5-"T M.a I

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

May 10,2004 Time:

0230 Preparer:

James H. Hanna U

I R

28 NOTE:

Refer to base procedure NP 10.3.6for safety assessment checklist KSF definitions.

NOTE:

WYheneverfuel has been removed from the reactor vessel and refueling cavity, all key safety functions are GREEN except spentfuelpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration = 3008 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Cavity Boron concentration = 3006 ppm Subtotal Condition RED ORANGE

-YJ :.

(0-1) 1 (0-2) 2 (0-1) 1 (0-1) 1 0-1 2

3-4 5

Subtotal=

5 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 1 2

ORANGE

3.

Number of trains RHR available (0-2) 2 3

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TEMP =79F; 37 days shutdown, Subtotal 4

RCS Level =Refueling Height RCS Time to Boil 39 hrs (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the4160 V, 13.8 kV, 3

il_,

and 345 kV levels)

(0-2) 2 4-5 Z D

2.

G-01 orG-02/A-05/B-03 available (0-1)

I G-03 or G-04/A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 1 Subtotal 5

INVENTORY Subtotal Condition 0-1 RED

1.

Pressurizer level 220 percent w/head on (0-1) 0 2

ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 3 3

I

3.

RCS level above REDUCED INVENTORY (0-I) 1 4

4.

Makeup from VCTIBLENDER and/or RWST available (0-2) 0 Subtotal 4

PBF-1562 Revision 2 10/30/02 kftftMak3

  1. tisrxdvw f catI in accordanm wih be Freedom of flformation Page I of 9 1 '-

-baP l/L-(r1

References:

NP 10.3.6 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.1.D) (Containment Operable) {ITS TS 3.6.1) set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1) 1 Subtotal 0

l 2-3 4-5-6 Condition RED ORANGE CGREEN IZ (0-1)

I Subtotal -

4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only oneP-12 Independent offstiepower source during periods of single X-03 orX-04 availability (*).

1.

"A" SFP cooling pump available with power available from:

G-02 or G-0I via 2B-32

.(*) an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via I B-42

  • (*) an independent off-site power source different than that for Train A above
3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil Ž 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SFP Temperatures:

NW NA OF SE NA 0F SFP Average Temp NA OF SFP Time to Boil NA Subtotal 0-1 2

3 4-5 Condition RED ORANGE YELLOW GREEN (0-I)

NA (0-1)

NA (0-1)

NA (0-1)

NA (0-I)

NA Subtotal =

NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

"B" Train RHR returned to service.

ISI-825B SI suction valve from RWST returned to service.

I SI-878B SI cold leg injection valve returned to service.

PBF-1562 Revision2 10130/02 Rferences: NP 103.6 NP 10.2.1 Page 2 of 9

I I

.e Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

1 DATE:

May 10, 2004 TIME:

. 0200 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

PROTECTED EOUIPMENT:

GREEN GREEN GREEN GREEN GREEN NA COMMENTS:

RCS Time to Boil is 39 hours4.513889e-4 days <br />0.0108 hours <br />6.448413e-5 weeks <br />1.48395e-5 months <br /> Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF-1562 Revision 2 10/30102

References: