REQUIRE COMPLETION OF FORM 5677 (RWP REQUEST)

AND THE SIGNATURE OF YOUR SUPERVISOR (IF ON SITE),

THE SHIFT SUPERVISOR, OR THE RAD PROT COORD TO SHOW CONCURRENCE WITH THE NEED FOR THE ENTRY.

SUPERVISORS MAY APPROVE THEIR OWN ENTRIES.

2. VERY HIGH RADIATION AREA YOU SHALL OBTAIN WRITTEN APPROVAL FROM THE PLANT MANAGER, WHICH IS BASED ON A SOUND OPERATIONAL OR SAFETY REASON.

DETERMINES NEITHER OF THE ABOVE CONDITIONS APPLY AS THE ENTRY IS FOR A HIGH RADIATION AREA.

Standard: DETERMINES STEP IS NOT APPLICABLE Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 A RADIOLOGICAL BRIEFING FROM RADIATION PROTECTION IS REQUIRED Critical: N PRIOR TO ENTRY Standard: DETERMINES THAT A RADIOLOGICAL BRIEFING MUST BE PERFORMED Evaluator Cue: STATE THAT THE RADIOLOGICAL BRIEFING HAS BEEN PERFORMED Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 5 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.04.06-001 HIGH RADIATION AREA ENTRY, Rev. 0 Performance Step: 4 PREPARE TO PERFORM YOUR INDIVIDUAL EXPOSURE CONTROL DUTIES Critical: Y AS FOLLOWS:

1. YOU SHALL DETERMINE THE EXPECTED AREA DOSE RATES FOR ALL REGIONS OF THE AREA YOU WILL BE ENTERING BY REVIEWING AREA SURVEYS.

REVIEWS AREAS SURVEYS PROVIDED AND DETERMINES THE DOSE RATE FOR THE INSPECTION IS 400Mrem/hr.

Standard: DETERMINED DOES RATE WILL BE 400 Mrem/hr.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 PREPARE TO PERFORM YOUR INDIVIDUAL EXPOSURE CONTROL DUTIES Critical: Y AS FOLLOWS:

2. DETERMINE THE EXPECTED DURATION OF THE ENTRY AND THE EXPECTED DOSE NEEDED TO MAKE THE ENTRY.

OPERATOR DETERMINES EXPECTED DOSE USING DETERMINED DOSE RATE AND GIVEN DURATION OF ENTRY Standard: DETERMINED EXPECTED DOSE TO BE 100 Mrem/hr.

Evaluator Cue: STATE THE EXPECTED DURATION OF THE ENTRY IS 15 MINUTES Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 6 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.04.06-001 HIGH RADIATION AREA ENTRY, Rev. 0 Performance Step: 6 PREPARE TO PERFORM YOUR INDIVIDUAL EXPOSURE CONTROL DUTIES Critical: N AS FOLLOWS:

3. IF A DOSE RATE METER IS REQUIRED BY THE RWP, THEN OBTAIN A METER FROM MAIN ACCESS CONTROL.

OPERATOR DETERMINES NO METER IS REQUIRED FROM THE RWP Standard: DETERMINES NO METER IS REQUIRED Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 PREPARE TO PERFORM YOUR INDIVIDUAL EXPOSURE CONTROL DUTIES Critical: Y AS FOLLOWS:

4. DETERMINE THE ALLOWABLE ENTRY DOSE, EITHER FROM THE ELECTRONIC DOSIMETER LOG-IN PROCESS, FROM THE LOCAL CONTROL POINT, OR FROM YOUR DOSIMETER.

OPERATOR DETERMINES THE ALLOWABLE ENTRY DOSE FROM THE DOSIMETER AND NOTES IT TO BE 50 Mrem/hr FROM THE RWP.

Standard: DETERMINED ALLOWABLE ENTRY DOSE.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 7 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.04.06-001 HIGH RADIATION AREA ENTRY, Rev. 0 Performance Step: 8 PREPARE TO PERFORM YOUR INDIVIDUAL EXPOSURE CONTROL DUTIES Critical: Y AS FOLLOWS:

5. IF THE ALLOWABLE ENTRY DOSE IS LESS THAN THE EXPECTED ENTRY DOSE, THEN YOU SHALL REPORT TO THE RAD PROT COORD FOR RESOLUTION.

OPERATOR DETERMINES THE ALLOWABLE ENTRY DOSE IS LESS THAN THE EXPECTED ENTRY DOSE AND REPORTS TO THE RAD PROT COORD.

Standard: REPORTS TO RAD PROT COORD THAT ALLOWABLE DOSE IS LESS THAN EXPECTED DOSE.

Evaluator Cue: ACKNOWLEDGE REPORT AS THE RAD PROT COORD.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: WHEN REPORT IS MADE, STATE THAT THE JPM IS COMPLETE.

Stop Time:

M/jlg Page 8 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-08.04.06-001 HIGH RADIATION AREA ENTRY, Rev. 0 SIMULATOR SET UP: (Modify table as necessary)

Simulator Setup Instructions:

  • Initialize the simulator to any IC with the plant at 100% power.

EVENT NUMBER EVENT FILE NAME EVENT WORD DESCRITPTION 1.

2.

SIMULATOR - MALFUNCTIONS:

MALF ID MALFUNCTION TITLE DELAY RAMP EVENT VALUE FINAL.

1. None 00:00:00 00:00:00
2. 00:00:00 00:00:00
3. 00:00:00 00:00:00
4. 00:00:00 00:00:00 SIMULATOR - OVERRIDES:

OVERRIDE ID. OVERRIDE DELAY RAMP EVENT VALUE FINAL DESCRIPTION

1. None 00:00:00 00:00:00 2.

3.

4.

SIMULATOR - REMOTE FUNCTIONS:

REMOTE REMOTE FUNCTION TITLE DELAY RAMP EVENT VALUE FINAL FUNC. No.

1.

2.

M/jlg Page 9 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-0045-001, ROD BLOCK MONITOR FUNCTIONAL TEST, Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: (Optional)

M/jlg Page 10 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: BYPASS CONFIGURATION VERIFICATION OF ELECTRICAL CIRCUITS JPM NUMBER: JPM-4 AWI-04.04.03-002 REV. 1 RELATED PRA NONE INFORMATION:

TASK NUMBER(S) / SS299.162 TASK TITLE(S):

K/A NUMBERS: 2.2.11 Rating: SRO/RO: 3.4/2.5 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 20 Minutes Time Critical: NO Alternate Path / Faulted: NO TASK APPLICABILITY: SRO: X SRO/RO: SRO/RO/NLO:

Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File M/jlg Page 1 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.03-002 (BYPASS CONFIGURATION VERIFICATION OF ELECTRICAL CIRCUITS) Rev. 1 JPM Number: JPM-4 AWI-04.04.03-002 JPM

Title:

Bypass Configuration Verification of Electrical Circuits Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

M/jlg Page 2 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.03-002 (BYPASS CONFIGURATION VERIFICATION OF ELECTRICAL CIRCUITS) Rev. 1 JPM BRIEFING/TURNOVER (See MTCP-03.32, Figure 6.2)

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

STATE THE FOLLOWING:

THE TITLE OF THIS JPM IS BYPASS CONFIGURATION VERIFICATION OF ELECTRICAL CIRCUITS THE TASK CONDITIONS ARE AS FOLLOWS:

  • THE PLANT IS OPERATING AT 100% POWER.
  • A JUMPER BYPASS FORM (FORM 3034) HAS BEEN INITIATED FOR AN ELECTRICAL CIRCUIT AND NEEDS TO BE VERIFIED.
  • YOU ARE AN EXTRA LICENSED OPERATOR.

INITIATING CUES (IF APPLICABLE):

[STATE OPERATORS NAME] YOU ARE DIRECTED TO VERIFY THAT THE PROPOSED ELECTRICAL CIRCUIT BYPASS IS CORRECT PER 4 AWI-04.04.03 SECTION 4.4 BYPASS CONFIGURATION VERIFICATION OF ELECTRICAL CIRCUITS. INFORM ME WHEN YOUR ACTION(S) ARE COMPLETE.

PROVIDE THE OPERATOR A MARKED UP COPY OF FORM 3034 (JUMPER BYPASS FORM) TO BE USED FOR VERIFICATION.

ALL OPERATOR ACTIONS ARE TO BE SIMULATED.

M/jlg Page 3 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.03-002 (BYPASS CONFIGURATION VERIFICATION OF ELECTRICAL CIRCUITS) Rev. 1 JPM PERFORMANCE INFORMATION Required Materials: NONE General

References:

4 AWI-04.04.03, LOGIC DIAGRAMS NX-8292-12-1 AND NX-8292-12-3 Task Standards: VERIFIES FORM 3040 (JUMPER BYPASS FORM)

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 LOCATE PROCEDURE 4 AWI-04.04.03 (BYPASS CONTROL)

Critical: N OPERATOR LOCATES PROCEDURE 4 AWI-04.04.03 AND REFERS TO SECTION 4.4.

Standard: LOCATED PROCEDURE AND REFERRED TO SECTION 4.4.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 4 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.03-002 (BYPASS CONFIGURATION VERIFICATION OF ELECTRICAL CIRCUITS) Rev. 1 Performance Step: 2 CONFIGURATION VERIFICATION SHALL BE PERFORMED BY SHIFT Critical: N SUPERVISION, THE SYSTEM ENGINEER, THE PROJECT ENGINEER, OR THEIR DESIGNEE PRIOR TO THE TEMPORARY MODIFICATION OF ELECTRICAL CIRCUITS. THIS MAY BE THE PERSON WHO PREPARED THE JUMPER BYPASS FORM.

  • SHIFT SUPERVISION, THE SYSTEM ENGINEER, OR THE PROJECT ENGINEER MAY DESIGNATE A KNOWLEDGEABLE INDIVIDUAL TO PERFORM THE CONFIGURATION VERIFICATION.
  • WHEN DETERMINING AN INDIVIDUAL TO BE KNOWLEDGEABLE TO PERFORM CONFIGURATION VERIFICATION, SHIFT SUPERVISION, THE SYSTEM ENGINEER, OR THE PROJECT COORDINATOR/PROJECT ENGINEER SHOULD CONSIDER THE FOLLOWING FOR THE PROPOSED DESIGNEE:
  • WORK EXPERIENCE
  • PRINT READING CAPABILITIES
  • KNOWLEDGE OF THE AFFECTED EQUIPMENT KNOWLEDGE OF THE CONFIGURATION VERIFICATION REQUIREMENTS OF THE INSTRUCTION.

OPERATOR REVIEWS STEP 4.4.1 AND DETERMINES THE CRITERIA IS MET.

Standard: VERIFIED THE CRITERIA IS MET.

Evaluator Cue: IF QUESTIONED ABOUT THE INDIVIDUAL OPERATORS ABILITY, STATE THAT THE SHIFT MANAGER HAS REVIEWED THESE CRITERIA AND HAS SELECTED YOU TO PERFORM THE TASK.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 CONFIGURATION VERIFICATION IS NOT REQUIRED FOR TEMPORARY Critical: N MODIFICATIONS OTHER THAN THOSE TO ELECTRICAL CIRCUITS.

OPERATOR DETERMINES CONFIGURATION VERIFICATION IS REQUIRED.

Standard: RECOGNIZED VERIFICATION IS REQUIRED.

Evaluator Cue: IF THERE IS ANY QUESTION ABOUT THE NEED FOR VERIFICATION, STATE THAT THE VERIFICATION IS REQUIRED.

Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 5 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.03-002 (BYPASS CONFIGURATION VERIFICATION OF ELECTRICAL CIRCUITS) Rev. 1 Performance Step: 4 THE INDIVIDUAL PERFORMING THE CONFIGURATION VERIFICATION Critical: N SHALL:

  • COMPARE TWO OR MORE INDEPENDENT CONTROLLED DRAWINGS, WHEN AVAILABLE, TO VERIFY BOTH AGREE.

OPERATOR LOCATES LOGIC DRAWINGS NX-8292-12-1 (3).

Standard: LOCATED DRAWINGS.

Evaluator Cue: WHEN OPERATOR GOES TO IDENTIFY AND USE A SECOND DRAWING, STATE THAT THE SECOND INDEPENDENT CONTROLLED DRAWING HAS BEEN VERIFIED SATISFACTORILY.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 THE INDIVIDUAL PERFORMING THE CONFIGURATION VERIFICATION Critical: Y SHALL:

  • CHECK SPECIFIED TERMINAL POINTS, FUSES, AND FUSE BLOCK CONNECTIONS FOR ACCURACY IN NOMENCLATURE AND ACCESSIBILITY WHEN JUMPERS, BOOTS, OR OTHER BYPASS DEVICES MUST BE USED.

OPERATOR LOCATES BB-59 AND BB-68 ON DRAWING NX-8292-12-1 AND RECOGNIZES THAT INSTALLING THE JUMPER WOULD ENERGIZE RELAY 23A-K18 WHICH WILL SIMULATE MO-2036 BEING >20-25% OPEN.

Standard: REVIEWED DRAWINGS PROVIDED TO PERFORM VERIFICATION Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 6 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.03-002 (BYPASS CONFIGURATION VERIFICATION OF ELECTRICAL CIRCUITS) Rev. 1 Performance Step: 6 COMPLETE A DRAWING REVISION REQUEST PER 4 AWI-02.04.03 Critical: N (DRAWING REVISIONS, CREATIONS AND DELETIONS) TO DOCUMENT ANY DRAWING DISCREPANCIES DISCOVERED DURING COMPARISON OF INDEPENDENT DRAWINGS.

1. IF THE DRAWING DISCREPANCY AFFECTS THE CONFIGURATION BEING VERIFIED, THEN IT SHALL NOT BE USED AS AN INDEPENDENT DRAWING FOR PRINT COMPARISON.
2. IF INVESTIGATION OF THE DRAWING DISCREPANCY REVEALS THAT THE PHYSICAL CONDITION OF THE PLANT IS INCORRECT OR INDETERMINATE, AN ACTION REQUEST SHOULD BE INITIATED PER 4 AWI-10.01.03 (ACTION REQUEST PROCESS (FP-PA-ARP-01)).

Standard: DETERMINED NO DRAWING REVISION REQUIRED.

Evaluator Cue: STATE NO DRAWING REVISION IS REQUIRED.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 THE INDIVIDUAL PERFORMING THE CONFIGURATION VERIFICATION Critical: Y SHALL

  • ENSURE THE BYPASS CONNECTION POINTS ARE TECHNICALLY ACCURATE.

OPERATOR DETERMINES THE FOLLOWING: CONTROL ROOM ANNUNCIATORS C03A-15 & 39 AND ANNUNCIATOR C03B-9 WOULD ACTUATE BY REVIEWING LOGIC DIAGRAMS NX-8292-12-1 (3).

Standard: VERIFIED EACH ALARM WOULD COME IN BY HANGING THE JUMPER.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 7 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.03-002 (BYPASS CONFIGURATION VERIFICATION OF ELECTRICAL CIRCUITS) Rev. 1 Performance Step: 8 THE INDIVIDUAL PERFORMING THE CONFIGURATION VERIFICATION Critical: N SHALL

  • CHECK APPROPRIATE BLOCK ON THE JUMPER BYPASS FORM FOR THE VERIFICATION METHOD USED.

OPERATOR CHECKS BLOCK FOR COMPARISON OF INDEPENDENT PRINTS AND WRITES IN PRINT NUMBER.

Standard: CHECKED BLOCK FOR COMPARISON OF INDEPENDENT PRINTS.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 THE INDIVIDUAL PERFORMING THE CONFIGURATION VERIFICATION Critical: N SHALL

  • SPECIFY THE PRINTS USED TO PERFORM THE CONFIGURATION VERIFICATION IF PRINT COMPARISON WAS USED FOR CONFIGURATION VERIFICATION IN THE SPACE PROVIDED.

OPERATOR WRITES IN PRINT NUMBERS NX-8292-12-1 (3).

Standard: WROTE IN PRINT NUMBER.

Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 SIGNS AND DATE THE CONFIGURATION VERIFIED BY BLANK ON THE Critical: N JUMPER BYPASS FORM WHEN CONFIGURATION VERIFICATION IS COMPLETE.

OPERATOR SIGNS FORM FOR CONFIGURATION VERIFICATION COMPLETE AND STATE THE TASK IS COMPLETE.

Standard: SIGNED FORM FOR CONFIGURATION VERIFICATION COMPLETE.

Evaluator Cue: WHEN TOLD THE CONFIGURATION VERIFICATION IS COMPLETE. TAKE COMPLETED FORM 3034.

Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 8 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.03-002 (BYPASS CONFIGURATION VERIFICATION OF ELECTRICAL CIRCUITS) Rev. 1 Performance Step: 11 INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Critical: N Standard: OPERATOR INFORMS EVALUATOR THAT THE TASK IS COMPLETED.

Evaluator Cue: STATE JPM IS COMPLETE.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

Stop Time:

M/jlg Page 9 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-4 AWI-04.04.03-002 (BYPASS CONFIGURATION VERIFICATION OF ELECTRICAL CIRCUITS) Rev. 1 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: (Optional)

M/jlg Page 10 of 10

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: DETERMINE CURRENT PROCEDURE REVISION JPM NUMBER: JPM-4 AWI-02.01.02-001 REV. 0 RELATED PRA INFORMATION:

TASK NUMBER(S) / SS299.292 TASK TITLE(S): IMPLEMENT THE PROCEDURE USE STANDARDS THAT WILL ENSURE THAT OPERATIONAL PROCEDURES ARE EFFECTIVELY IMPLEMENTED K/A NUMBERS: 2.1.21 Rating: SRO/RO: 3.2/3.1 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: X Perform:

EVALUATION LOCATION: In-Plant: X Control Room:

Simulator: Other:

Lab:

Time for Completion: 15 Minutes Time Critical: NO Alternate Path / Faulted: NO TASK APPLICABILITY: SRO: X SRO/RO: SRO/RO/NLO:

Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File M/jlg Page 1 of 8

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM- 4 AWI-02.01.02-001, DETERMINE CURRENT PROCEDURE REVISION, Rev. 0 JPM Number: JPM- 4 AWI-02.01.02-001 JPM

Title:

DETERMINE CURRENT PROCEDURE REVISION Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

M/jlg Page 2 of 8

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM- 4 AWI-02.01.02-001, DETERMINE CURRENT PROCEDURE REVISION, Rev. 0 JPM BRIEFING/TURNOVER (See MTCP-03.32, Figure 6.2)

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • CORE SPRAY COMPREHENSIVE PUMP AND VALVE TEST, 0255-03-III-1A IS SHEDULED TO BE PERFORMED
  • THE REACTOR IS OPERATING AT RATED CONDITIONS INITIATING CUES (IF APPLICABLE):
  • OBTAIN TEST 0255-03-III-1A AND VERIFY IT IS THE CURRENT REVISION
  • ALL OPERATOR ACTIONS ARE TO BE PERFORMED.

M/jlg Page 3 of 8

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM- 4 AWI-02.01.02-001, DETERMINE CURRENT PROCEDURE REVISION, Rev. 0 JPM PERFORMANCE INFORMATION Required Materials:

General

References:

Task Standards:

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 OBTAINS COPY OF TEST 0255-03-III-1A Critical: NO Standard: OBTAINS TEST PROCEDURE Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments: TEST PROCEDURE MAY BE OBTAINED FROM FILE CABINET IN WORK CONTROL AREA OR PRINTED OUT M/jlg Page 4 of 8

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM- 4 AWI-02.01.02-001, DETERMINE CURRENT PROCEDURE REVISION, Rev. 0 Performance Step: 2 THE CURRENT REVISION OF THE DOCUMENT SHALL BE VERIFIED BY ONE Critical: NO OF THE FOLLOWING METHODS:

A. CONSULT THE DATA BASE VIA THE COMPUTER TERMINAL (SEE SECTION 4.3 FOR INSTRUCTIONS ON ACCESSING CONTROLLED DOCUMENT DATA BASE).

Standard: ATTEMPTS TO LOG INTO CHAMPS DATA BASE Evaluator Cue: INFORM THE OPERATOR THAT THE DOCUMENT CONTROL DATA BASE IS UNAVAILABLE FOR USE AT THIS TIME Performance: SATISFACTORY UNSATISFACTORY Comments: IF THE CANDIDATE CHOOSES TO CONTACT DOCUMENT CONTROL, SEE STEP 7.

Performance Step: 3 THE CURRENT REVISION OF THE DOCUMENT SHALL BE VERIFIED BY ONE Critical: YES OF THE FOLLOWING METHODS:

B. CHECK THE CONTROLLED DOCUMENT MASTER FILE IN THE SITE ADMIN BUILDING

1. FOR PROCEDURES, VERIFY THAT ANY 3087 CATEGORY A, IS ADDRESSED AS PART OF THE PROCEDURE BEING USED.

Standard: LOCATES MASTER AND VERIFIES CATEGORY A IS ADDRESSED Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 THE CURRENT REVISION OF THE DOCUMENT SHALL BE VERIFIED BY ONE Critical: YES OF THE FOLLOWING METHODS:

B. CHECK THE CONTROLLED DOCUMENT MASTER FILE IN THE SITE ADMIN BUILDING

1. FOR PROCEDURES, VERIFY THAT ANY 3087 CATEGORY B, IS ADDRESSED AS PART OF THE PROCEDURE BEING USED.

Standard: LOCATES MASTER AND VERIFIES CATEGORY B IS ADDRESSED Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 5 of 8

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM- 4 AWI-02.01.02-001, DETERMINE CURRENT PROCEDURE REVISION, Rev. 0 Performance Step: 5 THE CURRENT REVISION OF THE DOCUMENT SHALL BE VERIFIED BY ONE Critical: YES OF THE FOLLOWING METHODS:

B. CHECK THE CONTROLLED DOCUMENT MASTER FILE IN THE SITE ADMIN BUILDING

1. FOR PROCEDURES, VERIFY THAT ANY 3087 CATEGORY E, IS ADDRESSED AS PART OF THE PROCEDURE BEING USED Standard: LOCATES MASTER AND VERIFIES CATEGORY E IS ADDRESSED Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 THE CURRENT REVISION OF THE DOCUMENT SHALL BE VERIFIED BY ONE Critical: YES OF THE FOLLOWING METHODS:

B. CHECK THE CONTROLLED DOCUMENT MASTER FILE IN THE SITE ADMIN BUILDING

1. FOR PROCEDURES, VERIFY THAT ANY 3087 CATEGORY G, IS ADDRESSED AS PART OF THE PROCEDURE BEING USED Standard: LOCATES MASTER AND VERIFIES CATEGORY G IS ADDRESSED Evaluator Cue: NONE Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 THE CURRENT REVISION OF THE DOCUMENT SHALL BE VERIFIED BY ONE Critical: NO OF THE FOLLOWING METHODS:

C. CONTACT APPROPRIATE PERSONNEL IN DOCUMENTS & RECORDS MANAGEMENT GROUP FOR ASSISTANCE Standard: ATTEMPTS TO CONTACT A MEMBER OF THIS GROUP Evaluator Cue: IF THIS OPTION IS ATTEMPTED, STATE THAT NO ONE IN THIS GROUP CAN BE CONTACTED.

Performance: SATISFACTORY UNSATISFACTORY Comments:

M/jlg Page 6 of 8

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM- 4 AWI-02.01.02-001, DETERMINE CURRENT PROCEDURE REVISION, Rev. 0 Performance Step: 17 INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Critical: NO Standard: Operator informs evaluator that the task is completed.

Evaluator Cue: ACKNOWLEGE TASK COMPLETE, STATE THAT JPM IS COMPLETE Performance: SATISFACTORY UNSATISFACTORY Comments: DO NOT PROMPT.

Terminating Cues:

Stop Time:

M/jlg Page 7 of 8

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM- 4 AWI-02.01.02-001, DETERMINE CURRENT PROCEDURE REVISION, Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: (Optional)

M/jlg Page 8 of 8

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: MONTICELLO NUCLEAR GENERATING PLANT JPM TITLE: OFF-SITE PROTECTIVE ACTION RECOMMENDATIONS JPM NUMBER: JPM-A.2-204-003 REV. 1 RELATED PRA None INFORMATION:

TASK NUMBER(S) / SS304.121 TASK TITLE(S): Formulate off-site protective action recommendations for the general public during the early phase of an emergency.

K/A NUMBERS: Generic 2.4.44 Rating: SRO/RO: 4.0/2.1 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: YES Alternate Path / Faulted: NO TASK APPLICABILITY: SRO: X SRO/RO: SRO/RO/NLO:

Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File M/jlg Page 1 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-A.2-204-003, OFF-SITE PROTECTIVE ACTION RECOMMENDATIONS, Rev. 1 JPM Number: JPM-A.2-204-003 JPM

Title:

Off-Site Protective Action Recommendations Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Comments SHALL be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

M/jlg Page 2 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-A.2-204-003, OFF-SITE PROTECTIVE ACTION RECOMMENDATIONS, Rev. 1 JPM BRIEFING/TURNOVER (See MTCP-03.32, Figure 6.2)

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • THIS IS A DRILL.
  • The plant is shutdown in an Emergency Condition. An escalation to a General Emergency has just been declared (EAL Guideline 28, Section E.).
  • All release rates are normal.
  • Current Met Data is:

Wind direction (from): 285 degrees Wind speed: 10 mph Temperature: 55°F Precipitation: none Ch. 11 - Diff. Temp: -0.79 INITIATING CUES (IF APPLICABLE):

  • THIS IS A DRILL.
  • Initiate and complete Form 5790-102-02 (MONTICELLO EMERGENCY NOTIFICATION REPORT FORM) and provide to Shift Manager/Emergency Director when complete.
  • ALL OPERATOR ACTIONS ARE TO BE PERFORMED.
  • THIS IS A DRILL.

Instructor note: This JPM is time critical. Start time is when the initiating cue is acknowledged by the examinee. Stop time is when the examinee returns the JPM paper work to you or verbally states the task is complete.

M/jlg Page 3 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-A.2-204-003, OFF-SITE PROTECTIVE ACTION RECOMMENDATIONS, Rev. 1 JPM PERFORMANCE INFORMATION Required Materials: None General

References:

Simulator Task Standards: A.2-204 rev 17.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Locate General Emergency form packet. (May also reference procedure A.2-204 Critical: N OFF-SITE PROTECTION ACTON RECOMMENDATIONS)

Standard: Locates General Emergency packet.

Evaluator Cue: When examinee locates General Emergency packet, hand them a copy of the material from the packet.

Performance: SATISFACTORY UNSATISFACTORY Comments: The items covered by JPM steps 2 and 3 may be done in any order as long as the standard for each step is met.

M/jlg Page 4 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-A.2-204-003, OFF-SITE PROTECTIVE ACTION RECOMMENDATIONS, Rev. 1 Performance Step: 2 Procedure A.2-204 (Step 6.1.1.A and 6.1.1.B)

Critical: Y 6.1.1 Initiate Form 5790-102-02 (MONTICELLO EMERGENCY NOTIFICATION REPORT FORM)

A. Complete the Protective Action Recommendations section recommending sheltering or an evacuation of a 2 mile radius and 5 miles downwind and advise the remainder of the plume EPZ to go indoors to monitor EAS broadcasts. (See Figure 7.3.A for assistance.)

B. Determine which geopolitical subareas are affected by referring to the Sector-Subarea Conversion Table on Form 5790-102-02 Standard: Complete Section 10 of Form 5790-102-02. The grading standard is as follows:

  • Item B is circled.
  • The word Evacuate is circled.
  • The blank in front of Sectors out to 2 miles contains the word ALL
  • The blank in front of Sectors out to 5 miles contains the word downwind or E,F,G
  • Only the following subareas are circled: 2, 5E and 5S.

Evaluator Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments: See attached form with data filled in.

M/jlg Page 5 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-A.2-204-003, OFF-SITE PROTECTIVE ACTION RECOMMENDATIONS, Rev. 1 Performance Step: 3 Procedure A.2-204 (Step 6.1.1.C)

Critical: Y Initiate Form 5790-102-02 C. Ensure completion of the remaining sections of Form 5790-102-02 and submit the completed form to the ED for approval.

Standard: The grading standard is as follows:

  • Section 1: item B should be circled (not critical).
  • Section 2: item B should be circled (not critical).
  • Section 4: item D should be circled.
  • Section 5: item A circled (not critical), date and time filled in and GL # 28.
  • Section 6: item A should be circled.
  • Section 7: item A should be circled (not critical).
  • Section 8: Wind direction is 285 degrees and affected downwind sectors E, F and G should be circled.
  • Section 9: Wind speed of 10 mph and stability class E circled.
  • Section 11: Examinee should indicate that they would use the label from the General emergency packet here (specifically the label for GL 28E).

Evaluator Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments: See attached form with data filled in.

Performance Step: 4 INFORM EVALUATOR THAT THE TASK HAS BEEN COMPLETED.

Critical: N Standard: Operator informs evaluator that the task is completed.

Evaluator Cue: None Performance: SATISFACTORY UNSATISFACTORY Comments: DO NOT PROMPT.

Terminating Cues: When told the actions are complete, acknowledge, and state the JPM is complete.

Stop Time:

M/jlg Page 6 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-A.2-204-003, OFF-SITE PROTECTIVE ACTION RECOMMENDATIONS, Rev. 1 SIMULATOR SET UP: (Modify table as necessary)

Simulator Setup Instructions:

  • None EVENT NUMBER EVENT FILE NAME EVENT WORD DESCRITPTION 1.

2.

SIMULATOR - MALFUNCTIONS:

MALF ID MALFUNCTION TITLE DELAY RAMP EVENT VALUE FINAL.

1. None 00:00:00 00:00:00
2. 00:00:00 00:00:00
3. 00:00:00 00:00:00
4. 00:00:00 00:00:00 SIMULATOR - OVERRIDES:

OVERRIDE ID. OVERRIDE DELAY RAMP EVENT VALUE FINAL DESCRIPTION 1.

2.

3.

4.

SIMULATOR - REMOTE FUNCTIONS:

REMOTE REMOTE FUNCTION TITLE DELAY RAMP EVENT VALUE FINAL FUNC. No.

1.

2.

  • Set for current weather condition M/jlg Page 7 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

  • THIS IS A DRILL.
  • The plant is shutdown in an Emergency Condition. An escalation to a General Emergency has just been declared (EAL Guideline 28, Section E.).
  • All release rates are normal.
  • Current Met Data is:

Wind direction (from): 285 degrees Wind speed: 10 mph Temperature: 55°F Precipitation: none Ch. 11 - Diff. Temp: -0.79 INITIATING CUES (IF APPLICABLE):

  • THIS IS A DRILL.
  • Initiate and complete Form 5790-102-02 (MONTICELLO EMERGENCY NOTIFICATION REPORT FORM) and provide to Shift Manager/Emergency Director when complete.
  • ALL OPERATOR ACTIONS ARE TO BE PERFORMED.
  • THIS IS A DRILL.

M/jlg Page 8 of 9

QF-1030-11 Rev. 2 (FP-T-SAT-30)

JPM-A.2-204-003, OFF-SITE PROTECTIVE ACTION RECOMMENDATIONS, Rev. 1 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Historical Record: (Optional)