Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:
May 10, 2004 Time:
1400 Preparer:
dJon Leiker U
I R
28 NOTE:
Refer to base procedure NP 10.3.6 for safety assessment checklist KSF definitions.
NMOTE:
Il Yhenever fuel hlas been removed from the reactor vessel and refueling cavity, all key safelyfuncetions are GREEN except spent fuel pool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = 1. through 4 REACTIVITY
- 1.
RCS Boron concentration = 3008 ppm a.)
For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)
For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C
- 2.
Number of boration paths
- 3.
No fuel motion
- 4.
SR instrumentation operable Cavity Boron concentration = 3006ppm Subtotal Condition RED ORANGE V.RAQ (0-1) 1 (0-2) 2 (0-1) 1 (0-1)
I 0-1 2
3-4 5
Subtotal =
5 CORE COOLING Subtotal Condition
- 1.
Number of SG available for DHR (0-2) 0 0-1 RED
- 2.
Refueling cavity filled (0-1) 1 2
ORANGE
- 3.
Number of trains RHR available (0-2) 2 3
- 4.
RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS Temperature =76TF; 37 days shutdown; RCS Level = Refueling leight; Reactor is refueled Subtotal =
4 4 RCS Time to Boil 39 hrs (Applicable at Cold or Refueling Shlutdown)
POWER AVAILABILITY Subtotal Condition I.
Independent off-site power sources I
RED available to A-05 and A-06 (totally 2
ORANGE independent at the 4160 V, 13.8 kV.
3 and 345 kV levels)
(0-2) 2 4-5
- 2.
G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B1-04 available (0-1) 1
- 3.
G-05 available, Reactor Cavity filled to a 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(0-1) 1 Subtotal =
5 INVENTORY Subtotal Condition 0-I RED
- 1.
Pressurizer level Ž20 percent w/head on (0-1) 0 2
ORANGE
- 2.
Refueling Cavity filled (see definition)
(0-3) 3 3
T V
- 3.
RCS level above REDUCED INVENTORY (0-1) 1 4
- 4.
Makeup from VCTIBLENDER and/or RWST available (0-2) 0 Subtotal =
4 iammWal" Freedom of lWformabon I
Revision 2 10130/0-2 Act OXe T (fis Pqs' I of 9 Fab-o
. P.n
- )-
Rcfcrences: NP 10.3.6 NP 10.2.1
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT
- 1.
Containment integrity (TS 15.I.D) I Containment Operable) (ITS TS 3.6.1 )set
- 2.
Containment Closure CL-AE maintained and closure < time to boil
- 3.
No fuel motion
- 4.
DHR Capability:
cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0
( or 2) 2 (0-1) 1 Subtotal 0
1 2-3 4-5-6 Condition RED ORANGE
-YXyM (0-1) 1 Subtotal =
4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
NOTE:
Take credit for only one P-12 independent offsite power source during periods of single X-03 or X-04 availability (*).
- 1.
"A" SFP cooling pump available with power available from:
G-02 or G-01 via 2B-32
.(*) an independent off-site power source different than that for Train B below
- 2.
"B" SFP cooling pump available with power available from:
G-03 or G-04 via IB-42
.(*) an independent off-site power source different than that for Train A above
- 3.
Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
Subtotal 0-1 2
3 4-5 Condition RED ORANGE YELLOW GREEN (0-1)
NA (0-1)
NA (0-1)
NA (0-1)
NA (0-1)
NA SFP Temperatures:
NV NA OF SE NA 0F SFP Average Temp NA SFP Time to Boil NA Subtotal =
NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
Look ahead #1: When IB-41 is taken OOS, do not take credit for G-01 & G-02, which will lose I point for Power Availability. Make sure 1X-03 is not coincidently OOS.
Look-ahead #2: When reactor cavity level falls below 23 ft above flange, will lose 1 point for Power Availability and will also move to Fire Protection Condition III.
Look-ahead #3: When reactor vessel internals are moved, will lose 1 point for Reactivity, I point for Inventory, and 2 points for Containment (assuming no CFCs are available).
PBF-1562 Revision 2 10/30/02
References:
NP 103.6 NP 10.2.1 Page 2 of 9
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT J.::
UNIT:
1 DATE:
May 10, 2004 TIME:
1400 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
CONTAINMENT:
SFP COOLING:
GREEN GREEN GREEN GREEN GREEN NA PROTECTED EOUIPMENT:
RCS Time to Boil is 39 hours4.513889e-4 days <br />0.0108 hours <br />6.448413e-5 weeks <br />1.48395e-5 months <br /> Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention PBF-1562 Revision 2 10/30/02
References:
NP 103.6 NP 10.2.1 Page 5 of 9