L - 1, I z I Committed to Nuclear Excdllcnc t
OURfTEY B
F SUIT SERCH
- UIR2I Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Sunday, May 9, 2004 Start Time:
1800 NSB Cafeteria ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)
Operations Coordinators (SOC)
Maintenance Coordinators (MOC)
Engineer / Projects Coordinators (EOM)
Rad Protection Manager (RPM)
Site Safety Coordinator (SSC)
Shutdown Safety Assessor (SSA)
Site Management (SSM)
General Supervisors First Line Supervisors Agenda
- 1. Safety Issue Discussion (SSC)
- 2. Radiation Protection (RPM)
- 3. Operations Coordinator Turnover (SOC)
- 4. Shutdown Safety Assessment (SSA)
- 5. Maintenance Coordinator Turnover (MOC)
- 6.
Engineering Coordinator Turnover (EOM)
- 7. Major Projects Update (EOM)
- 8. Schedule Review (SOM)
- 9. Management Expectations (SSM)
- 10. ACEMAN Assessment Results (SOM)
- 11. Shift Goals (SOM)
Items Included In Daily Package:
Site Communication Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Defined Critical Path Work Activity Risk Assignment Outage Schedule in a0or0r' ce %meh b Freedom of friforma on Act ex opt FqW
/
d3~-
1 BRIEFING NOTES 24-6G
NExc Conmmited to Nuclear Eciec IF POJ!D1JRfHY I1 PSofiT UCH
- UIRIN Point Beach Nuclear Plant UlR28 Refueling Outage
'., 't~
-}
i p, -.
- ' Id Safety
- w.
a Theme for the week This week's theme covers Emergency Situations. Be It weather, fire or a medical emergency, are we ready to respond to those unexpected situations?
"-"r ;
5 -
l D
aily afety-Snippets r Sunday
'You would be shocked if you found your emergency egress path blocked' Material is beginning to come out of containment as a lot of work Is wrapping up. Don't pile up tools and equipment in the walkway even for short periods of time. Always keep the egress paths open for use.
Monday.
Vf strong winds start to blow, do you know where to go?
Do you know the proper location to go in the event of a tornado warning If you are In the trailers, turbine hall or PAB? NP1.9.21 covers the site's various shelter areas. Plan ahead and take the time now to review the NP with your group.
Tuesday "Make sure to cleanup or a fire may start during heat up.
OE1531 0 Indian Point 3 - An oil vapor extractor for the main bolter feed pump failed. The tag out used to repair the extractor resulted in an Increased leakage of oil from the pump bearings onto lagging. A special log was created to monitor the leakage, but no plan existed for dealing with the safety hazards.
Maintenance repaired the extractor, returning it-to service. The next day a portion of oil soaked lagging on a main boiler feed pump caught fire and was quickly extinguished by an alert watchstander.
Wednesday
'Make heed - Don't block emergency equipment you may need."
Last week on the 66ft of containment, the NRC noticed we blocked access to 2 fire extinguishers mounted on the stairwell handrail. A scaffold was built In the area that made access questionable. We then added a number of bags of Insulation It made access Impossible. Just a question - Why Is the NRC finding this Instead of us?.
Thursday "What number do you coil if your co-worker takes a serious fall" What is the plant's emergency number? 2911. This number Is only to be used for emergency situations.
Two weeks ago a work group was having trouble getting through to operations to communicate a change In equipment status. Rather than waiting, the Individual Involved decided to contact the control room via the emergencv number. Needless to say this was not an appropriate use of 2911.
Friday
'Wfake sure your fire watch is alert to keep someone from getting hurt" OE12607-LaSalle - A worker using an acetylene torch for cutting through a structural member that was behind a metal wall panel. Wall Insulation behind the member began to burn. The alert fire watch extinguished the fire within one minute of it beginning and no significant damage occurred.
Saturday "b!ebris buildup may result In an unplanned heat up" OE1 4899 River Bend Station - A small fire occurred under the exhaust piping on a diesel generator during testing. The fire was observed during routine checks of the generator and the control room was immediately notified. The control room unloaded the generator while the operator extinguished the fire. The cause was Insulation debris that accumulated around the hot piping over time.
-2
Point Beach Nuclear Plant Outage 1 R28 DAY Supporting Operational Excellence 35 Path N.~
M 1 11 Picture Meets Outaae Radiation Performance 1LA--&
=___A
I I
%a uu LVwp Ita IVaIOa L-A%.
~ f This indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.
Meets:
<=75 Rem Actual Cum.
Exceeds:
<=71 Rem Dose:
54.763 Rem Day 35 - May 8 Actual = 0..831 Cumulative = 54.763 Cumulative Forecast = 67.488 Daily dose and PCE goals reforecast on 4/23.
Meets: <= 18 Exceeds: <= 12 Actual PCE's:
9 Co I
Stu Thomas I
Personnel Contamination Events Cummulative Dose Exposure 20 18 a 16 u 14 0"' 12
.a 10
° 8
0 U 6 z 4 2
0 E
00 0
Sw 0
au eo_
I 60 400 20 0
2 0 2 4 6 8 1012141618202224262830323436384042 0 2 4 6 8 101214161820222426283032343638404244464850
- No Commilted lo Nuclear Exc llence e Outage Status Report Plant
Point Beach Unit 1 Day:
Sunday Today's Date iTime:
5109104 1600 Outage Duration: Day 36 Of Refueling Outage Number U1R28 Safety Status Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0
First Aid cases 0
Significant near misses 0
Total for this outage 1
Summary:
Radiological Dose to date 54.763 Projected to date
- 67.488 Outage Goal S575 R Difference
-12.725
- Reforecast on 4/23 Number of PCEs 9
Summary:
Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0
Summary:
Plant Status Mode:
E Hot Standby (Mode 3)
E Hot Shutdown (Mode 4) 0 Cold Shutdown (Mode5) 0 Refueling Shutdown (Mode 6)
RCS:
Temperature:
81 Pressure:
Vented to Atmosphere RV Level:
Refueling Height Time to Boll:
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Shutdown Safety Assessment Protected Equipment:
Major Activities Completed In Last 24 Hours Critical Path and Near Critlal'Path Activities (Next 24 Hours)
- Ul Rx Head Penetration #26 - Thermal Sleeve Removed
- Ul Rx Head Penetration #26 - Ultrasonic Testing
- B Train LRPM Testing Significant Outstanding Issues Date Issue Due Responsibility 5/03/04 Reactor Vessel Head Repair Penetration #26 5/16/04 Jim Schweitzer 5/07/04 Turbine Building Crane Troubleshooting 5/09/04 Dan Laing 5/07/04 IHS-1 "A" S/G Main Steam Snubber Tail Rod 5/11104 Jim M. Wilson 5/08/04 B RCP Motor End Play 5/17/04 Dan Laing Upcoming Ma or Milestones Scheduled Actual Scheduled Actual Date Time Date Time' Date Time Date Time Cooldown <2000 4/03/04 2100 4/03/04 2230 RCS Fill & Vent 4/23/04 1500 Head Lift 4/09/04 0900 4/21/04 1550 Heatup >2000 4/25/04 0900 Refueled 4/14/04 0300 5/02104 1848 Reactor Critical 4/28/04 0800 RV Headset 4/18/04 1900 t
On-Line 4/30/04 0100 4
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
I DATE:
May 9, 2004 TIME:
1400 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
CONTAINMENT:
SFP COOLING:
PROTECTED EQUIPMENT:
GREEN YELLOW GREEN GREEN GREEN NA COMMENTS:
RCS Time to Boil is 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF 1S62 Revision 2 IlIQ30/02 5 Pagc 5 orf9 Refercnces: NP 10.3.6 NP 10.2.1
_Defined Critical Path U
ID I
DESCRIPTION ODIRDICal SYS EQID TF i9 MAY
~
I uI-Ss I 14 6.B 102t4,14.16.1 22I24,6,8,.10l12,l4dl6,l8,20,2210.2.4, B.
8,1p12.14,16,18s20,2 1 SDI600EO1 IP.26l EVAIJRESOLUTION OFl 24 19 1 1
RC I R1 0
S 26-EVALRESOLUTION OF HEAD MEASUREMENTS HEAD MEASUREMENTS o~~213475. 10MAY04 06:5908MAY04 22:OOA el I _ I.- I.oil1~~__
1 T.7440-H 1 480VMR 01-128 1B52.424C 1 1 1 1480V MR 01-128 3
T-7440 MR 01-128VB52.424C (St.8258) OPS REV0-1 (SI-825B) OPS REVO-1 0017440- 09MAY04 12:5909MAY04 12:00 1
01-135B-2 FILL&VENTRHRTRAINB 4
4 1
1 RH P-010B 0
01-1358 FIL&VENT RHRTRAIN B 09MAY04 15:5909MAY04 12:00 I
B52-424C BUS BRACING PMT 1 1 1 480V B.42 3
B52.42 CBUS BRACING PMT 1SI-825B
_S_
25B 30202527- 09MAY04 13:5909MAY04 13:00 I
HP7.51.6D PURGE VALVE TEST (HPIP 2
2 5
1 HP HP PURGE T 4
HP7.51. DPURGE VALVE TEST (HPIP 7.51.6) 7.51.6)
_9MAY04 14:5909MAY04 13:00 I
T-8970-R 1 01-135B OPS REVO-1 I
1 1 1 01-135 OPS 0
T. n 1 OI-1 35B OPS REVO.1 09MAYI 16:0030018970- 09MAY04 16:59 I
01-128-B FILL & VENT P-015B HHSI PP 4 4
1 1
SI P-0158 0
I.112 8 8FULL & VENT P.015B HHSI PP PER 01.128 (PARTIAL)
PER 01-128 (PARTIAL) 09MA 04 17:00 0408036. 09MAY04 20:59 I
OP0408036 P-15B PMT PER IT-01A 4
4 1
1 SI P-015B 0
OP0408036P-15BPMT PER IT.01A
_D 9MAY04 21:00_0408036-10MAY04 00:59 1
IT.530D LRPM & PIGGYBACK TEST 8
8 1 1 RH O-IT-0530D 0
IT.S30DLRPM & PIGGYBACK TEST OF TRAIN B SI OF TRAIN B SI 10MAY04 01:00_
0215917-10MAY04 08:59 1 CE1600R023 P MACHINING AND 4
4 1
1 RC R-1 0
CE10MA R023P MACHINING AND TRAVELER BRIEF (DAY)
TRAVELER BRIEF (DAY) 10MAY04 07:00~0213475-10MAY04 10:59 1
SIB01Z CLOSE HHSI B LOOP WORK 0
0 1
1 SI MILESTONE 0
SIBO1 *LOSE HHSI B LOOP WORK WINDOW WINDOW 10MAY04 09:00110MAY04 08:59 1
099-020 ALIGN BAST & P-015B FOR 2
2 1 1
SI SI-826A 0
0I99 020A1IGN BAST & P.01 5B FOR REACTIVITY FLOWPATH REACTIVITY FLOWPATH I
10MAY04 09:00K10MAY04 10:59 I
SIA01U END OF SI-ATRAIN ALIGNED 0
0 1 1 SI MILESTONE 0
SIA01UEND OF SI-A TRAIN ALIGNED AS REACTIVITY FLOWPATH AS REACTIVITY FLOWPATH 10MAY04 11:OO1OMAY04 10:59 I
CE1600R024 P ROLL I EXPAND 3
3 1 1 RC R-1 0
CEI600R024P ROLL I EXPAND PENETRATION PENETRATION 10MAY04 11:00_0213475-10MAY04 13:59 1
T-2610-H 1 SI SI-857A EM REVO-1 3
3 1
SI SI-857A 0
__10MAY04 11:00_0012610- 10MAY04 13:59 1 CE1600R025 P INSTALL HARD STOP 2
2 1 1 RC R-1 0
CEI600R025P INSTALL HARD STOP IN PENETRATION AND QC IN PENETRATION AND OC 10MAY04 14:00M0213476-10MAY04 15:59 1
EM0403301 SI-857A-O PERFORM STEM 10 10 1 1
St SI-00857A.
0 EM0403301S_.857A-O PERFORM STEM LUBE AND FBJ INSPECTION LUBE AND FBJ INSPECTO 10MAY04 14:00~
0403301 - 10MAY04 23:59 Run Date 09MAY04 13:41l LT-16 DEFINED CRITICAL PATH l
Shoot 1 of 2 OPrlmavera Systems. Inc.
FL-16 DEFINED CRITICAL PATH SET I
Defined Critical Path MAY U
ID DESCRIPTION OD RD Cal U SYS EQID TF 9
1 1D 1 CEI6IN
_46.8 8 1 12.124 22I 0, 2.4.6.8.10212.14016,18,20,221 0, 2,4.6. 8,10,12.14,16,18,20.22 I
CEI600R026 P INSTALL 212 MACHINE 4 4 1 1
RC R-1 a
CE1600R026P-26 -INSTALL 212 MACHINE 10MAY04 16:00 0213476-10MAY04 19:59 1 CEI600R031 P-26 -MACHINE NOZZLE 20 20 1 1
RC R-1 0
CEI600R031P 26 - MACHINE NOZZLE BORE BORE 0213476-11MAY04 15:5910MAY04 20:00
.i i
1 OP0403301 Sl-857A PERFORM PMT I
11 I
SI SI-00857A-0 OP0403301S1-857A PERFORM PMT STROKE IT-40 STROKE IT-40 11 MAY04 00:0010403301 - 11MAY04 00:59 1
T-2610-R 1 SI SI-857A EM REVO-1 2
2 1
1 SI SI-857A 0
_11MAY04 01:00 0012610- 11MAY04 02:59 1
SIAO1Z CLOSE HHSI A LOOP WORK 0 0 1 1
SI MILESTONE 0
SIAOtZCLOSE HHSI A LOOP WORK WINDOU WINDOW 11MAY04 030011 1MAY04 02:59 1
IT-530C LRPM & PIGGYBACK TEST 8
8 1
1 RH 0-IT-0530C 0
IT-53OCLRPM & PIGGYBACK TEST OF TRAIN A S OF TRAIN A St 0215916-11 MAY04 10:5911MAY04 03:00 1 SOP-CV-020 FILL & VENT LETDOWN &
3 3 1 1
CV SOP-CV-003 0
SOP-CV.02(FLL. & VENT LETDOWN & CHARGING CHARGING 11MAY04 11:00=11MAY04 13:59 I
T-8968-H 1 Y Y-4 EM REV.1-1 1
1 1 1
Y Y-4 0
T-896840 Y Y-4 EM REV1.1-1 CD 0018968-11MAY04 14:5911MAY04 14:001 1 EM0408172 MOB-004 4 4 1 1
Y MOB-004 0
EM0408172MOB-O4 CLEANINGIINSPCYCUNG CLEANING/INSPlCYCLING 0408172-11MAY04 18:59 11MAY04 15:00 1 CE1600R052 ETCH AND DETERMINE 2 2 1 1 RC R-1 0
CEI600RO52P-26 -ETCH AND DETERMINE "N DIMENSIO
- N DIMENSION 0213476-11MAY04 17:5911MAY04 16:00K Run Date 09MAY04 13:41 LT-16 DEFINED CRICAL PATH Shet 2 of 2 C Prfrnaera Systems, Inc.
FL-16 DEFINED CRICAL PATH SET
Run Date 09MAY04 13:43 Work Activity Risk Assignment Sheet i of 2 U l ACT lWOlGRPl HPE EQUIPMENT Activity Cal DUR START I FINISH 9 I Man ID.
S ID ST RISK Description ID'L'21 1
Z40 I
CEI600R051 76 CEO DR-Y ML-Y R-1 P TRAIN WELDERS 1
19 08MAY04 IOMAY04 IREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M CRAFTSUPPORT 14 OOA 06:59 0213475 - 128CE 1
CEI60WR021 76 CE8 DR-Y ML-Y R-1 P MACHINING TRAINING 1
19 08MAY04 IOMAY04 REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M 19:WA 06:59 02134 128CE 1
SDI600E010 76 CE8 DR-Y ML-Y R-1 P EVALIRESOLUITION OF 1 19 OMAY04 10MAY04 REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M HEAD MEASUREMENTS.
22:00A 06:59 021 5 - 128CE 1
CEI600R019 76 CE8 DR-Y ML-Y R-1 P-026 - PERFORM WELD ON 1
3 10MAY04 10MAY04
[lREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M SLEEVE SAMPLE 07:00 09:59 0213475 - 128CE I
CE1600R023 76 CE8 DR-Y ML-Y R-1 P MACHINING AND 1
4 10MAY04 10MAY04 EREACTOR VESSEL AND ASSEMBLY I ORT3-Y R-M TRAVELER BRIEF (DAY) 07:00 10:59 0213475 - 128CE 1
CE1600R024 76 CE8 DR-Y ML-Y R-1 P ROLL I EXPAND 1
3 10MAY04 10MAY04 IREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M PENETRATION 11:00 13:59 0213475 - 128CE 1
CE1600R025 21 CE8 DR-Y ML-Y R-1 P INSTALL HARD STOP 1
2 10MAY04 10MAY04 IREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M IN PENETRATION AND 0C 14:00 15:59 0213476 - 128CE 1
CE1600R026 21 CE8 DR-Y ML-Y R-1 P INSTALL 212 MACHINE 1
4 10MAY04 10MAY04 EREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M 16:00 19:59 0213476 - 128CE 1
CE1600R022 76 CE8 DR-Y ML-Y R-1 P MACHINING AND 6
4 10MAY04 10MAY04
[OREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M TRAVELER BRIEF (NITE) 18:00 21:59 0213475 - 128CE CE1600R031 21 CE8 DR-Y ML-Y R-1 P MACHINE NOZZLE 1
20 10MAY04 11 MAY04 lllREACTOR VESSEL AND ASSEMBLY I
ORT3-Y R-M BORE 20:00 15:59 0213476 - 128CE 1
CE1600R052 21 CE8 DR-Y ML-Y R-1 P ETCH AND 1
2 11MAY04 11 MAY04 IREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M DETERMINE N DIMENSION 16:00 17:59 0213476 - 128CE 1
EM0216638A 76 EM DR-N ML-N P-001B-M P-1B RE-ASSEMBLY OF 1
60 01MAY04 11MAY04 IREACTOR COOLANT PUMP MOTOR ORT3-N R-M MOTOR 17:OOA 23:59 0301756 128EM 1
EM0215225 76 EM DR-N ML-N W-004A-M PERFORM MCE W-004A-M 1
4 09MAY04 09MAY04
[]CONTAINMENT REACTOR CAVITY COOUNG FAN MOTOR ORT3-N R-M (1B52-317M11B-31) 20:00 23:59 0215225 - 128EM 1
EM0215226 76 EM DR-N ML-N W-004B-M PERFORM MCE W-004B-M 1
4 10MAY04 10MAY04
[0CONTAINMENT REACTOR CAVITY COOUNG FAN MOTOR ORT3-N R-M (1B52-318MI/B-31) 00:00 03:59 0215226 - 128EM
-X a _
I IC4.39STK 76 ICS DR-Y ML-Y 1ICP-04.039-1 ICP 4.39-1 GOVERNOR 5
1 06MAY04 09MAY04 H
TURBINE VALVE CAIIBRATIONIFUNCTIONAL TEST OF TRI ORT3-N R-M VALVE STROKE 06:OOA 12:59 0300976 1281C I
IC4.39TEST 76 IC5 DR-N ML-Y IICP-04.039-1 ICP 4.39-1 GOVERNOR/STOP 5
4 09MAY04 09MAY04
]TURBINE VALVE CAUBRATIONlFUNCTIONAL TEST OF TRI ORT3-N R-M VALVE STROKE TEST 13:00 16:59 0300976 - 1281C 1
01 128-B 82 OPS DR-N ML-N P-015B FILL & VENT P-015B HHSI PP 1
4 09MAY04 09MAY04 PSAFETY INJECTION PUMP ORT3-N R-M PER 01-128 (PARTIAL) 17:00 20:59 0408036 - 1280P 2
AC-381 E-SA OPS DR-N ML-N G-01 ENTERTSAC 3.8I1 EFOR A 1
0 09MAY04 ORT3-N R-M TRAIN DIG OOS 21:00 1280P NMC / WE LT-81 HUMAN ERROR RISK BARCHART
__________________________FL-S1 HUMAN ERROR POTENTIAL O~favr yses.I~PBNP U1 Refueling 28 Outage O-Prlrnavera Systems, Inc.
Run Date 09MAY04 13:43 Work Activity Risk Assignment I
U ACT WO GRP HPE EQUIPMENT Activity Cal DUR START FINISH MAY ID ST RISK DescrIption ID 21j 0.6 1
OP0408036 82 OPS DR-N ML-N P-015B P-15B PMT PER IT-01A 1
4 09MAY04 10MAY04 ESAFETY INJECTION PUMP ORT3-N R-M 21:00 00:59 0408036 - 1280P 1
SOP-141B OPS DR-N ML-N B-41 DE-ENERGIZE 1B-41 PER 6
2 09MAY04 09MAY04 O
I ORT3-N R-M 1-SOP-480-B02 22:00 23:59 1280P I
IT-530D 77 OPS DR-N ML-N O-IT-0530D LRPM & PIGGYBACK TEST 1
8 10MAY04 10MAY04 WLRPM PROGRAM TRAIN B HHSI AND RHR PIGGYBACK TEST ORT3-N R-M OF TRAIN B SI 01:00 08:59 0215917 - 1280P 1
SOP-B41C OPS DR-N ML-N B-41 RE-ENERGIZE 18-41 PER 6
2 10MAY04 10MAY04 0
ORT3-N R-M 1-SOP-480-B02 01:00 02:59 1280P I
IT-530C 77 OPS DR-N ML-N O-IT-0530C LRPM & PIGGYBACK TEST 1
8 11 MAY04 11 MAY04 LRPM PROGRAM TRAIN A HHSI AND RHR PIGGYBACK TE ORT3-N R-M OF TRAIN A SI 03:00 10:59 0215916 - 1280P NMC WE LT-81 HUMAN ERROR RISK BARCHART PBNP U._1 Refueling 28 Outage FL-81 HUMAN ERROR POTENTIAL O Primavera Systems. Inc.
after 09MAY04 12:00 I
U1R28 WORKING SCHEDULE I
after 09MAY04 12:00 U
ID RESP WO ECHD DESCRIPTION RD ES EF RISK MF Sun 9 MAY TUQ 11 I
I I
I ST 112,14,16I1JR2O221 0, 2.4, 6. 8.101 Z14.16.1a2o 2210.2. 4. 6. 8.10112.14,16.1 C; Flxi2 w
fii m
1 0
EMPFOR3A ADM MEETING EMPLOYEE FORUM 2
11MAY04 11MAY04 189 EMPFOR3A LOYEE FOR 08:00 09-.59 2
0 EMPFOR3B ADM MEETING EMPLOYEE FORUM 2
11MAY04 11MAY04 187 EMPFOR3S EH VEL FOR 10-00 11:59
~E S 1 l
zvll 3
1 A015127 APM 76 X-01-A INSPECT CAL AND SET 16I 09MAY04 11MAY04 DR-N ML-N 72 Ao1 51271NSPEC-CALANODSET X-O -A X-01-A 1200 09.59 ORT3-N R-N
-mMAIN POWER' 4
1 AP0216539 APM 76 TG-01-VARM PERFORM RETEST FOR 4 11MAY04 11MAY04 DR-N ML-N 68 AP0 16539 PERFORM RlTEST FOR T-MOD dw52 REMOVAL T-MOD 02-052 REMOVAL 08:00 11:59 ORT3-N R-N ITt rO1 TURBINE GEN RATOR OUTPUTV RMETER0216539 5
1 AP0215133 APM 76 TG-01-G GENERATOR METERS 16 11MAY04 12MAY04 DR-N ML-N 0
02151 33GENERA ORMETERSON C CAUBRATION ON C-01 CALIBRATION 08:00 14:59 ORT3-N R-N ELECTRICAL G ERATOR0215133 6
1 AP0215119 APR 76 A-OB 1A-O CALIBRATE 5
07MAY04 09MAY04 DR-N ML-N 117 Apo, 91A-6 CQ LRATE NON-TE H SPEC RELAYS NON-TECH SPEC 09:00A 16:59 ORT3-N R-N M
4.16KIBUS SWITCHG l(SAFEGUARDS)0 15119 7
1 AP0303688 APR 76 A-41 CALIBRATE IA-01 80 10MAY04 18MAY04 DR-N ML-N 217 AP0303688 RATE IA-01 N N-TECH SPEC RE YS NON-TECH SPEC 08:00-15:59 ORT3-N R-N 030368Sf 8
1 AP0215126 APR 76 F52-122 TRIPF52-122 FROM 5
11MAY04 11MAY04 DR-NML-N 0
21512jTRIP F52 122 FROMPROTECTVE RELAYING PROTECTIVE RELAYING 08:00-1259 ORT3-N R-N TG-01 OUTPUT REAXER0215126 TGIEAERO 12 1kd S*
mia_
9 1
AP0215100A APS 87 F89-122B STROKE F89-122B 1
1 1MAY04 11 MAY04 DR-N ML-N 379 _AP215 SThOKE P89-DURING TAGt ING EVOLUTIO DURINGTAGGING 14:00 14:59 ORT3-N R-N TG I OUTPUT MOTOR ZED DISCONNECT 2151001 10 1 APSGNDOUT APS X-01 APPLETON REMOVE 1
11MAY04 11MAY04 ORN ML-N 0
APSGNO TAPPLETON REM VE GROUNDS FO MAIN GROUNDS FOR MAIN 14:00 14:59 ORT3-N R-N 11 1
BM0300101 BMS 77 RE-PC46.1 VERIFYRTOAS I
11MAY04 11MAY04 191 BM0300101VEFYRTOAS LTEDBYPPCS CALCULATED BY PPCS 07:00 07:59 03001011 A METRIC 12 2
BM0300122 BMS 77 RE-PC46.1 VERIFYRTOAS 1
11MAY04 11MAY04 191 BM0300122VEF IFYRTOASCAL TEBYPPCS CALCULATED BY PPCS 07:00-07:59 03001221 ORIMETRIC 13 0
CE307011SS CEl 78 D-105 PRE-JOBBRIEFD-105 4
10MAY04 10MAY04 4
CE307011SSP*
JOBBRIEFD-105 CEMENT
. REPLACEMENT 07:00-10:59 0307011 1I25VDCSTATICN BATTERY 14 0
CE0405897A CE 76 D-106 PRE-STAGEEQUIPMENT 8
10MAY04 10MAY04 192 CE0405897A AGEEQUJPME FORD-106CELL EPLACEME FORD-106CELL 07:00' 14:59 0405897 125V DC TATON BATTERY 15 0
CE0310577 CE 76 Z-065A Z-M5A INSTALL MR 80 10MAY04 21MAY04 120 CE031os77 IRSTAL MR34 03-044 07:00' 14:59 MAN OLE
- 103105771 l
16 0
CE0311772 CE 76 Z-065A Z-5A INSTALL HEAT 80 10MAY04 21MAY04 0
CE03117 INSTALL HEAT CEMRo3-044 C
TRACE - MR 03-044 07:00 14:59 l
MAW OLE
- 103 177 Run Date 09MAY04 13:391 LT-03 STANDARD PUBLICATION Sheet 1 of 23 O Primavera Systems, Inc.
I FL-03 Execution Publication Set I
after 09MAY04 12:00 I
U1R28 WORKING SCHEDULE I
after O9MA Y04 12:00 to CEO,307011A RESPI WO EQID DESCRIPTION RD ES EF RISK MF Stm 9 MAY Mon lI T'e 1l 9 2.4 A. A.
.1f119.14.il,20,22 0(. 2.4.
A.8
.10i124.1 ST 12,14,RI 7° 0 CE 76 D-105 PRE-STAGE EQUIPMENTI 8 I 11MAY041 11MAY04 FOR D.105 07:00, 14:59 REPL ACEMENT 184 18 0
CE30701 BB CE 76
.D105 PRE-COAT 16 11MAY04 12MAY04 76 11INTERCONNECTING 07 00 I 14:59 B3USWORKD 105
.ft I rc.
ea rc 7R E1n
-i C7C
-e
-^
hA
-l^n -nAn -n,,-.,
CE03070 CE307O11BBPF lAPR-SAGEECHt 25V DC STATION BU E-COAT INTERCON 25V DC STATION Bi CEO' 1PMENT FOR D-10!
TTERY0307011I lECTING BUSWOR xTERYO307OiIE 05897 Dl 06 REPIJ REPLACEMEN7 (D.105(SPARE)
CE BATT CELLS I u
%tr to L.1 IUo FML^1 D'I I CELLS INSPECT CRIB. INSTALL BUOYS AND FISH Z4 2
24 I
MmAT U%4 I I3IVVAIU%
07:00 14:59 U
75v lURt.IAnIIJN UI I TTCYU4U1X8S7 20 0
CLEOU30641 CE44CGATR CE1 76 INTAKE CRI IST-SISI 05APR04 10.00A 12MAYO4 12:59 DR-Y ML-Y ORTSY R-N DR-Y ML.Y ORT3-Y R-N 264 CEt010801 iNsPEct CRIB NSALLB OYS AND FISH I
m 21 1
GE3 1 77 REMINSULFORFAC 11201 04APR04 1 19MAY04 PROG - CTMT44 FT GENi I
16:OOA 14:59 AREA I
I I
cCE44kGATRRREM I4SUL FOR FAC PRO)3 - CTMT44 FT GE4 AREA I,_
I
~ I I
^-otr t
I r- -
s --- T.I ZZ 1
I..zo I "A II CE3 I 7II IST-SISI REINSULATE-FAC I 10 I 28APR04 10MAY04 PROG -TRB HALL 26FT 09.OOA 1
16:59 GEN ARFA l _
DR-Y ML-Y ORTS-Y R-N T
152 CEtGA-REINSULATE - FAC PROG lRB HALL26 Rl (AREA v.^nmnsnvlmc-n.^
slc--.^
_:>ew MvANT IN tSvlbc sNbrtv I rVN l
l l
l z _
-+-1 I----
LTL I-7.-t 1
e Tj!1 CE44 I TAIRX I E I 77 t I lTCbo I 1;> I l41A1 REM INSUL FOR FAG I 10 01MAY04 I 10MAY04 PROG -TRB HALL 44 FT 10:00A 16:59 GEN AREA DR-Y ML-Y ORT3-Y R-N 390 CE4 IRENI FRNARE C:E4jTGTRX REM ~ SUL FOR FAC BHL44F GEN AREA
.f *rE.I'm.,I
_V.-J__SC nARY INSERVICE-ISPFrCT1-n1 C II Z4 I
e3uIuA II IV (a
1 -U1 *T
, i 4
.^e dWm^Ts I ^e 70 l
TP "4
ENCAPSULATE INSULATION ON HP TURBINE COVER 10 A
01MAY04 10MAY04 12:OOA 15:59 DR-Y ML-Y ORT3-Y R-N 230 ESJ 100nENCAPS'ILATE INSlAT1O OHPTURBINE Cf VER
........... 1-H I
G HIGH PRESSURE TURBINI -0302153
_t I.
m TI__-
-_i
.I Z.5 1
QIzSbOHII
'7 ISITSISI REINSULAT. -AC 7I 2 I 04MAY04 I 14MAY04 PROG -TURB HALL 26 1 20:OOA 14:59 FTOVERHD DR-Y ML-Y ORT3-Y R-N 328 E4OHTI REINSt ATE -FAC PROC.
H F C mm a
i -
i -
11 I
I I
I r
Zb I I
%lt44 I U^ I I tw I
CE4 77 IST-SISI IST-SISI REINSULATE - FAC PROG-TRBHALL44 FT GEN AREA zi 10MAY04 11MAY04 13:00-19:59 DR-Y ML-Y ORT3-Y R-N DR-Y ML-Y ORT3-Y R-N 231 3
361 CE44TGATa:
REINSUAT.
POG. TRB HALL FT GEN AREA as3636 27 1 1 CE26TOHSR REMSCAFF-FACPROGI 23 1 01MAY04 11MAY04
-TURBHALL26FT I
I 09:00A I 09:59 OVERHD I
I I
HAL 26 FT VERHD
._=&DS
_~AF M
HAL 2FT H
I O1IIlSECONDARY I
-R I.
I-_7R D IC -
O I -
g l KA-a.
I I -
I I--
I
.l V
t
_V 40 I
I LEjl lOlom
%lt4.
o' ru-0L,4LqMS REMOVE SCAFFOLDINGl 3 105MAY04 IO 1MAY04 FOR 1FD-2543A 1000A 09.59 DR-Y ML-Y ORT3-Y R-N 257 CI
- E9 67SRREMoC E SCAFFOLDING R IFDo253A l_HX-19B1 LP FWH:
-A-CAYIC
{.
e I~ -
6 A'
-t SVA S V -- V _t 29 1 1 CE08TOHSR I CE4 77 IST-SISI REMOVE SCAFF. FACI 32 05MAY04 11MAY04 PROG -TURB HALL8 FT I 10.0aA 22.59 OVFRHD)
CEOrONSRREMO+ESCAFF-FACb HALL 8 FL DRAIN TO HX-17e t OVERHD CONTROL UD-T ML-Y ORT3-Y R-N I
I U 1I rn t-Cd71R1RAED rCA 7R ecrS DACC DC&EC crArcrS mAir:
si rlRiJAVnS SIAVI\\A nDV j1 _V 4q 76 ISOL DHME R'MOVE SCAFFOLDING 8 06AMY04 10MAY04 DR-Y ML.Y JUI I I U~U1tSUAKIG.
75 ISOL PHASE IREMOVE SCAFFOLDING I 8 FOR ISOL PHASE BUS DUCT 06MY04 18.00A 1MAY045 DR-Y ML-Y 14:59 jORT3-Y R-N 153 :E2 5 164SRREMI4kE SCAFFOLDING I
_I 31 1
CE-871A-SR CE4 Sl400871A-REMOVE SCAFFOLDING 5
10MAY04 10MAYD4 DR-Y ML-Y 156 TO REMOVE TAG 0700 t 11:59 ORT3.Y R-N RH-715A 32 1
CE214027SR CE4 82 CS-00476 REMOVE SCAFFOLDING 5
10MAY04 10MAY04 OR-Y ML-Y 255 FOR CS-476 07:00 11:59 ORT3-Y R-N I-r-.
cb r -
r
-r
-- ~e A------
r
-o v ---
--- sn CE-871A.SRREm CE214O27SRRE 02140270 CE212642SRRE 02126420 IOR ISOL PHASE BI
_SMOL PH)
WOVE SCAFFOLD9 WOVEi SCFFOlD lHX-1B SG FE WOVE SCAFFOLDRI HX-17AL S DUCT 3E DUCT0216164 I TO REMOVE TAG 3 FOR CS-476 MDWATER REGULA 3 FOR FD-225A I FWH IA LC-2505L RH-TISA rOR CONTROL YDIER ISOLATIC 33 1 I CE212642SR ICE4 76 FD-00225A REMOVE SCAFFOLDING FOR FD-225A 8
10MAY04 07.00 1UMAY04 14:59 UD-T ML-Y ORT3XY RN
_ _* _I 2
Run Date 09MAY04 13:391 LT-03 STANDARD PUBLICATION Sheet 2 of 23 Prinmra Sstems, Inc.
I FL.03 Execution Publication Set F
after 09MAY04 12:00 I
U1R28 WORKING SCHEDULE I
after O9MA Y04 12:00
.1n 17.11.1 I 3 CE214031SR CE4 82 CV-00257 IREMOVE SCAFFOLDING 8 I 10MAY04 10MAY04 DR-Y ML-Y FOR CV-257 j
07:00 14:59 1 ORT3rY R-N 153 35 1
CE202527SR CE4 76 B-42 REMOVE SCAFFOLDING 20 10MAY04 11MAY04 DR-Y ML-Y 244 FOR 1B-42 07:00 10:59 ORT3-Y R-N 36 1 CE408152SI CE4 71 SC-00955-O BUILD SCAFFOLDING 8
10MAY04 10MAY04 C
FOR SC-955- 0 08:00-15:59 CE214031SRRE 0214031E CE202527SRRE 02025273 CE408152SIE 0408152 CE4(
ROVE SCAFFOLDII 1I-1T-4 VCT AOVE SCAFFOLDtl 1O¶11Z14,16,1 8,20.221 01 2. 4..6,8,10I1214,16,1 x FOR CV-257 IELIEFTOTT-AC I 3FOR 1B-42 VCS HUT
__ __=
=
=
37 1
CE407589SR ICE4 76 T-026 REMOVE SCAFFOLDING AT SLOWDOWN TANK r-02M - SD TANK PIPING INPINGMENT PLATE 5
I 8
11MAY04 11MAY04 I DR-Y ML-Y 07:00 11:59 ORT3-Y R-N 21E UtLD SCAFFOLDIN RC HOI 7589SRREMOVE S BLOWDOUI SIPINGMENT PLATI BRI t
FOR SC-955-0 LEG SAMPLE ISOL AFFOLDtG AT BI ITANK0407589Y REPAIR YN TANK0407589 zMS 480V MOTOF TION OPERATC YWDOWN TANW 38 CEU407589C CE5 7B T-026 07MAY04 10MAY04 DR-Y ML-Y 07O0A 14:59 ORT3-Y R-N C E04&7589CT-026{1D TANK PIPING I I
~m~mmI a,
=
) L~JV"Ln 39 1 T CE9929774 CE5 77 1 Z
INSTALLUMOD 40 10MAY04 14MAY04 1 DR-Y ML-Y I 4C I
PLATFORMS 07.00 14:59 ORT3-Y R-N j CE9929T74lN-TALUJMOD PLATFC ai_
9929774E !I
~
40 1 CE0407589B I CES 76 T-026 CLOSEOUT BD TANK FOLLOWING REPAIRS SEC SUPPORT MR 99-011-B 20 11MAY04 12MAY04 DR-Y ML-Y 07:00 0259 ORT3-Y R-N C
cIE 75 8 9BCLOSE( UT BO TANK FOLL YWING REPAIRt T
RI-OWnoWATANKna47673E 411 0 CE0210988 CE6 77 SEC 24 05APR04 12MAY04 DR-N ML-N 07:00A 14:59 ORT3-N R-N 176 E0m09886SEC SUPPORT MR 99g011 I-U - - - -
I I
I 421 0 CE0210989 CE6 76 SEC SEC. INSTALL NEW EQUIP MR 9901-E 24 05APR04 I 12MAY04 I DR-N ML-N 08:00A 14:59 ORT3-N R-N 176 E10989S EC IN 4TALLEWU AR99-01U E
_. I 43 1
CE0210990 C
76 SEC SEC REM ABANDONED12 03MAY04 10MAY04 DR-N ML-N 148 EQUIPJMRT99-01i F
081A 10:59 ORT3-N R-N 44 1
CEI600R051 CE 76 R.1 P-26-TRAINWELDERSJ 19 10MAY04 10MAY04 DR-YML-Y 786 lCRAFT SUPPORT 14:00A 06:59 ORT3-Y R-M 45 1
CE1600R021 CE8 76 R-1 P-26-MACHINING N 9
4 08MAY04 10MAY04 DR-Y ML-Y 786 TRAINING B
19 :00A 06:59 ORT3-Y R-M 46 1II SD1600E010 lCE8 l 76 R-1 l
P I 19 l08MAY04 IOMAY04 lDR-Y ML-Y 0
lEVADIRESOLUTION OF l 22.ZOA 06:59 lORT3-YR-M 47 1 lCEIE,0OR019 lC0 l 76 R 1 lP-026 -PERFORM WELDl 3 l 0MAY04 10MAYD4 lDR-Y ML-Y 148 ON SLEEVE SAMPLE 07.W 0959 ORT3-Y R-M 48 1 lCE1600R023 lCE8 76 R 1 P-26 -MACHINING AND 4 1 10MAYC4 10MAY0.4 DR-Y ML-Y 1
T lRAVELER BRIEF PAY)l 07:00 10'59 lORT}-YR-M 49 1 l CE1600R024 CE8 76 R-1 P-26-ROLL/EXPAND 3
10MAY04 10MAY04 DR-Y ML-Y 0
PENETRATION 11:00 13:59 ORT3-YR-M AOMSEC RE ABANDONEDMRgM11'F PTr.7AIU WFt flFRq I c~TAFT U PPORT ii 1
~
~CTOVESSELAN Armm4 P.26 - IIICI4INING TRANIIIG I ASSEMBLY02134 5
.Ftg
- I I i RI LTORVESSa AII1J ASSEMRLY02f2. 4 S nent.P.. -f.
"UIIFqtw IrTnflI Md El ~
I R
d CE160OR019P-C 02134T5fl CE1600RD23 P-2 02134T5E CEl6OOR' 0213~
CE16R00R2 IF HEAD MEASURE pCTOR VESSEL AN 26 PERFORM WEL IREACTORVESSE 5-MACHINING ANt NREACTOR VESc 12 4P.26.ROLL/EP 175_REACTOR IP-26 INSTALL HA
)213476UREACTI MENTS
)ASSEMBLY02134 DON SLEEVE SAM LAND ASSEMBLY TRAVELER BRIEF EL AND ASSEMBLY
'AND PENETRATIC
/ESSEL AND ASSEI RD STOP IN PENET VESSEL AND AS LnE
~DAY)
N IBLY -
RATION AND QC 3EMBLY
_, _c 50 11 CE1600R025 I CES l 21 R.1 P.26 - INSTALL HARD STOP IN PENETRATION 2
10MAY04 10MAY041 DR-Y ML-Y 14:00 15:59 ORT3-Y R-M a
L I
I Run Date 09MAY04 13:39l LT-03 STANDARD PUBLICATION Sheet 3 of 23 C Primavera Systems, Inc.
I FL-03 Execution Publication Set I
affer O9MA Y04 12:00 I
U1R28 WORKING SCHEDULE.1 after 09MAY04 12:00 U Iu ID CEI600026 RESPI WO l ST ECD DESCRtIFON RD1 lES I
EF R15K MF suM 9 I
RMla0 I
Tim 11 I 1 51 CE8 21.
R-1 P-268-INSTALL212 4
MACHINE 10MAY04 10MAY04 DR-Y ML-Y 16:00 19:59 ORT3-Y R-M 0
REACTOI Dm^r-
- 9. A.
- 4.
R.1(919.1A1 In.9.4. R.
52 1
CEI600R022 CE8 76 R-1 P MACHIMNG AND 4
10MAY04 10MAY04 DR-Y ML-Y 355 TRAVELER BRIEF (NITE) 18:00 21:59 ORT3-Y R-M 53 1
CEI600R031 CE8 21 R-1 P-26-MACHINE NOZZLE 20 10MAY04 11MAY04 DR-Y ML-Y BORE 20:00 15:59 ORT3-Y R-M 54 1
CE1600R052 CE8 21 R-1 P ETCH AND 2
11MAY04 11MAY04 DR-Y ML-Y 0
DETERMINE N 16:00 17:59 ORT3-YR-M 55 1
CH0300430 CH 77 CHEM-SAMPL RCS GROSS ACTMTY 6
10MAY04 10MAY04 194 SR 3.04.16.01 07_00o 12.59 56 1
CH0300417 CH 77 CHEM-SAMPL RCS FL TSR 3.4.5.3 8
10MAY04 10MAY04 192 07:00 14:59 57 2
CH0300540 CH 77 CHEM-SAMPL RCS FL TSR 3.4.5.3 8
10MAY04 10MAY04 192 07:00 14:59 58 0
CH0300198 CH 77 CHEM-SAMPL BAST BORON TSR 40 10MAY04 14MAY04 160 3.5.1.2 07:00' 14:59 59 1
CH0300361 CH 77 CHEM-SAMPL RCS CL TSR 3A.52 40 10MAY04 14MAY04 160 07:00 14:59 60 1
CH0300374 CH 77 CHEM-SAMPL RCS DO TSR 3.4.5.1 40 10MAY04 14MAY04 160 07:00 14:59 61 1
CH0300388 CH 77 CHEM-SAMP SGBDFO GAMMA SCAN 40 10MAY04 14MAY04 160 07:00 14:59 62 1
CH0300404 CH 77 CHEM-SAMPL RCS BORON SR 3.9.1.1 40 10MAY04 14MAY04 160 07.0 14:59 63 1
CH0300443 CH 77 CHEMSAML RE-229 ISOTOPIC 40 10MAY04 14MAY04 160 07:00 14:59 64 2
CH0300484 CH 77 CHEM-SAMPL RCS BORON SR 3.9.1.1 40 10MAY04 14MAY04 160 07:00 14:59 65 2
CH0300501 CH 77 CHEM-SAMPL RCS CL TSR 3.452 40 10MAY04 14MAY04 160 07:00-14:59 66 2
CH0300514*
CH 77 CHEM-SAMPL RCS DO TSR 3.4.5.1 40 10MAY04 14MAY04 160 07:00 14:59 67 2 CH0300527 CH 77 CHESAM SGDFO GAMMA SCAN 40 10MAY04 14MAY04 160 07:00 14:59 CE16 VESSELAND ASSE FlD0I=eCM AWN~ A, EI60R026SP 2 6 -
0213476F
)0R022P 26 - MACH MBLY0213475M CEI600R031 P STALL212 MACH11F EACTORVESSEL A iNING AND TRAVEl
.26. MACHINE NOZ OD ASSEMBLY ER BRIEF (NITE LE BORE N D'ENSIOt
-Y0213476U I
I i
SSEMBLY021 347611I
-I I--
u C;:^N#
Cg0ORE52A26 CTO AND DETERMINI REACTOR V5SSEL AND ASSEME CH0300430 RCl GROSS AClVTY 0300430 MISC CHEMI CH0300417RC FL TSR 3.4.5.3 0300417 MISC CHE CH030054 RC FL TSR 3.4.5.3 0300540 MISC CHI CH0300195 BORON TSR 3.5 0300198 CH0300361 RC CL TSR 3.4.5.2 0300361 CH0300374RC DO TSR 3A.5.1 SR 3.04.16.01
'TRY SAMPUNG
.MISTRY SAMPUNC TMISTRY SAMPUNC I>2
-I--
CI" CI" CI" CI" C11-CI" C!,
.Cl-0300374 10300388SGOFO GAMMA SCA 0300388_
0300404 10300443 SOTOP l
_I 0300443 t0300484RC BORON SR 3.9.1.1 0300384 Io300501RC CL TSR3.4.52 I.I 103 0 05 1 4RC DO TSR 3A.5.1 0300514 10300527 SODG GAMMASCA I 0300527 m__
10300553 RE229 ISOTOPIC 0300553 68 2
CH0300553 CH 77 CHEM-SAMPL RE-2291SOTOPIC 40 10MAY04 14MAY04 07:00a 14:59 160 Run Date 09MAY04 13:391 LT-03 STANDARD PUBLICATiON Sheet 4 of 23 e Primavera Systems, Inc.
I FL.03 Execution Publication Set l
after 09MAY04 12:00 U1R28 WORKING SCHEDULE after 09MAY04 12:00 MAY ID RESPI WO EQID DESCRIPTION RD ES EF RISK ST 69 1 1 l CH0300453 CH E
EEP 77 76 CHIEMSAMPLIRCS DOSE EQUIVALENT1 1-131 a
11MAY04 11MAY04 07:00' 12:59 186 123 70 I
EE0302137 EM0216638A P-058 P5 -POST MAINTENANCE 1
11MAY041 11MAY041 DR-Y ML-YI 07:00' 07:59 ORT3-Y R-N 71 11 EM 76 P-001B-M P-1B RE-ASSEMBLY OF 60 010MAY04 11MAY04 DR-N ML-N I MOTOR 17.00A 23:59 ORT3-N R-M S2n 9 14 Mon 10 2
T4 i 3,l1il2,14,16,18,2022lO.2. 46, 6§8,lall4,l6,1&20,221O. 2.4,6, 8,1012,14,16,I CHO 04 53 RCSDoSEE IVALENTI-131 M SCCHEMISTRYAPLJNG0300453 EE03 2 137P-058 POST NANCE VIBTION CRECK HYDR ENSIDESEALO PUMP03021137I EMO 16MAPA1B ASSEMBLYOFM TOR EMO 15241 RMP 93 8, DS BREAKER NTENANCE 1
TTG-4 TG EXC I FIELD CIRC 341P2SA PUMP END MOT R BEARING LEAKG STEAM ENERATOR EED UMP MOTOR 0400 b9 0 48 2 1P-02 BREAKER MATA NCE 1200-40 (
4.1 6 KVlI2AMP VACUUM BRE R030U72 1
REPLACE 0
a 72 1
EM0215241 EM 76 4111E02 RMP93 M.DS-II 14 06MAY04 10MAY04 DR-NML-N 157 BREAKER 19800A 22:59 ORT3-N R-N 73 1
EM0400344 EM 76 P-028A-M 1P-28A-M PUMP END 4
08MAY04 09MAY04 DR-Y ML-Y 10 MOTOR BEARING I 1:OOA 15:59 ORT3-Y R-N 74 0
EM0304872 EM 76 A52-DHVR-1 11P-025A BREAKER 12 09MAY04 10MAY04 DR-N ML-N 0
MAINTENANCE 1200-40 02:OA 00A59 ORT3-N R-N 75 1
EM0212645 EM 76 W-003B-M 1W-3B-M REPLACE 117 09MAY04 14MAY04 DR-N ML-N 0
MOTOR 09:00A 08:59 ORT3-N RN 76 1
EM0216164G EM 76 ISOL PHASE REMOVE GROUNDS ANC 15 09MAY04 10MAYo4 DR-N ML-Y 0
INSTALL BUS DUCT 12:00 0259 ORT3-N R-N 77 1
EM0216170 EM 76 FIRE-BARRI PERFORM RMP 58 FIRE 24 09MAY04 10MAY04 DR-N ML-Y 293 BARRIER 12 00 11:59 ORT3-N R-N 78 1
EM0312035A EM 75 P-028B-M IP-28B-M PERFORM 4
09MAY04 09MAY04 DR-Y ML-Y 0
POST MCE TEST 13:00' 16:59 ORT3-N R-N 79 1
EM0213072 EM 76 CS-02188-S 1 CS-2188-S CONDUIT 4
09MAY04 09MAY04 DR-N ML-N 0
BROKE 20-.00 23:59 ORT3-N R-N 80 1
EM0215225 EM 76 W4004A-M PERFORM MCE 4
09MAY04 09MAY04 DR-N ML-N 0
W-004A-M 20:00' 23:59 ORT3-N R-M 81 0
EM0408178 EM 71 W-190-M W-190-M 10 09MAY04 10MAY04 0
TROUBLESHOOT AND 20:00 05:59 82 0
EM9932300 EM 76 A52-DHVR-1 1200-40 1P-25AIAUX 2
09MAY04 10MAY04 DR-N ML-N O
SWITCH GUARD 23:00 00.59 ORT3-N R-N 83 1
EM0400047 EM 75 B52-7D 1B52-7D PERFORM BKR 1
10MAY04 10MAY04 DR-N ML-N 0
SWAP IN U1R28 00k00 00:59 ORT3-N R-N 84 1
EM0215226 EM 76 W-004B-M PERFORM MCE 4
10MAY04 10MAY04 DR-N ML-N 28 W-004B-M 00:00 03:59 ORT3-N R-M 85 1 EM0407727 EM 71 C-041 C-041INSTALL LOCK 6
10MAY04 10MAY04 DR-N ML-Y c
NUTS ON BUS BAR 0000 05:59 ORT3-N R-N EM0I161 64GREMOIE GROUNDS AND l H!
ISOI PHASE MISALL BUS DUCI DUCT02161164 IER SURVEILLA?
EM0I EM0M 1.6.70PERFOAM RMP 58 FIRE BA tR
_=IDU DADDI 12035Al tP-28 M STEAI EM0213072 1' 02130723 EM0215225P 02152253 EMO408178V 0408178 EM9932 9932:
EM040 040 EM021 021 IEMO4O 040 EM021
-M PERFORM POW I GENERATOR FEEl S-2188-S CONDUf 1P-28B SGFPI
-RFORM MCE W-OC CONTAINMEN
-19044TROUBLESI 0@1200-40 1P-25AJ.
MOE4.16 KV11200 304 71B52M7D PERF pO47EPWRTO IB-5226PERFORM MC 5226=CONTAI r727C-041 INSTALL 727_ROC 5229 W-04A -INSPI MCE TEST PUMP MOTOR031 BROKE IINI RECIRC FLOW 4A-M (1B52.317MW
'REACTOR CAVITY lOOT AND REPAIR WX SWITCH GUAR AMP VACUUM BRE
)RM BKR SWAP IN 1 UNIT 1 TURBINE EW-048M (1B52; WMENT REACTOR C LOCK NUTS ON Bt CTL MG/REACTOR CT AND MAINTAIN LINKS CE 5 IN CONTAINMEN1 2035
)ONTROL SOLENO B-31)
COOLING FAN MOI
'AN kKER U1R28 3LDG MCC 118MB1-31)
AVITY COOLING FA S BAR TRIP BKR SWITCHI FAN AND MOTOR T REACTOR CAVtn 0216170 D
OR MOTOR 1EAR CTL PANEI COOLING FAN.
88 1I EM0215229 EM 76 W-004A W-004A.INSPECTAND MAINTAIN FAN AND 12 10MAY04 10MAY041 DR-N ML-N 00.00' 11:59 ORT3-N R-N 4
A lrm"mr-Ni Run Date 09MAY04 13:391 LT-03 STANDARD PUBLICATION F~t-03' Executioin Pubhlication Seqt I
Sheet 5 of 23 Pdm5 wf vtm Ruqb e.1 W
Wgo Wada TBX llo,! s W d I
after 09MAY04 12:00 U1R28 WORKING SCHEDULE I
after O9MAY04 12:00 U
D lRESPl WO EQID DESCRIPTION RD ES I
EF RISK AF I
MAY I.
I u qIMaST u 1 q
ST I
8,10112,14,16,18.20221 01214161 IlolZl4,l6tl&2(221 012141 6,8 1O1406,11 "I'll EM0216539 I EM 76 IT01VARM IREMOVE TEMTORARY 1 2 METERING TMOD 02.052 107MAY4 I 0MAY4 I DR-N ML-N 0700 08:59 1ORT3-N R-N 11 88 0
EM0305257 EM 77 4.16KV VISUALLY INSPECT 4
10MAY04 10MAY04 DR-N ML-N 782 TRANSFORMERS FOR 07:00.
10:59 ORT3-N R-N 89 0
EM9925005 EM 76 A52-DHVR-3 3000.1 1X02-1A01 CELL I
10MAY04 10MAY04 DR-N ML-N 435 SWITCH INSPECTION 08:00 08:59 ORT3-N R-N 90 0
EM0309137 EM 76 0-106 STATION BATTERY INSP 3
10MAY04 10MAY04 DR-Y ML-Y 4
PER RMP 9046-1 0800 10:59 ORT3-Y R-N 91 0
EM0301792A EM 76 A52-DHVR-3 BKR MAINT. PORTION AT 4 10MAY04 10MAY04 DR-N ML-N CUBICLE (A52-01) 08:00 11 59 ORT3-NR-N 3000-01 92 0
EM0304871 EM 76 A52-DHVR-1 BREAKER 24 10MAY04 11 MAY04 DR-N ML-N 0
MAINTENANCE 1200-42 11:00 10:59 ORT3-N R-N (A52-02) 93 0
EM0304878 EM 76 B52-DB50-0 BREAKER 24 10MAY04 11MAY04 DR-N ML-N 0
MAINTENANCE DB50-001 11:00 10:59 ORT3-N R-N (152-48)
_I 94 0
EM0309073 EM 76 D-105 STATION BATTERY INSP 3 10MAY04 10MAY04 DR-Y ML-Y 770 PER RMP 9046-1 20:00*
22:59 ORT3-Y R-N 95 1 EM0306911 EM 76 TG-01-VARM 1TG-1-VARM READS 8
10MAY04 11MAY04 DR-N ML-N 4
HIGH REPLACE 20:00 03:59 ORT3-N R-N 96 1
EM0215230 EM 76 W-004B METER 1
0 1
4 N
96 E02520 M 6
4)4B W-004B - INSPECT AND 121 10MAY04 1MA0 DR-N ML-N 0
MAINTAIN FAN AND 20-00 07:59 ORT3-N R-N MOTOR 97 1
EM0215246 EM 76 62/A01 CAL AND TEST 62/AO1 6
11MAY04 11MAY04 DR-N ML-N 0
RELAY PER IRMP 08:00 11:59 ORT3-N R-N
_9302-1.
98 0
EM0207564 EM 76 B52-DB50-O IX-11 TO 1B-1 INSP 4
11MAY04 11MAY04 DR-N ML-N 0
INERTIA 07:00 10:59 ORT3-N R-N LATCH(DB 50-48) 99 1
EM9604321A EM 78 FH-CTC-08 FH-CTC-08 PEPLACE 6
11MAY04 11 MAY04 DR-N ML-N 502 CAVITY LGT FIXTURE 07:00 I
12:59 ORT3-N R-N 100 2 EM0305124 EM 76 W-039-M LUBRICATE FAN MOTOR I1 11MAY04 11MAY04 DR-N ML-N 287 08:00W 08:59 ORT3-N R-N 101 0
EM0305205 EM 78 125V STATION TECH SPEC 6
11MAY04 11 MAY04 185 BATTERIESWEEKLY 0800*
1359 102 0 EM0304873 EM 76 A52-DHVR-1 P-028A-BREAKER 24 11MAY04 13MAY04 DR-Y ML-Y 0
MAINTENANCE 1200-34 08.00.
13.59 ORT3-N R-N (A52-05) 103 1
EM0408172 EM 76 MOB-004 MOB-004 4
11MAY04 11MAY04 DR-N ML-N 0
INGANSPICYCL 1500 18:59 ORT3-N R-N EM0216539RE 02165393 EM0305257WV 03052573 EM9925005 3 992so051 EM03091375 03091371 EM0301792AE 03017923 EM0304 0304 EM0304 0304 AOVE TEMPORAR)~
ITG-01 TURBINE G UALLY INSPECTT 4.16 KV SYS ML
)00.1 1X02-IAOI CE 4.16 KVW3000AMPI rATION BATTERY I
- 125V DC STAnC KR MAINT. PORTIC 4.16 KVI3000 171 BREAKER MAID METERING T-MOV NERATOR OUTPr ANSFORMERS FOI TI ANDIOR NON-N(
I SWITCH INSPEC kCUUM BREAKER ISP PER RMP 90460 N BATTERY IAT CUBICLE (A5S AP VACUUM BREA1 rENANCE 1200-42 02-452
'VARMETER MBERED EQUIF nON
.01) 300041
'ER kV202) 4 71 4.16 KVI120Z 78 BREAKER MAICEgB52NAN 178
_48 VOLT DI ER~
EM021S EMO IA-0 EIh 480 VOLT DB-
)REL CONTAINMEU OIL CONDIONER
.M MULTI ANDOR I EM0304 4.16 KVI EM0309073 ON BATTERY INSP 0309073 125V DC STATIC 0306og11 TG-1 VAiHR SHIGH MR 0306911 1TG-01 23jW.04B.INSPE MAtAIN F 02152323 t15246CALAND II62AO RELAY P I BUS TIME DELAY Y0215246M 02075641X 11 TO I I INSP INERTIA iO SWITCHGEAR B EAKER02075643 M960421AFH-CT48 PEPLACE CAVI l TRANSFER CANA UGHT96043211 M0305124LUBRM VAPOR EXTRACTO MOTOR03051241 EM030520sSTATK iN TECH SPEC BAT ON-NUMBERED ED JIPMENT03052)5S 173 P428A - BRE" ER MAINTENANCE 200 AMP VACUUM REAKER0304873I EMI40817 MOB-004 CLEANIN EM0301793 BREAK R MAINTENANCE
- 13. KVr2e0=AMPBREJ PER RMP 904-1 N BATTERY PLACE METER rURBINE GENEF lAN AND MOTOR 1ekrA#.tard n
r HYI Z-26 LUBE 125V SYSTl
.R IRMP 9302-1.
ATCH(DB5048) rY LGT FIXTURE 6TE FAN MOTOR ERIES WEEKLY 1200-34 (A52-O5)
MlINSPICYCUNG W4O8172M IK-2000 (H52-20
<ER0301793N 1041 0 EM0301793 EM 76 H52-HK-200 I BREAKER MAINTENANCE HK-2000 (H52-20) 16 11MAY04 17:00 12MAY04 08:59 DR-N ML-N ORT3-N R-N 29 L
I
.3.
1 1
L I
I Run Date 09MAY04 13:39 LT-03 STANDARD PUBLICATION Sheet 6 of 23 0 Primavera Systems. Inc.
I FL.03 Execution Publication Set I
after 09MAY04 12:00 U1R28 WORKING SCHEDULE I
after O9MAY04 12:00 U
ID RESP WO EOID DESCRIPTION RI)
ES EF RISK MF MAY I
T I
I l§Ul12,14,161&a2O,2210,2,4 46.8.10OZ14,16,18,20,2210. 2.4. 6.8.10112.14.16l1 105 0
EM0405896B EMV 76 W-021B W021B REMOVE 4
09MAY04 09M1AY04 DR-N ML-N 0
E1 W405896W B REMOVEJUMPS R IWP01-12WE-Fil JUMPER !WP 18:00 21:59 ORT3-N R-N 0405896 PAD3 EXI-IAUST S CK FAN 01.128'E-FN 106 0 EM04058810 EMV 76 W-030A W-030A REMOVE 2
09MAY04 09MAY04 DR-N ML-N 0
EM0405881 W-030A REMOVE UMPER PER NWP 1128MEFN JUMPER PER IMP 22:00 23:59 ORT3-N R-N 04051 F-23/F-29 PAB IUST FLTER F
______01-128E-FN 04__-2___2______TFITE F
107 1 EM0403301 EMV 76 5100857A-SI-857A-O PERFORM 10 10MAY04 10MAY04 DR-N ML-N 0
EM0403301 t457A-O PERFOR I STEM LUBE AND l J INSPECTION STEM LUBEAND FBJ 14.00 23:59 ORT3-N R-N
_3301 HX-1ARHR HOUTLETTOP-INSPECTION
_3301*
-Si 108 0 EPCRCOM2 EP EPMP 21 1 EP QUARTERLY 2 DIGIT 3
10MAY04 1OMAY04 19 f-E P
CRCOM2EP ARTERLY2 DIG DIAL SELECT a CO CHE DIAL SELECT & CR 08:0 10-59 COMM CHECK Lei' s
U E
109 1 EP0301910 EPI 77 Ut-CONTAIN INSPECT CTMT AND 24 28APR04 12MAY04 DR-Y ML-Y 96 1910INSPECf CTMTAND FEjATERPENETRA NS FEEDWATER 0800A 10-59 ORT3XY R-N.
G FE 7
TSIS PENETRATIONS 110 1 NG44TFClEV EPI 77 IST-SISI ENG EVAL FOR FAC I
10MY04 10MAY04 DR-Y ML-Y C
NG44TFCIEVE IG EVALFOR FAC RO-TUR8 HALL FTGEN PROG - TURB HALL 44 12:00 12.59 ORT3-Y R-N EV G9EVAECONR LNEVEiNP FTIGENAl FT GEN AREA a
89715EC INSPE N
EEREC LIHTN 0700A-16:59t 1
i_
111 1
FG0212816 FG1 76 CPP-36 1CPP-36 CLEAN RUST 27 04MAY04 1 1 MAY04 DR-Y ML-Y 0
61 CLEANRUSTANPAINT AND PAINT 1800A 16:59 ORT-Y R-N
_l C112 0
FG-LIGHT FGI MISC WALKDOWN OF 50 05MAY04 14MAY04 252 F HTW OF EMERGENC UGHllNG
__EMERGENCY LIGHTING 07.00A 16:59 N OF EMREC LIGTIN 113 0 FG0300155 FG1 77 MISC REMOVE VEGETATION 40 10MAY04 14MAY04 DR-Y ML-Y 160 FG0300155RE OW VEGETATIO IN ISOLATION ZON IN ISOLATION ZONES 07.00' 14:59 ORT3-Y R-N 0300155 114 0 FG0309581 FG1 76 Z-066A Z466A(ETC)SEAL 20 11MAY04 12MAY04 DR-Y ML-Y 0
LEAKSIMANHOLE 08:00 09:59 ORT3-Y R-N
_OrMANH E0309581
.COVERS
=
1 Is~ t@si14[
i FG0300138 FG2 77 IX378B SERViCE HX-3788 SBCC 4 t 1 MAY04 11MAY041 188 C MP RM AC UN COMP RM AC UNIT 07.00 10-9 CCMPJTR ARC0 DON1NI 0003 I I-s 116 0
FG307011A FG3 76
-105 STENCIL MONO-RALS IN 8 11MAY04 11MAY04 184 _
FG 11AASTENCL M IN-DR0I BATRY ROO ID-1I5 BATTERY ROOM 07:00-14:59 25V DC STATION BT TERY30701 117 0 FG307011SI FG3 76 D-105 BUILD SCAFFOLD FOR 16 11MAY04 12MAY04 1786 Fv 30705 1
- SC AFOLDFORD-1ORLC D-105 REPLACEMENT 07:00' 14:59 25V DC STATIONBTTERY037II 118 1 HP7.51.6D HP HP PURGET PURGE VALVE TEST 2
09MAY04 09MAY04 DR-Y ML-Y 4
6OPURGE VETEST(PIP 51.6)
- (HPIP75.
6 130 14:59 ORT3-YR-N EUNIT1 NTAINMENTPURG TRIPTEST 1191 l HP0304253 HP 77 CV{00209 INSPECTVALVEFORBA 4
10MAY04 10MAY04 196 HP0304253 VACT LVE FOR A DEPOSITS DEPOSITS 07:00' 10-59 0304253 IHX-3A/B NON EGEN HX OUTLET ~EEF TO IT-4 Run Date 09MAY04 13:391 LT-03 STANDARD PUBLICATION Sheet 7 of 23 C Primavem Systems, Inc.
I FL.03 Execution Publication Set I
after 09MAY04 12:00 U1R28 WORKING SCHEDULE after 09MAY04 12:00 U
ID RESPl WO ST EQID ICP-02.020 DESCRIPTION ICP 220 RP BLUE CHANNEL ANALOG TEST RD ES RISK MF Sun 2 I
Mmn 10 TIJa 11 MAY 1211 I(2.20BLU IC 76 09MAY04 I 09MAY04 DR-N ML-Y 08iEMA 15:59 ORT3-N R-N C
121 1
IC5.27A IC 76 ICP-05.027 EH LOCK OUT 2
09MAY04 09MAY04 DR-Y ML-Y 446 VERIFICATION 13:00 14:59 ORT3-Y R-N 122 1 IC220YEL IC 76 ICP-OZ020 ICP 2.20 RP YELLOW 8
09MAY04 09MAY04 DR-N ML-Y t
CHANNEL ANALOG 16:00 23:59 ORT3-N R-N TEST 123 2 IC0407744 IC 76 LT-0939 LT-939 DRY LEG DRAIN 3
10MAY04 10MAY04 DR-Y ML-Y 777 CHECK 13:00u 15:59 ORT3-Y R-N 124 0 ICTRNBO8A IC TRAINING ICOJTITPETRAINING. 2 24 11MAY04 13MAY04 DR-Y ML-Y 168 ICTECH'S 07:00lv 14:59
°R`3Y R-N 1 25 1 IC-CV-F&V IC SOP-CV-0031 FILL&6VENT PT-135, 3
11 MAY04 11MAY04 DR-N ML-N 22Z FT-134 & 128 PER 11:00 13:59 O)RT3-N R-N
_SOP-CVu03 1201 1 1IC5.47-1 I CI1 76 ICs5.047 1SECONDARYLEVEL 3819APRt\\41 12MAY0D4 Y DR-Y ML-Y COOLR MD I I S#O1:0A 16:59 ORT3-Y R-N l~~~fo 7
~ ~~~~~Ss,<On2 eseszW A es1sssssen4tA EStAI Ti SIA 3m IC2.
0:
iUICP2.201 POST-R AEN LOCK 0 OELECTRC LICP 220 0817 tP BWE CHANNEL
-FUELING. PRESM IT VERIFICATiON 4-IYDRAUUC OIL SI RP YELLOW CHAN MPOST-REFUE1 ICOA IC-CV-4 lC ANALOG TEST RTUP ANALOG CHK
'STEM (OUTAGE)03 4EL ANALOG TES1 ING, PRESTARTUP 077 LT-939 DRY I 0r7U4T-34A S IC-TRNB08
&VFILL& VENT V
'CS LEUDOWNIPUR NNELTEST030081 D0862
&NALOG CHANNEL EG DRAIN CHECK ACCUMULATOR UE
,IC OJT/TPE TRAM
-135, FT-134 & 128 FICATION FILL & VE 0
- 2, 4. 6. 8 l,121I4,16,18,220I22 0, 2, 4. 6, 8 lilZ14.16,1 rEST VELTRANSMmr NG, 2 ICTECWf
'ER SOP-CV-W0 INTM C5.&1 SECONDAMY LEVEL CONTRO4LERS AND Swrr I
I lzi I I IL(JJUUb
It1 to LL;-UC14 LULZ-14 REvUHBISH 11 UUAPHU4 I3MAYO4 IfD-Y ML-Y 11IOOA 16:59 ORT3-Y R-N C03 I2(9L-C-2514 pEFURBISH m u I
I_-
!128 1 IC0305085 0IC1 76 LS-02376
'1LS-2376 SMALL STEAM 38 19APR04 I 13MAYI 4
DR-Y ML-Y V
C Um LEAKONLVLSW 11 00A 16:59 ORT3-YVRNI 4
12M.A I
-U_4 1
IR-M II.
- S237 SMALL T OLS I
mI IL]I M.Ia3 1'-I (t
llrl-va.uw HIGH PRESSURE d4 UZMAYU4 13MAYLJ4 I9 U-T ML-Y I
08:00A 13:59 ORT3-Y R-N
~L!r~SEC tNDARY HIGH~~
i YS, TEM Ii m m
i i ____________
130 2 1IC0214427 ICI1 7B ICP-OB 022 IREACTOR COAr321 10MAY041 12MAY04 DR-Y ML-Y 330 SYSTREM 0:00 18:59 ORT3-Y RN 131 1
ICZ1801 IC2 7
N ICP2013 NP4ZECAD RXCTRIP 3
O9MAY04 09MAY04 DR-N ML-Y 1
B OPERSBLTNYTESTE 1700 21:59 ORT3-N R-N 132 0 IC0300713 IC2 n7 HP-09306 CLEAN CONTAMINATION 12 10MAY04 12MAY04 DR-Y ML-Y 302 MONITOR 18:00 18:59 ORT3Y R-N 133 1 IC9950761 IC2 76 N-00043 N-43 ECAD CABLE 3
09MAY04 09MAY04 DR-N ML-Y 18 TESTING 19 WD 21:59 ORT3-N R-N 134 0
IC0300711 IC2 77 HP-07736 CLEAN CONTAMINATION 12 10MAY04 1t2MAY04 DR-Y ML-Y 296 MONITOR 01:00 01:59 ORT3-Y R-N 135 o IC030D711 IC2 77 HP-OS T
C73 RCONTAMINATIOG 12 10MAY04 12MAY04 DR-Y MLIY 296 MONITOR L
U1:00 01:59 ORT3-Y R-N 136 2 IC0305580 IC2 7B6 pc PPCS RECONFIGURE, B
IOMAY04 11 MAY04 DR-Y ML-Y 296
_ _MONITOR LAYOUT 1B W0 01:59 ORT3Y R-N IC 2144 42~ATlI YSTEM
=-TRIP CKT TEST C2.11-1 ICP-13008120 0300713CL 0300713n 1C9950761 F 99507611 IC IC I
I I-
- 0 1D1 RX TRIP BKR
- RXTRIPBKRO N CONTAMnNATIOI OPERABITYTES ERABILITYITURBIN MONITOR I
I I
I I
3 ECAD CABLE TE£ INI POWER RANGI 710 CLEAN CON TNG CHANNEL AMINATION MONIT 7 1_CLEAN COAINAT ONMON IR I
c~0 1
1I.
l IC0305580PPC 0305580in C0301009CHEMC 0301009 p RECONFIGURE Mi L
PpcssysO
)NITOR LAYOUT
'EM MULTI ANDI NTROL SYSTEM 1wou 1 u
,%~
ID url-uo.uz 1 flMIlWL P,'ANU VULUM CONTROL SYSTEM lb 1JUMAll4 18:00 1 1 MAYT4 22.59 UD-Y ML-T ORT3-Y R-N U
LLJ.
.L ________________
I_______ L I.......i.......I L
J.
Run Date 09MAY04 13:39l LT-03 STANDARD PUBLICATION FL.Exe euiitinn Puiohathfin 5et I
Sheet 8 of 23 O Primavera Svstpms Inn
@z%.ll A~--V~
wvasv s7I
after 09MAY04 12:00 I
U1R28 WORKING SCHEDULE I
after 09MAY04 12:00 U
ID IRESP WO ECHD DESCRIPON RD ES EF RISK MF Sn MAY ST 119mmi Te1 I
I S I
pi 013a112,14.1116182I2I0221,24.6 68 1011Z14,16.112012210.2.44.618 10i1Z14.t,16 138 1 IC5.50 ICS 76 ICP-05.050 ICP 5.50 SECONDARY 24 28APR04 12MAY04 DR-Y ML-Y 34 C ICP 5.50 SECI NDARY MIDRANG.PRESSURE MIDRANGE PRESSURE 09:OOA 13:59 ORT3-Y R-N I
139 1 IC4,39STK IC5 76 1 ICP-04.03 ICP 4.39-1 GOVERNOR I
06MAY04 09MAY04 DR-Y ML-Y 0 I ITICP 4.39-GOVERNOR VALV E STROKE VALVE STROKE 0_ :0A 12.59 ORT3-N R-M TURBINE VA E CALIBRATIONT JNCTIONAL TEST FTRI0300976 140 1 1IC4.39TEST IC5 76 1ICP-04.03 ICP 4.39-1 4
09MAY04 09MAY04 DR-N ML-Y 0
STICP 4.3 1 GOVERNORISTO VALVE STROKE EST GOVERNORJSTOP 13:00 16:59 ORT3-N R-M ITURB E VALVE CALB ONtFUNCnONAL "EST OFTRIO30097 141 2
IC0301008 ICS 76 ICP-02.001 ICP 21 RP AND SG 5
10MAY04 IOMAY04 DR-Y ML-Y 0
fC03o1008 1 RP AND SG AN kLOG TEST - BLUE ANALOG TEST BLUE 07.00 11:59 ORT3-Y R-N 0301008 REACTOR PR TECTION AND SAF GUARDS ANAL 142 2 IC0400330 IC5 76 PC-00431A 2PC-431AREFURBISH 5
10MAY04 10MAY04 DR-Y ML-Y 195 ICD4oo 33 02P lAREFURBISHI NIT UNIT 07:00 11:59 ORT3-Y R-N 0400330 T-1 PZR PRE 3 HIGH PRESS RE TOR TRIP BIST 143 1 IC0309328E IC5 76 FM-03110 IFM"3110INSTALL 5
11MAY04 11MAY04 DR-YML-Y 0
IC0309328E1FM 3110 INSTALLTRA SDUCERS-2nC TRANSDUCERS - 2nd 06:00.
10.59 ORT3-Y R-N LEFM ELECTR NICS0309328l 144 1
ICTE-3111 IC5 77 TE-03111 TE-31II LEFM FWTEMP 2 11MAY04 11MAY04 DR-Y ML.Y 42 1 TE.3111 TE-3111 LF EMP.
LCE ELEMENI
_T_-REPLACE EEMEN 15 00 16:59 ORT3-Y R-N LEFM FEED TEMI ERATURE EEM 0300956f EU f I
U- _ -_
145 1 IC0406275 ICV 76 MS-02706 1MS-2706. POST 3
04MAY04 09MAY04 DR-Y ML-Y C30 4 6 2 7 51MS270 POST REPACK D AGNOSTIC REPACK DIAGNOSTIC 03.0A 20.59 ORT3-Y R-N HPTURBINE DRAI EXTRACTION OU ETCONTROL.0406 175 F46 I 1ICMS2017 ICV 76 MS-02017-0 MS-2017 MSIV 1
09MAY04 09MAY04 DR-Y ML-Y 58 CM 1 7 MS-2017 SNODIAGNOSTIC DIAGNOSTIC 0800A 12.59 ORT3-N R-N HX-1B SG Hi ADER MAIN STEAM STOP CTL OPER0 00902 147 1 IC0406193 ICV 76 MS-02084 1MS-2084. POST I
09MAY04 09MAY04 DR-Y ML-Y I M
, POST R PACK DIAGNOSTI REPACK DIAGNOSTIC 0900A 12.59 ORT3-Y R-N lHXIB SG PLE ISOLATION C NTROL 148 1 1IC0216334 ICV 78 Sl00844A 1SI-844ASEATLEAKAGE 4
09MAY4 0AY04 DR-N ML-V
.O 021341 SEATLEAKAG POSTDIAGNOSTI POST DIAGNOSTIC 18:00 21:59 ORT3-Y R-N 0216334 T-34ASI ACCUMt ATOR DRAIN TO 16 RCDT 149 1
1IC0300948 ICV 76 Sl-00844A-S-844A DIAGNOSTIC 4
09MAY04 09MAY04 DR-N ML-Y 0
I.:0300948 DIAGNOSTIC C ECK CHECK 18:00 21:59 ORT3-YR-N 0300948 T-34A SACCUMt ATOR DRAIN TO 16 RCDT OPERATC R 150 1
IC0300949 ICV 76 S-00844B-S-844B DIAGNOSTIC 4
09MAY04 09MAY04 DR-N ML-N 0
3009495gS DIAGNOSTIC Ct ECK CHECK 18:00 21:59 ORT3-Y R-N 0300949 T-34B SI ACCUML ATOR DRAIN TO 16 RCDTOPERATC R 1511 1 IC0303382 ICV 76 SC-00953 SC-953 POST MTN 4
10MAY04 10MAY04 DR-Y ML-Y 10 1C03033825C-90 POST MTN DIAGN STIC DIAGNOSTIC 05:00 08:59 ORT3-N R-N 0303382
_ PZR UOUID SPACE SAMPLE CONTAINI IENT ISOLATION 152 1
1C0300922 ICV 76 MS-05958-O MS4958 DIAGNOSTIC 4
10MAY04 10MAY04 DR-Y ML-Y 0
IC030o922MS-!
5S8 DIAGNOSTIC C ECK CHECK 18:00 21:59 ORT3-NR-N 0300922 HX-1A SG BLOW[ OWN ISOLATVOl 153 1
IC408038 ICV 28 MS-05959-O MS-5959-0 AIR LEAK 4
10MAY04 1OMAY04 DR-Y ML-Y 30 fC04080 3 8 AIR LEAK 18:00 21:59 ORT3-Y R-N 0408038 HX-1B SG BLOWE OWN ISOLATIOF 154 1
IC0408152 ICV 71 SC-00955-O SC-955-O. POST 4
11MAY04 11MAY04 DR-Y ML-Y 0
C0403152 5b9 POST MAINTENA EDIAGNOSTIC MAINTENANCE 14:00 17:59 ORT3-Y R-N RC H LEG SAMPLE IS TION OPERATOR 8152 l
155 1
IC0214110 ICV 76 MS-02018 MS-2018 POST 7
11MAY04 11MAY04 DR-Y ML-Y 0
.C021411 0MS-2 1 POST INSPECTi 3N DIAGNOSTiC INSPECTION 16:00.
2259 ORT3-N R-N HX-IA HEADER MAIN S T-AM STOP CONTF X0214110M Run Data 09MAY04 13:391 LT.03 STANDARD PUBLICATION Sheet 9 of 23 C Primavera Systems, Inc.
FL-03 Execution Publication Set I
after 09MAY04 12:00 I
U1R28 WORKING SCHEDULE I
after 09MAY04 12:00
- lU lRESP EQD DESCRIPTION RD ES E-RISK MF MAY 158 1
ICMS2018t ICV 781 MS-02018-0 MS-20OI6MSIV 7
1 1MAY041 11MAY04 DR-VYML-Y dmMISIVSMS201SM~IVDIAGNOSI IDAGNOSTIC 16 00B 22.59 ORT3-N R-N HX-1A ;G HEADER MAIN STEAM STOP CTL OFfR 0300903=
II s I ' li.-II I _
1 _
SNUBBER (SHOP) 06-.00A 10.59 ORT3-N R-N 158 1 MM9933444 MM1 76 W-001C2-A W-1C2-A REPLACE 30 03MAY04 12MAY04 DR-Y ML-Y 0 UM9 33444W1C2 REPLACE ACK T DAMPER BACKDRAFT DAMPER 06 00A 01:59 ORT3-N R-N U
159 1
MM0408185 MM1 71 HS-12 IHS-12REPAIROILLEA 6
11MAY04 11MAY04 308 M04081351St12 F IROILLE 060:0C 11:59 SAFETY I VECTION LINE SN BBER0408185 __
-~
a u
-il,
- ,@2>1'2s m -
U __
160 1 MM0304995 MM2 76 P-0288 P4028B - OVERHAUL 45 30APR04 13MAY04 DR-Y ML-Y C0 M 04995P-028 OVERHAUL MAIN EED PUMP MAIN FEED PUMP 15:00A 12159 ORT3-N R-N U
161 1
MM0407390 MM2 76 P40288 1P-28B INSPECT SPEED 70 01MAY04 15MAY04 DR-Y ML-Y 0
901P-28B NSPECT SPEED INRFSER INCREASER 09.00A 15:59 ORT3-N R-N-NR-N._
162 0 MM0407967 MM2 78 K-26 K-26, AIR UNE LEAK 4
02MAY04 09MAY04 0
Mt IKL26 lINE LEAK 13:00A 15:59 A CHARGING CONPRESSOR 0407967 163 1 MM9919654 MM2 77 P40288 1P-288 STOP OL 15 06MAY04 10MAY04 DR-Y ML-Y 30 O
5-1 2B P OIL LEAKIINSTALL BAFFLE LEAK/INSTALL BAFFLE 05.00A 15:59 ORTN R-N STEAM______
164 1
MM0213111 MM2 76 LO-03617B 1LO-3617B WBEOIL 5
08MAY04 09MAY04 DR-Y ML-Y 65 MO 13111LO36 7BLUBE OILREG LATORLEAKS REGULATOR LEAKS 1 O00A 16:59 ORT3-N R-N P-28 GFP LO PRESSU REGULATING REIIEF 0213111 165 1 MM0405874 MM2 77 SW.04373 ISW-4373 TESTREL 3
09MAY04 09MAYD4 365 UM S
741WA3 F3TEST RELVAI. BY51`13/04.SPARI VALVE BY 5113104 -
06:OOA 14:59 HX-70 U1 -RM COOLING IL OUTLET RELIEF 145S74 166 0 MM0301085 MM2 77 HX-234 CLEAN. INSPECT AND I
09MAY04 09MAY04 DR-YML-V 804 0108CLA INSPECT AND MAI TAIN AC UNIT MAINTAIN AC UNIT 08:OOA 12.59 ORT3-N R-N NSB WATER CHILLER0301085l 167 0 MM0201239 MM2 76 Z-014 RE ROPE INSPECTION 5 09MAY04 09MAY04 C
0M0 01239WIRE E INSPECTION 1100A 16 :59 TURBI BLDG OVERHD CRANE0201239 168 0 MM0301084 MM2 76 HX-240 INSPECT AND MAINTAIN 8
09MAY04 10MAY04 0
M 03010 4IN CT AND MAINT AC UNIT AC UNIT 18:00-01:59 0301084 Sou IHs BLDG AIR CC YDIONING UNIT 169 1 MM03057990A MM2 78 SC-1A SC-lA-CLOSE 6
10MAY04 10MAY04 DR-Y ML-Y 0
MM0305790ASC-l CLOSEWATERE OXES AFTER INS CTION WATERBOXES AFTER 06:00 11:59 ORT3-N R-N 0305790 CONDENSER TIDEAERANG) 170 1 MM0305791A MM2 76 SC-1B SC-1 B - CLOSE 6
10MAY04 10MAY04 DR-Y ML-Y 0
MM0305791ASC1
-CLOSE WATERE OXES AFTER INSP CTION WATERBOXES AFTER 06:00 11:59 ORT3-N R-N 0305791 CONDENSER.DEAERATING) 171 0 MM0201987 MM2 76 W-013A1 INSPECT FAN AND LUBE 8 10MAY04 10MAY04 0
MMG201987 1R5 CTFANAND LUBi BEARINGS BEARINGS 06:00 13:59 0201987 CABLE S ADING ROOM RECIRC FAN 172 0 MM0201682 MM2 76 HX-281C INSPECTAND CLEAN 4
10MAY04 10MAY04 0
MM0201682SCTAND BATIERY ROOM BATTERY ROOM 08:C0 11:59 0201682 D-305t112D-20 S\\MNGISTN BATT CONDENSEF 173 2 MM0301159 MM2 76 P-011A CHANGE OIL, FLUSH 6
10MAY04 10MAY04 DR-NML-N 0
MM030119 GEOILFLUS 8EARINGSAND LEAN BEARINGS ANDCLEAN S.00' 14:59 ORT3-N R-N 0301159 COMPO COOLING WAR PUMP Run Date 09MAY04 13:39w LT-03 STANDARD PUBLICAllON Sheet 10 of 23
_ Primavera Systems, Inc.
I FL.03 Execution Publication Set I
afterO9MAY04 12:00 I
U1R28 WORKING SCHEDULE after O9MAY04 12:00
.lfklml24.l1.l
.2.4.
A. g.1fln12.14.R.1 1741 t MMAA 2663A IMM2 72 FS-02552 FS-2852, REPLACE ADDmONAL PIPING VNFW I IEAI(S 20 1 10MAY04 12MAY04 18:00D 02:59 0
MM030266iAFS2852, REPLAC : ADDITIONAL PIPIOG (NEW LEAKS 03026632 I
I I
\\'
1 I
I 175 0 MM0201265 MM2 76 Z-015 WRE ROPE INSPECTiON41t 1 MAY04 11 MAY04 I 06:00.0959 n70 a_
I
.c II PRIMARI MM0309581 6
- AUXYLARY BLDGC RODERSON CRAM MANH
!M0201265 WIRE RI RANE0201265W SUPPORT FOR MA
)LE #N6A03095811 E INSPECT1O
".In u
MM----~
I M"l/l ID 76 ILA)DOM DNWU~tK.Jr4 LA¶JNm I dU I IMA).UI4 IlMAYTU4 SUPPORT FOR 08:00 09:59 MANHOLE COVERS 554 1771 1 MM0213109 IWV CSOv0038C 1CS--0XJO38 BODY TO I28 I 19APR04 I 13MAYD4 I DR-Y ML-Y BONNET LEAK 09:00A 07:59 ORT3-N R-N a AM01131091C-0*438C BODYTO BONNET LEAK I
I I
-I I
178 1 MM0214110 MUV 76 MS-02018 MS-2018-OPEN&
52 03MAY04 11MAY04 DR-YML-Y 0.
INSPECT VALVE -
22:00A 15:59 ORT3-N R-N
________ lRMP9309-1
.___D 179 1
MM0303382 MMV 76 SC-00953 SC-953 - LEAKS BY, 17 04MAY04 10MAY04 DR-Y ML-Y 0
REPLACE VALVE 0900A 04:59 ORT3-N R-N 180 1
MM0214035 MMV 76 CW FLUSH CW SYSTEM AND 28 10MAY04 13MAY04 DR-YML-Y 0
CLEAN/INSPECT NASH 07:00 07:59 ORT3-N R-N
_ _______QFLOAT VAL 181 I
MM0214023A MMV 82 AF-00104 AF-104, CHECK BONNET 2 10MAY04 10MAY04 333 TORQUE 09:00-10:59 I
MM0408152 MMV 71 SC-00955-0 SC-955-0. REPAIR 20 10MAY04 11MAY04 T0 OPERATOR 16:00 11:59 I A1n3 I
M8o(nVRA IMMVI 7R R.a4O SAIM Tr crikl 1
Cf10 I
n R
.AAA
- -A a
mMls41joMS-201 -OPEN & INSPEC+VALVE-RMP93 HX-DinUSC-953 [ LEAKS BY. REPILCE VALVE WMAI 1 wmir
- oLA, e
I em CAIRJ F PfUTkAIflKlAW t :
MM0214O35FLUt 0214035j MM0214023A 0214023 L
MMa F
I CW SYSTEM AN CLEANANSPECT I V
kSI tATION SH FLOAT VAL irn m -
mm WF104, CHECKBC
- P-38B AFP DISC UM0AnlRIS"C95S NNETTORQUE 8ARGE TO 1HX-1B
). REPAIR OPERAT G CHECK DR 040815_
RC HOT U mmv I
Iu LEAKING BY. CONT.
REPAIR.
07:00 [ 09:59 v
303393ASC-"B -' FALVE LEAKING 14 CONT. REPAIF i_
^^^-
__._1 L RZR Iin
_z AUpi C O~NmTAINMENT ii ATION 03033S31 1
18411 NG44CFC1ND NDE 77 IST-SISI NDE FOR FAC PROG. I 24 1 2APR4 I 12MAY04 I DR-Y ML.Y 1 CONTAINMENT44 FT l l 08.00A 1059 l ORT3-Y R-N I GEN AREA I
I I
64 NG4kFCINDNOcE OR FAC PROG - C(0NTAINMENT44 FTOEN AREA 1
I-I I-I I. I 1-1-
I.. __ I -
I...
i I
I tl-U.'J ILwU NUt l II Ul-'wUNIPJN VISUAL INSPECTION OF 76 1 30APR04 I 1MAY04 DR-Y ML-Y I
CTMULINER PLATE I
I 08:00A l
12:59 ORT-Y R-N I 44 EPjlmg VISUAL {NSPECT1ON OFC i
amp urn I
mm 1861 1 l NG44TFC1ND I NDE l
77 1
IAT
_1_1 Ir a ai0101 NDE FOR FAC PROG-1 5 03MAY04 10MAY04 I DR-Y ML-Y TRB HAlL 44 FTGEN 0900A 11:59 ORT3-Y R-N APPAI 0 NG4TFClNDNDEilOaR FAC PR0G.T D
HALFGEN bREA i
m U
Q~f-(#MnAOV lICC~4IE.~ ltMCCt'f I IU nilft46QVl 187 1 ND0407589B NDE 76 T-026 T-026 - NDE I 10 10MAY04 11MAY04 DR-YML-Y 0
RADIOGRAPHY OF 17.0 02.59 ORT3-Y R-N PIPING 188 1 EP0408043 NOE 77 Sl-00891A 1Sl-89tAPERFRT 3
11MAY04 11MAY04 0
CHECK VALVE4U1R28 17:00' 19:59 189 1 EP0408044 NDE 77 SI-00891B 15-891BPERFRT 3
11MAY04 11MAY04 97 CHECK VALVE -U1R28 17:00 19:59 L0l; -:
I 3 RIg 190 0 OP0301254 OPM 1 77 O-PC.075.1 PERFORM 32 09MAY04 10MAY04 DR-N ML-N 773 p MAINTENANCE ON THE 1Z.00c 19:59 ORT3-N R-N I_
SC8A I
ie I
RD04O75M9BT-M.
0407673_
EPW4&8X43l 1S4 MP DISCH RECIRC EP0408O44IS18 MAP DISCH RECIRC I
NOE /RADIOGRAF q
I P-15A SI Pt P-15B SI Pt DLuvvLA.
1A PERF RT CHEC ro SI TEST LINE Ca-IB PERF RT CHEC 0O SI TEST LINE Ca KY OF PIPING NN TANK KVALVE4J1R2E ECK0438043E C VALVE.UIR22 EcK008044f NCEOFTHESC 12 54RFOM MAINTENANCE ON THE SCBA PRIO--IC MAINTENR
_1 A
Run Dnte 09MAY04 13:39l LT-03 STANDARD PUBLICATION l
Sheet 11 of 23 C Prlnavera SItes.1 FL-03 Execution Publication Set
after 09MAY04 12:00 l
U1R28 WORKING SCHEDULE after O9MA Y04 12:00
(
_MAY_
__11__
.1 1o12,14,16.18.20,2210 02,*4
.6.
8,1012Z14,16,18,20.221 0,s2,*4,*6.
,1121.61
-1 Ut 191 0
OP0301248 OP0 77 O-PC468 BIWEEKLY 1
11 MAY04 11 MAY04 191
_PO301 24BNWEEK YOPERATIONIC CKOFBARON1 OPERBARON OF 07 00 0759 CK OF I ARON II HIGH PREI S BREATHING AIR YSTEM03012481 192 0 OP0301240 OPO 77 O-PC-021 4 WEEKLY 5
11MAY04 11MAY04 187 p030124(WEECKL MISCELLANEOUS ATA READING MISCELLANEOUS DATA 07 0 11 59 WEEKLY MISCEl ANEOUS DATA RE OINGS0301240l
____READINGS 193 0 OP0301262 OPO 77 O-PC-073 2 FIRE HOSE STATION 1
116MAY04 12MAY04 176 OPI 301262 FIRE HOSE ATlON CHECK CHECK 0700 14:59 PERI DIC SURVEILLAN OF FIRE HOSE S.TONS0301262 194 0 OP0301279 OPO 77 0-PC-001.7 OUTSIDE BUILDING 32 11MAY04 14MAY04 160 OpO30129 0UTSIDE BUILDING TER CHECK FILTER CHECKS 07 00 14:59 QUA VnERLY F MISC EOUS FILTER /HECKSO 2119 195 0 OP0301292 OP1 76 O-PCMIDS OPERATIONS MID SHIFT 28 07MAY04 13MAY04 DR-N ML-N 204 P 1292OPERA 0NSMIDSHIFTW YROUTINE WEEKLY ROUTINE 0000A 06:59 ORT3-N R-N I
198 o
lP0301313 OPI 76 o-PC-049.7 WEEKLY VERIFICATION 1
10MAY04 10MAY04 231 OP030 131 3 WEEKY VER lATION OF FA E FREmEE OF FACADE FREEZE oo 00.59
_03C 1313GFACADE FR0 EZE PROTECTION iD BA HEATTRA NG 03l33FAADi EZEPR=CTIlA NE 197 0 OP0301331 OP2 77 0-PC-DAYS OPERAIONS DAY SHIFT 10 03MAY04 10MAY04 DR-NDML4N 224 331 OOPERAPDSNSDAYTSHIFT ROUTINE WEEKLY ROUTINE 08o00A 14:59 ORT3-N R-N MOPERATI NS DAY SHIFT WE -KLY ROUTINE 198 0 oP030 1384 OP2 76 G4-GOV OBTAIN G-04 EDG 1
09MAY04 09MAY04 23P0 1384OBTAIN G-04 EDG GOVERN 3R OIL SAMPLE GOVERNOR OIL SAMPLE 12:00 12:59 G-04 EDG GOVERNOR0301394 199 0 OP0301385 OP2 76 O-PC-012Z7
-04 EDOG VIBRATION 1
09MAY04 09MAY04 233 P 1385 G-4 ED VIBRATION (QUA TERLY)
(QUARTERLY) 1200 12.59 G-04 EMERG -NCY DIESEL GENE RATOR VIBRATION (UARTO3O138s 200 0 OP0301348 OP2 76 a-TS-0o4 TS-4. G-04 5
09MAY04 10MAY04 229 P0 1348TS-84, t 04EMERGENCY D ESEL EMERGENCY DIESEL 1200 o
.34f 0
G-04 EMERGENC (DIESEL GENERA R MONTHLY 201 0 OP0215479 OP2 76 04T-0011 IT-.i. P-12AIB SPENT 2
10MAY04 1oMAY04 DR-N ML-N 229 OP021 #Tg 11 P-12AI SPENI FUEL POOL FUL OOL~
08 00' 09-59 ORT3-N R-N 0P21 5479
.1 P-12AI9BSPE FUEL POOLCOL UP 0215479 P-12A/B SPENT F EL POOL COOUIN PUMPS 202 0 OP0301332 OP2 77 0oPCDAYS OPERATIONS DAY SHIFT 42 11 MAY04 16MAY04 182 P0301332OPEA ONS DAY SHIFT YR WEEKLY ROUTINE 0800 14:59 OPERATIONS AYSHIFTWEEKLY tOU11NE0301332 X -
= - -
203 0
OP0215624 OP3 77 O-PC-043.3 CLEAN SERVICE WATER 7
22APR04 09MAY04 DR-N ML-N 796 I4CLN EWATER AINERS STRAINERS 16:00A 18:59 ORT3-NR-N 2
RCEWATER NERS0215624 204 0 OP0301393 OP3 77 O-PC-SW1NG OPSSWINOSHIFT 24 05MAYO04 12MAY04 DR-N ML-N 214 P0 1393OPS RGSHIFTWEEKL OUTINE WEEKLY ROUTINE 16OO0A 18:59 ORT3-N R-N m m i
m -.
205 0 OP0301452 OP3 074T-0014.
SY-14, FO TRANSFER 3
09MAY04 09MAY04 235 P0 1452IT14,F TRANSFER SYSUTE PUMPSI SYTMPMS 8~0 1452M EDG FUEL OILT AFER SYSTEM F JMPSNVALVES 206 0 OP0301453 OP3 04-T-0100.
IT-100, SEAT LKG TEST 3
09MAY04 09MAY04 235 P 01453 T 100 EAT LKG TEST OF )A.452 AND OF DA-452 AND 18:00 18:59 0 01453 G
EDG SEAT LKG T 'S OF DA COMP DlSCH CHK VLVS 207 O OP0301402 0P3l 76 l O-PC-072.2 MONTHLY CLEAN SIDE 6
1 09MAY04 09MAY04 I TDR-N ML-N 232 DP0 01402MONTH Y CLEAN SIDE FIR EXTINGUISHER FIRE EXTINGUISHER 1800 2159 ORT3-N R-N 0 01402 PS OF CLEAN-SIL FIRE EX)MNGUISljER EQUIPMENT Run Date 09MAY04 13:391 LT-03 STANDARD PUBLICATION Sheet 12 of 23 0PrfmaveraSvstns.,Inc.
I FL-03 Execution Publication Set I
after 09MAY04 12:00 I
U1R28 WORKING SCHEDULE after 09MAY04 12:00 I
U ID RESP WO EOID DESCRIPTION RD ES EF RISK MF MAY
_ II STI
.1012.14.16e1120,2210.2*4. 6i8.19¢1Z014,16,18,2O(22 0.2,4, 6. 8.1011214,16, El
- mLiim 0!ijm 208 2
OP0301621 OP3 77 04T-0022 IT-22, 2P-2A-C 2
10MAY04 10MAY04 228 OP0301621 IT-22. P-2A-C CHARGING PUMPS AND CHARGING PUMPS AND 17 00 18:59 0301621E2P 2A-C CHARGING MPS AND VALV 209 2
U2GNDR013 OP3 0-PC021.3 DRAIN U2 MAIN I
10MAY04 10MAY04 DR-Y ML-Y 0
U2GNDR013 RAIN U2 MAIN ELI CTRICAL GENERA OR PER PC 21.
ELECTRICAL 19:00 19.59 ORT3-Y R-N 1
210 2 P0P303335 OP3 77 TS-ECCS-00 SAFEGUARDS SYSTEM 3
11MAY04 11MAY04 0
C P0303335SAFEGU S SYSTEM VE NG (MONTHLY VENTING (MONTHLY) 16:00*
18:59 0303335M EN X.
EuS I _
211 1
CL10CO10 OPS CL.10C TURBINE HALL SW 2
08MAY04 09MAY04 DR-N ML-N 17 I
O1TURBNE HALL SW VALVE L NEUPS VALVE UNEUPS 15 00A 13:59 ORT3-N R-N TURBINE F LL SERVICE WATI R VALVE UNEUPS 212 1
SOP-CV-021 OPS CLM5A PERFORM SOP-CV-003 3
09MAY04 09MAY04 DR-N ML-N 0
ORM SOP-CV. e3 ATTACHMENT 4 & 5 ATTACHMENTS 4 & 5 09:00A 14:59 ORT3-N R-N FILL & VE T CVCS VALVE UL EUPS 213 1
B52-423M OPS 76 B-42 BUS BRACING PMT I
09MAY04 09MAY04 DR-N ML-N 0 B 23MBUS B NG PMTISI-871
_15W871B 12:00 12.59 ORT3-N R-N 480V MOTO CONTROL CENTEI PAB SAFEGUARD 0202527 214 1
OP030958 OPS 82 WG-01789-0 WG-1789 PMT STROKE 1
09MAY04 09MAY04 DR-Y ML-Y 3 Op0 958WG-178 PMT STROKE PEF IT 60 PER IT 60 120W*
1;59 ORT3-N R-N T-16 RCDT S MPLE TO Z46 GA SOLATION OPERA1 OR 0300958 215 1
0157-010 OPS 01-57 FILL&VENTRCDT 2
09MAY04 09MAY04 DR-N ML-N 58 0157 1OFLL &VEI TRCDTPUMPS IA V01 57 PUMPS IAW 01 57 12:00*
13:59 ORT3-N R-N
.216 1
0P0407t61 OPS 82 VNPSE-324 VNPSE-3245. PMT 2
09MAY04 09MAY04 0
1 7 60 VNPSE 245, PMTSTROKE PER T 360 STROKE PER FT 360 12o00 13:59 W-2AIB U1 PURGE SUPPLY F W DISCHARGE 040 661 217 1
O-RT-06C OPS 77 O-RT-066C LLRT CONT PRESSURE 3
09MAY04 09MAY04 DR-N ML-N 324 LLRT CC NT PRESSURE TIU NSMIT1ER LINE TRANSMITTER UNE 12ott 14:59 ORT3-N R-N CONTAIN ENT PRESSURE (1-32A) 0215999 218 1
EP0403494A OPS 78 PT-RCS-1 OPERATING SUPPORT 4
09MAY04 09MAY04 DR-Y ML-Y 270 O
nNG SUPPORT OF INTIAL RCS WALK )OWN OF INFTZAL RCS 120o 15:59 ORT3-N R-N REACT R COOLANT SYSTrM (RCS) PRESSU TEST - IN/04034 219 1
O-RT-055A OPS 77 O-RT-055 PRE LLRT HX-1A 4
09MAY04 09MAY04 DR-N ML-N 0
55APRE HX1A BLOWDOY N BLOWDOWN 120oo 15:59 ORT3-N R-N A STEA GENERATOR BLC WDOWN (P-51)021 990 Z20 1
0148-050 OPS T-036 FILL MFP P-28A & B LUBE 8
09MAY04 09MAY04 DR-N ML-N 90 O 50FILL MFP I -28A & B LUBE 0L RESERVlORS OL RESERVIORS 12:00 19:59 ORT3-N R-N
_I SYSTEM MULTIA ItOR NON-NUMBE RED EQUIPMENT 221 1
B52-424C OPS 78 B-42 BUS BRACING PMT I
09MAY04 09MAY04 DR-N ML-N 0 52 24C BUS BRA NG PMT "15-2
__S1-25I 13:00 13:59 ORT3-N R-N 48sV MOT R CONTROLCENT R PAB SAFEGUAR S0202527 222 1
B52-4210C OPS 76 B42 BUS STAB PMT I
09MAY04 09MAY04 DR-N ML-N 0
210CBUSST) B PMT"ISW-2908"
_1SW-290f 14:00 14:59 ORT3-N R-N 1480VMU ORCONTROLCEN rER PAB SAFEGUA DS0202527 F223 1
B52-4211M OPS 76 B-42 BUS BRACING PMT 1
09MAY04 09MAY04 DR-N ML-N 0
52 1IMBUS BR kCING PMTW-21A
_W-21A 14:00 14:59 ORT3-N R.N 1480V MO OR CONTROL CEN rER PAB SAFEGUA DS 0202527 F224 1
B52-424F OPS 76 842 BUS STAB PMT I
09MAY04 09MAY04 DR-N ML-N 21213 s2FBUS SiT PMTwS-s41B 151-41B 14:00 14:59 ORT3-N R-N 480V MO OR CONTROLC PAB SAFEGU S0202527 225 1 B52-425M OPS 76 B-42 BUS STAB PMT 1 09MAY04 09MAY04 DR-N ML-N 0- 5 25M BUS STA I PMT iCV-5
_ICV-350*
14:00 14:59 ORT3-N R-N 1480V Ma DR CONTROL C PAB SAFEGU S0202527 Run Date 09MAY04 13:39 LT-03 STANDARD PUBLCATION I
Sheet 13 of 23 C Primavera Systems, Inc.
I FL-03 Execution Publication Set
after 09MAY04 12:00 I
U1R28 WORKING SCHEDULE I
after 09MAY04 12:00 x U I[o SPWP WC I.EM DESCRI RD NES IE W
SK I NP~
MA 2261 1 852-426F OPS 76 B-42 BUS STAB PMT
'lCV-1298' 1
09MAY04 09MAY04 14:00 14:59 DR-N ML-N ORT3-N R-N 0
227 1 B52-427C OPS 76 842 BUS STAB PMT I
09MAY04 09MAY04 DR-N ML-N 305
'IRC-596 14:00 14:59 ORT3-N R-N 228 1 B52427M OPS 76 B-42 BUS STAB PMTP-012B' I
09MAY04 09MAY04 DR-N ML-N 17 14:00 14:59 ORT3-N R-N 229 1 B52-428M OPS 76 B-42 BUS STAB PMTW-1382 I
09MAY04 09MAY04 DR-N ML:N 1
14:00 14:59 ORT3-N R-N 230 1 O-RT-052B OPS 77 O-RT-052
'POST LLRT HX-1B 4
09MAY04 09MAY04 13 SAMPLE UNE 14:00 17:59 231 1
SOP4841A OPS B-41 PREPS FOR 8
09MAY04 09MAY04 DR-Y ML-Y 0
DE-ENERGIZING 1B-41 14:00 21:59 ORT3-N R-N 232 1 B52-4212M OPS 76 B-42 BUS BRACING PMT I
09MAY04 09MAY04 DR-N ML-N 0
'W-30A 15:00 15:59 ORT3-N R-N 233 1 B52426M OPS 76 B-42 BUS STAB PMT 1
09MAY04 09MAY04 DR-N ML-N 0
'IRC-427' 15:00 15:59 ORT3-N R-N 234 1
SOP-CV-022 OPS CL-05A PERFORM SOP-CV-003 1
09MAY04 09MAY04 DR-N ML-N 0
ATTACHMENT 6 15:00 15:59 ORT3-N R-N 235 1 CLIJO10 OPS CL-1w CONTAINMENT SW 10 09MAY04 1DMAY04 DR-N ML-N 59 VALVE 15:00 00:59 ORT3-N R-N 236 1
B52425F OPS 76 B-42 BUS BRACING PMT 1
09MAY04 O9MAY04 DR-N ML-N 0
lSIs-26A' 16:00 16:59 ORT3-N R-N 237 1 852-428C OPS 76 B-42 BUS STAB PMT 1
09MAY04 09MAY04 DR-N ML-N 0
'AF-4021' 16:00 16:59 ORT3-N R-N 238 0 0-39.
OPS SECURE PAB I
09MAY04 09MAY04 0
VENTILATION FOR 16:00 16:59 239 1 O-RT-053B OPS 77 O-RT-053 LLRT RCDTTO GAS 4
O9MAY04 09MAY04 DR-N ML-N 300 ANALYZER - POST ORT 16.00' 19.59 ORT3-N R-N 26F BUS STAJ 1480V MO
,27C BUS STA 1480V MO 27MBUS STA 1480V MO 28MBUS STA E480V Mc 5 2BPOSTU 81 SI 341APREPS F 212MBUS BR
- 527§480V M 26MBUS STA 5271480V M, V-.22PERFC 100CONTAIN
!425FBUS BI3 025273480VI
-428C BUS ST 025271480V I
)MSECUR
.5S3BU.RT R 459SFB V-o40 FLL V PMT '1CV-298 OR CONTROL CEN PMT 1RC-59W OR CONTROL CEN PMTTP412B8 OR CONTROL CEN PMT W-138r OR CONTROL CEN lT HX-18 SAMPLE
_AM GENERATOR:
)R DE-ENERGZINt I
CING PMT W-0A JTOR CONTROL CE PMT'IRC-42r
,TOR CONTROL CE ZM SOP-CV-003 AT ENT CVCS VALVE I IENT SW VALVE SERVICEW.
kCING PMT "ISt82 OTOR CONTROL C B PMT AF-4021' OTOR CONTROL C PAB VENTLATIO?
OTTO GAS ANAL)
,DTTO GAS ANAL T & INERT WITH I
PAB SAFEGUAJ 1
PAB SAFEGUAl PAB SAFEGUAJ PAB SAFEGUAJ LINE AMPLE ISOLATION iB-41 PER 1-SOP-NTER PAB SAFEGU NTER PAD SAFEGU rACHMENT 6 NEUPS TER IN CONTAINME iA ENTER PAB SAFEG ENTER PAB SAFEG FOR JUMPER REM ZER - POST ORT ZER (P-34D)
W LINES CONTINGI
-ROM EXCESS LETI ENT & PRETREATM PP PER 01-128 (PAIR PUMP JIT, CREW B 1DS0202527 1050202527 1DS0202527 t0S0202527 P-34C)0215987 80-802 kRDS
%RDS NT 1ARDS JARDS WAL NCY
)OWN HX (P-191P-2i NTAl TIAL)I 2401 1 SOP-CV-w4 C)PS T-004 FILL VCT & INERT WITH I 6 09MAY04 I 09MAY04
- N2 16:00 21:59 DR-N ML-N ORT3-N R-N 9
241 11 CIRT-WB OPS 77 O-RT-067 POST LLRT EX LTDN HX 8 09MAY04 I 09MAY04 CCWUN 16:00 23:59 DR-N ML-N ORT3-N R-N 245
.06MgPOST L 01i6000_
242 0 01-73A OPS SECURE WATER 2
09MAY04 09MAY04 0
TREATMENT&
17:00 18:59 243 1 01-128-B OPS 82 P.0150 FILL&VENTP-015BHHS 4
09MAY04 09MAY04 DR-NML-N 0
A_____PP PER 01-128 (PARTIAL) 17:00 20-.59 ORT3N R-M Ot-73ASECUI U
t1-i28-BIIl 4080361 TRAIN-CBRE U
RT EX LTDN HX CC ECCWTO AND E WATER TREATI VENT P-01SB HHS SAFETY INJECTIMOI DUCED INVENTOR I) 2441 0 TRAIN-CB OPS REDUCED INVENTORY JITT. CREW B 2
09MAY04 I 09MAY04 19.00 20:59 206 I
I I
Run Date 09MAY04 13:391 LT-03 STANDARD PUBLICATION Sheet 14 of 23 C Prmavera Systems, Inc.
I FL.03 Execution Publication Set
after 09MAY04 12:00 I
U1R28 WORKING SCHEDULE after 09MAY04 12:00 U I ID11 RESPI WO IEalD
_E RPTON IRI) IES IEF RISK IMF MAY ST._
13.1012.14,16.18,20.2210 02.4.
- 6. 8.10112,14016,18,20,221 0. 2. 4. 6. 8.1002.14,16.1
_ i 2411 2 1AC-381 E-SA OPS G-01 ENTERTSAC3.8.1.E 0 1 09MAY04 FOR A TRAIN DIG OOS 21:00 DR-N ML-N ORT3-N R-M 0
N a
246 1 - B4tlPTE OPS B-41 IPTEBRIEFTO 1
09MAY04 09MAY04 DR-N ML-N 0
DE-ENERGIZE 1B-41 21:00 21:59 ORT3-N R-N 247 1 B52-421M OPS 76
-B42 BUS BRACING PMT t
09MAY04 09MAY04 DR-N ML-N 0
1S-8608 21:00 21:59 ORT3-N R-N 248 1
OP0408036 OPS 82 P-015B P-15BPMTPERIT-01A 4
09MAY04 10MAY04 DR-N ML-N c
21:00 00-59 ORT3-N R-M 249 1 SOP4341B OPS B-41 DE-ENERGIZE 1B-41 PER 2
09MAY04 09MAY04 DR-N ML-N a
I-SOP480-B02 22.00 23:59 ORT3-N R-M 250 1 SOP-BOC OPS B-01 IPTE BRIEF FOR 1B-01 2
09MAY04 10MAY04 DR-N ML-N C
TRANSFER 23:00 00.59 ORT3-N R-N 251 1
B52-422M OPS 76 B-42 BUS BRACING PMT 1
10MAY04 10MAY04 DR-N ML-N a
1S1-8600 01:00 01:59 ORT3-N R-N 252 0 01-39E OPS 0m39 RESTORE PAB 2
10MAY04 10MAY04 531 VENTILATION 01:00 02:59 253 1 SOP-341C OPS B-41 R-ENERGIZE 1B-41 PE 2
1OMAY04 10MAY04 DR-N ML-N C
1-SOP5480-802 01:00 02:59 ORT3-N R-M 254 1
IT-530D OPS 77 O4T-05300 LRPM & PIGGYBACK 8
10MAY04 10MAYD4 DR-N ML-N C
TESTOFTRAIN BSI 01:00 08:59 ORT3-N R-M 256 1 O-RT.060 OPS 77 O-RT-060 LLRT TRAIN B CONT 8
10MAY04 10MAY04 DR-N ML-N C
SPRAYCIV 02:00 09:59 ORT3-N R-N 255 2
AC-38AE-SZ OPS G-01 EXIT TSAC 3.8.1.E FOR A 0 10MAY04 345 TRAIN DIG OOS 02:59 257 1 OP9C-075 OPS OP-9C RESTORE 1
10MAY04 10MAY04 DR-N ML-N 49 CONTAINMENT PURGE 03:00 03:59 ORT3-N R-N 258 0 1O-73B OPS RESTORE WATER 2
10MAY04 10MAY04 534 TREATMENT &
03:00 04:59 259 1
OP-9CC OPS RESTORE.
2 10MAY04 10MAY04 253 CONTAINMENT PURGE 03:00 04:59 260 1 SOP-B01A OPS B-01 SUPPLY 1B-01 FROM 8
10MAY04 10MAY04 DR-N ML-N c
18-03 IAW 03:00 10.59 ORT3-N R-N 261 1
OP0406193 OPS 76 MS-02084 IMS-2084 PMT STROKE I
10MAY04 10MAY04 DR-Y ML-Y 17 PER IT 80 07:00 07:59 ORT3-Y R-N 262 2
AC-377-IA OPS P-011A ENTERTSAC3.7.7AFOF 0
10MAY04 10MAY04 DR-N ML-N 785 2P-1 1A 08:00 07:59 ORT3-N R-N AC-381E-5A B411PTE B52-421M 0202527 OP040W036 0408036 SOP4341 SOP43(
B5, SOF r
AC-~
ENTER TSAC 3.8.1.1 PTE BRIEF TO DE4 3US BRACING PM1 1480V MOTOR CO?
P-15B PMT PER IT-
_SAFErI INJE 3DE-ENERGIZE 1M U
ICIPTE BRIEF FOI 1
422MBUS BRACIN 025273480V MOTC
)I-9ERESTORE PI
-B41CRE-ENERGQz 530D1LRPM & PG 15917 FIT.060 LLRT TRAII 1215993 AE-5Z EXIT TSA
)P9C-075RESTORI O
01738 RESTORE OP-9CCRESTORE OP-BOA SUPPLY-OP040fj1931M 04O6193j~
AC-377-IAE O-RT-0 021595 FOR A TRAIN D/G NERGIZE 1B-41 1Stam6" rTROL CENTER PAI 1A CTION PUMP 41 PER t-SOP4W 18-01 TRANSFER GPMT S"o860D" R CONTROL CENT B VENTILATION 1B-41 PER 1-SOP YBACKTEST OFT 1RPM PROGRAM T B CONT SPRAY CI
- P-14B PUMPISI-81 3.8.tE FOR ATRI CONTAINMENT Pt WATER TREATME CONTAINMENT PL B-01 FROM 1B-03 L
'R PAD SAFEGUAR 480-802 UUN B SI WAN B HHSI AND R I
28 DISCH CHK/SI IN DIG OOS RGE POST IWP 00-IT & PRETREATME RGE SYSTEM
.W 1-SOP48001 S PER IT 80 FOR 2P-IIA NT SPRAY CIV
. PUMP/S-862A Di!
iS R PIGGYBACK' 48 ISOL (P-55) 37-02&-07
-H CHKISI-A4 30S 2631 1 O-RT-059 OPS 77 O-RT-059 LLRT TRAIN A CONT SPRAY CIV 8
10MAY0AY04 I10AY04 4 DR-N ML-N 10.00 17:59 ORT3-N R-N c
Run Date 09MAY04 *3:391 LT-03 STANDARD PUBLICATION Sheet 15 of 23 C Ptimavera Systems, Inc.
I FL.03 Execution Publication Set I
after O9MAY04 12:00 I
U1R28 WORKING SCHEDULE after O9MA Y04 12:00 4
Ul I
IRESPI WO IEQID I
DESCRITON IRD IES IEF I
IK MF I-MMAY A
STJ S81lC12.14.16.218.2o210. 2. 4,6, 8,19l24.16,18,20,221Q. 2. 4. 6. 8.10112,14,16.1 I
2641 1 OP13AO60 OPS LO&SOSY RESTORE LUBE & SEAL 18 10MAY04 11MAY04 DR-N ML-N OIL SYSTEMS 10:00 03:59 ORT3-N R-N 3
OP13AOI ORESTORE LUBE I M4N LUSE OIL AJIDSEAL OIL SYST_ I
_I 265 0 TRAIN-CA OPS REDUCED INVENTORY 2
10MAY04 10MAY04 189 JITT, CREW A 1Z00 13:59 266 0 TRAIN-CF OPS REDUCED INVENTORY 2
1 0MAY04 1OMAY04 166 JITT. CREW F 15:00-16:59 267 2 OP0301159 OPS 76 P-01 IA 2P-11APMTRUN 1
10MAY04 10MAY04 DR-N ML-N 16:00 16:59 ORT3-N R-N 268 2 AC-377-1Z OPS P-011A EXITTSACa7.7AFOR 0
10MAY04 10MAY04 DR-N ML-N 776 2P-11A 17:00 16:59 ORT3-N R-N 269 1 OP0303382 OPS 76 SC-40953 SC-953 -PMT STROKE 1
10MAY04 10MAY04 DR-N ML-N PER IT 60 19 00 19:59 ORT3-N R-N 270 1 OP0403301 OPS 76 SI-87A-S-857A PERFORM PMT 1
11MAY04 11MAY04 DR-N ML-N c
STROKE IT-40 00:00 00:59 ORT3-N R-N 271 1
O-RT-55B OPS 77 O-RT-055 POST LLRT HX-lA 4
11MAY04 11MAY04 DR-N ML-N C
SLOWDOWN 00:00 03:59 ORT3-N R-N m
0 0P0405897B OPS 76 D-106 PLACE D-1O91D-305 3
11 MAY04 11MAY04 c
INSERVICE FOR 020W-04:59 273 1 IT-530C OPS 77 O4T-0530C LRPM & PIGGYBACK 8
11MAY04 11MAY04 DR-N ML-N TEST OF TRAIN A SI 03:00 10:59 ORT3-N R-M 274 1 IT-740 OPS 77 04-r0740 IT-740, MAIN STEAM 1
11MAY04
.1IMAY04 DR-N ML-N 319 BLOWDOWN 04:00 04:59 ORT3-N R-N 275 1 SOP-B01Z OPS B-01 SUPPLY 18-01 FROM 3
11MAY04 11MAY04 DR-N ML-N a
1A01 IAW 1-SOP480-001 11:00 13:59 ORT3-N R-N 276 1 SOP-CV-020 OPS SOP-CV-003 ILL & VENT LETDOWN 8 3 11MAY04 11MAY04 DR-N ML-N CHARGING 11:00 13:59 ORT3-N R-N 277 1 CVCSPMT OPS CV I1PERFORM CVCS 8
11MAY04 11MAY04 DR-N ML-N 227 WALKDOWN FOR PMT 11W00 18:59 ORT3-N R-N 278 1 SOP-CV-070 OPS SOP-CV-050 FILL & VENT AUX I
11MAY04 11MAY04 DR-N ML-N 0
CHARGING 14:00 14:59 ORT3-N R-N 279 1 X03-010 OPS X-03 IPTEBRIEFTO I
11MAY04 11MAY04 DR-N ML-N DE-ENERGIZE X-03 14:00 14:59 ORT3-N R-N 280 1 SOP-CV-060 OPS CL-05A FILL LETDOWN INSIDE 4
11MAY04 11MAY04 DR-N ML-N 220 CNTMT PER SOP-CV-0M 14:00 17:59 ORT3-N R-N 281 1
X03-020 OPS X-03 DEENERGIZE X 2 11MAY04 11MAY04 DR-N ML-N
. 15:00 16:59 ORT3-N R-N TRF LRPW A STEA I PROGRAM 71 UNIT I MAIN 04T A GENERATOR BSI OP041 125V DC WN A HHSI AND R TEM BLOWDOWN SI 4-CAREDUCED INVW rRAIN-CFREDUCEo p03Ot1592P11A 0301159SCOMF AC-377-1ZEXITT I
OP0 3 0 3 3 82SC 03033821F OP0403301 S 040
.05SB POST LLRT I
)WDOWN (P-51)021 5897BPLACE D-10' STATION BATTERY rr.s3ocLRPm R PIGGYBACK TES IT-7 VALVES (REFUELIP
)P4101ZSUPPLY If SOP-CV.020F1 CS LETDOWNIPUR CVCSPMT11PEF SOP-X03-0 VOLTAGE STATION V-060 FtLL LETDO FILL &
i VOLTAGE STATIC SOP-C SEAL OIL SYSTEI tNTORY JITT, CRE I INVENTORY JTT, MT RUN ONENT COOLING V SAC 3.7.7A FOR 2F 953 -PMT STROKE R LQUID SPACE h857A PERFORM Pi 331O1HX-IIARHR IX.1A BLOWDOWN 11305 INSERVICE 405897f 4 & PIGGYBACK TE!
r0215916 goIT-740, MAIN STE IG)02159251 01 FROM IA-01 IA LL & VENT LETDOV FICATION FILL & VI FORM CVCSWALK CV-070FILL & VENT l0PTE BRIEFTODE AUXILIARYTRANSF NN INSIDE CNTMT ENT CVCS VALVE I X03-020D J AUXILIARY TRAN!
V-030FILLL&VENT:
7RPUMP
-11A FER IT 60 AMPLE CONTAII T STROKE rT-HX OUTLET TO
[CONTNGENCY
-OR D108M-10(
r OF TRAN A S kM BLOWDOVlI V 1-SOP480-001 fN & CHARGINC NT DOWN FOR PM1 I
AUX CHARGINC II
- -ENERGZE X-03 ORMERE
'ER SOP-CV-W, INEUPS ENERGIZE XO.0
- FORMERN PEAL INJECTO S
'REWF HIGH SOP-HIG 2821 1 SOP-CV-030 I OPS SOP-CV-30 FILL & VENT SEAL INJECTION.
4 11MAY04 11MAY041 DR-N ML-N 15:00 18:59 ORT3-N R-N (0
Run Date 09MAY04 *3:391 LT-03 STANDARD PUBLICATION Sheet 16 of 23 0 Primavera Systems, Inc.
I FL-03 Execution Publication Set l
after 09MAY04 12:00 I
U1R28 WORKING SCHEDULE I
after O9MA Y04 12:00 U
ID RESPl WO I E1t DESCRIPTION RD ES EF RISK MIF MAY T_
310112,14,16"2O,221 0.2,4
- 6. 8.1011214,16,17,0221 0, 2.4. 6, 8,10112,14,16 lA~lr '910114 _ [OL _-MN1,101111 2831 1 VNCCB52Z PPG MILESTONE END CONTAINMENT FAN COOLERS D WORK 0
09MAY04 09MAY04 I DR-N ML-N 15:00 14:59 ORT3-N R-N 0 VNC 284 1 CSA1Z PPG P-025A-M END CONDENSATE 0
1 0MAY04 tOMAY04 DR-N ML-N 134 PUMP-25AWORK 01:00 00:59 ORT3-N R-N 285 1 480VXO01A PPG B-01 START480V BUS 0
10MAY04 10MAY04 DR-N ML-N 0
RELATED ENERGIZED 03:00 02:59 ORT3-N R-N 288 1 S8I01Z PPG MILESTONE CLOSE HHSI B LOOP 0
10MAY04 10MAY04 DR-N ML-N 0
WORK WINDOW 09:00 08:59 ORT3-N R-N 287 1 SIBo2Z PPG MILESTONE CLOSE CTMT SPRAY B 0 10MAY04 10MAY04 DR-N ML-N 40 TRAIN P-14B WINDOW 1000 09.59 ORT3-N R-N 288 1 SIA01U PPG MILESTONE ENDOFSI-ATRAIN 0
10MAY04 10MAY04 DR-N ML-N 0
ALIGNEDAS REACTIrl 11:00 10:59 ORT3-N R-N 289 1 SIA02Z PPG MILESTONE CLOSE CTMT SPRAY A 0
10MAY04 10MAY04 DR-N ML-N 32 TRAIN P-1M WINDOW 18.00 17:59 ORT3-N R-N 290 1 SIAOIZ PPG MILESTONE CLOSE HHSI A LOOP 0
11MAY04 11MAY04 DR-N ML-N 0
WORK WINDOW 03:00 02:59 ORT3-N R-N 291 1
4KVA01Z PPG A-01 CLOSE A01 BUS 0
11MAY04 11MAY04 DR-N ML-N 221 RELATED WORK 13:00 12 59 ORT3-N R-N 292 1
13KVX01A PPG X-03 START HV STATION AUX 0
11MAY04 11MAY04 DR-N ML-N 0
XFMRWORK(X03) 14:00 13:59 ORT3-N R-N 293 1 480VX01Z PPG B-01 B01 BUS RELATED 0
11MAY04 11MAY04 DR-N ML-N 0
ENERGIZED WORK 14:00 13:59 ORT3-N R-N 294 1 CVX01Z PPG MILESTONE END CVCS HIGH 0
11MAY04 11MAY04 DR-N ML-N 222 PRESSURE LETDOWN 14:00 13:59 ORT3-N R-N 295 1 1CVX=2 PPG MILESTONE END CVCS LOW 0
1 1MAY04 11MAY04 DR-N Mt-N 189 PRESSURE LETDOWN 14:00 13:59 ORT3-N R-N 296 1
CVX03Z PPG MILESTONE END CVCS NORMAL 0
11MAY04 11MAY04 DR-N ML-N 161 CHARGING WORK 14:00 13:59 ORT3-N R-N 297 1
CVX07Z PPG MILESTONE END CVCS 0
11MAY04 11MAY04 DR-N ML-N 10 MAKEUPIBLENDER 14.00 13:59 ORT3-N R-N
- 852ZEND CO lEND CON C
EN ITAINMENT FAN C(
rAINMENT FAN CO
- A11ZEND CONDEI lCONDENSAI 8OVXO1ASTART48 lBEGINNIt SIB01Z SIB8YA SIA0iE1U 3 HIGH HEAD SAFE 48V IOLERS D WORK
)LERS D WORK (B ISATE PUMP-25AV E PUMP P-25A 3V BUS RELATED!
GOF A TRAIN BUS
'LOSE HHISI B LOC END HIGH HEAD &
ZCLOSE CTMT SPI lEND WORK CTM IDOF SI-A TRAIN A ISTART HIGH HE SIA02ZCLOSE C7 lENC SIAO1ZC rY INJECTION A LO 4KVAO AC 13KVX01ASTART HIGH VOLTAGE SI O1ZB01 BUS REUA END C CVX01ZEND CVCE END CHARGIN4 CVX02ZEND CVCI END CVCS CVX03ZEN END CVCS CVXo7ZE END CHARGIN, CVX06ZEND END CHARGI RA N)
ORK NERGIZED WORK NORK WINDOW PWORK WINDOW FEMY INJECTION B AY 13 TRAIN P.148 SPRAY B TRAIN P.
.GNEDAS REACT AD SAFETY INJECT MT SPRAY A TRAM WORK CTMT SPRA
.OSE HHSI A LOOP 5P WORKl IZCLOSE A01 BUS I BUS WORK OROI IV STATION AUXX ATION AUXTRANSI TED ENERGIZEDIA F B03 BUS WORKV HIGH PRESSURE I MAKEUP/BLENDE LOW PRESSUREI NORMAL LETDOW CVCS NORMALC ORMAL CHARGIN CVCS MAKEUPI MAICEUPIBLENDE S AUXILIARY C G MAKEUPIBLENC LOOP WORK VINDOW 14B mY FLOWPA-ON A LOOP WO I P-t4AWINDOM YATRAIN P-14A WORK WINDOY lELATED WORI JTAGEl MR WORK (X03 ORMERI ORK COMPLETE INDOWl ETDOWN WORI tWORKl ETDOWN WORP WORKI tARGNO WOR?
WORKI LENDER WOR?
GING WORI IRWORKl 298 1 CVX06Z PPG MILESTONE END CVCS AUXILIARY CHARGING WORK 0
11MAY04 15:00 11MAY04 14:59 DR-N ML-N ORT3-N R-N C
z -
I f -
- l~
IR 3 -
-E__
209 2 PR0300114 PRE 77 RESP 6.1 FLUX MAPPING -
4 10MAY04 10MAY04 218 _
PR0300114FL XP1NG.
NE ROUTINE 07:00 10-59 0300114 CORE POWER ISTRIBUTIONENU POWER R Lt_ _ _
SD Mqa Z _ _
300 1 S-1600-34 SDM 21 R-1 P INCORPORATE 62 06MAY04 12MAY04 0
P_26 - IN ORPORATE CO PKG I COMMENTSfREVIEW 1500A 01:59 Run Date 09MAY04 13:391 LT-03 STANDARD PUBLICATION l
Sheet 17 of23 OPrmavea Sysems, Inc.
I FL-03 Execution Publication Set
after 09MAY04 12:00 I
U1R28 WORKING SCHEDULE l
after 09MAY04 12:00 J..
U ID RESP 301 SDGSI-191 I SDS Wo ST ma 76 EarD CONT Z 065A DESCRIPTION lRD EF RISK DR-Y ML-Y ORT3-Y R-N MF Su.
I MAY 3,10112,14,161&20,22L O* 2.4, 6* 8,10u1214116,1
- 9. 2A.4.10I12.14.1R.1 Man 10 T.'e 11 ENGINEERING j 35 08APR04 14MAY04 WALKDOWN - SUMP 08:00A 0959 INTRUSION ISSUESI I
45Xo.4s51191 ENGIN#ERING WALKDOWOI SUMP INTRUSI0Oy ISSUES 3021 01 SE0311772A SEC SECURITY SUPPORT Z-65A.
-MR 03-044 8V0D 10MAY04 21MAY04 07:00 14:59 120 I SE0311T72ASEEURITYSUPPORT *065A-MR03-044 MAN4OLE #1 031177231 l
I l
-n I
{v z
,^,DI. A I _cr I
nll
_cr IDS A
- nA
.zA^
I-1A Uj I U
- C;U IAI OmL.
UMILL Ot'tUrl I T FORCE-ON-FORCE DRILL D
1U i TU V.
14:0U I
59P.1IJI 2IO SECIDRIL.ASECURRY ORCE-ON-FORCE )RLL E
304 1 TGSUPPORT I TGG TG-01.T PROVIDE CRANE, RIGGER AND TOOLROOM 47 13APRO4 I 12MAY04 I DR-Y ML-Y 0900A 13:59 ORT3-Y R-N rGsiPPoRTPROV4E RANEC RIGGEi ANDTOOLROOM UPPORT(PT2)
=
I ut
_A
_A A-_
A qnR I.
I TR Rfd I Tt^- 1 7R I
T-A ns T
.11.1 I
I v.W4U 1U',
'U IU-V.I RECONNECT MS INLIEU I 8 07MAYu4 10MAY04 DUR-Y ML-Y PIPING TO HP TURBINE 08:OOA 14:59 ORT3-Y R-N 112 rG4; WRECOHNI CT MS INLET PIP TURI
_I
.;[
THPW~
A
__r_
_HIGH PR FUIRF TIIRRINF133 3061 1 TG0213967A TGG 76 1PIPING CRO REPLACE CROSS-UNDER
....... %,s 7
07MAY041 10MAY04 1 DR-Y ML-Y 090uA 13:59 ORT3-Y R-N 25 m4"97A-RE'u CE CROSS-UNDER MAAS I
Tn IRmik I
I I
I I
vm I
I I
1 I
I oun I I
TG-XUNDZVI I T-G to PIPING CRO I CROSSUNDER PIPING 1 2 1 07MAY04 1 uMAY04 CLOSEOUT INSPECTION I 10:OOA 08:59 DR-Y ML-Y ORT3-Y R-N 1a rG-4JND2V1CROS UNDER PIPING H
mm I1-
EOUT INSPECTIC I TURBINE EXHA 3081 1 RF-190-E TGG 76 O-RF-190 CLOSE HOTWELL 3
07MAY04 10MAY04 MANWAYS 1000A 09:59 DR-Y ML-Y ORT3-Y R-N RF-110ECLOSE 14TWELL MANWAYS I
I lI CONDIENEFR HrT
- EXHAUST TO MS1 ST TO MSRS0302 WELL INSPECTION SINGS 3EN EXCITER COO KCITER COOLER IANWAY COVERS 02153 rSo213967 40 0215877
-ER 309 1 TG-30840 TGG 76 TG-01-T INSTALL UPPER HALF 10 09MAY04 10MAY04 DR-Y ML-Y 0
OUTER STEAM GLD 17:00 02:59 ORT3-Y R-N CASINGS 310 1 TG-HX52-PT TGG 82 HX-052 HX-052 - PRESS TEST 4
10MAY04 10MAY04 DR-Y ML-Y 51 GEN EXCITER COOLER 07:00 10:59 ORT3-Y R-N 311 1
TG-30930 TGG 76 TG-01-T INSTALL HP TURBINE 10 10MAY04 11MAY04 DR-Y ML-Y 11t MANWAY COVERS 07:00 08:59 ORT3-Y R-N 312 1 TG0302151A TGG 76 TG-01 TEST REBUILT 2
11MAY04 11MAY04 DR-Y ML-Y 0
AUTOSTOP OIL RELIEF 07:00 08:59 ORT3-Y R-N VALVES 313 1 TG0213965A TGG 76 MS-02729 REMOVEX-UNDER UNE 5
11MAY04 11MAY04 DR-Y ML-Y 0
FLUSHING FDITURE 07:00 11:59 ORT3-Y R-N (MS-2729)__
314 1 TG-30780 TGG 76 TG-01-T PERFORM ALGNMENT 10 11MAY04 12MAY04 DR-Y ML-Y CHECK ON HP-LP 07:00 08:59 ORT3-Y R-N COUPLING 315 1
TG-30700 TGG 76 TG-01-T CLEAN GOVERNOR 5
11MAY04 11MAY04 DR-Y ML-Y 0
PEDESTAL 08:00 12:59 ORT3-Y R-N 316 1
TGO302151B T
76 TG-01 REINSTALLAUTOSTOP 4
11MAY04 11MAY04 DR-Y ML-Y 0
OIL RELIEF VALMES 09:00 12:59 ORT3-Y R-N 317 1
TG0213966A TGG 76 MS-02730 REMOVEX-UNDER LINE 5 11MAY04 12MAY04 DR-Y MLY 37 FLUSHING FIXTURE 12:00' 08:59 ORT3-Y RN (MS-2730)
.110 I
_uU-
- rflO rr R
rs_
Iflli.l lr ',LJiflr>
~svfl vn
- n.
lv s
T r-30840o~sT4 UPPER HALF OU Iin-14ti I
ut-u 001 aws M_
TG.HX52.PTHX 03021131 TG6309301N 0213969m TER STEAM GLD C tSSURETTURBINE hs2.PRESS TEST
- TG-01 TG E-01 TALL HP TURBINE I U
HIGH4 PRFSSUI F TURBIN TGU GENERATOR (GE 02151ATEST REI ERIC; SEE COMPC
_19 LTAUTOSTOP OIL 4ENTS)03021513 I }x75 } ff rvl I
TG0213965J REMOVE X-UNDERULINE FLUSHING FC
- MSR CROSSUNDi TG-301 INE GENERATOR TG021396CJ 4X-22BID MSR CRC R PIPING DRAIN CC 10 PERFORM ALlGt HIGH PRESSURE T TG-3 HIGH PRESSURE 3O3021SIBREINST1
- ENERIC; SEE CON REMOVE X-UNDER SUNDER PIPING 0 TG-30720 INS HIGH PR[
NTROL02t3965E MENT CHECK ON t IRBINE0302153E 1700 CLEAN GOVEF rURBINE03021531 LL AUTOSTOP OIL PONENTS) 0302151 LINE FLUSHING FE WN CONTROL021 4LL GOVERNOR PE SSURETURBINEG:
RELIEF VALVES TURE AS-272 P-LP COUPLING NOR PEDESTAL RELIEF VALVES TURE (MS-2730) 3966w-~
DESTAL. COVES 02153E TUR JlG 7
I W14U 10 IWlwl PEDESTAL COVER z
13:00 I I14:59I
-RT ML-N 13:00 14:59 ORT3-Y R-N 1.
LJ.
.J...............L................J.
- 1. ________________________ J..L...........................Z
£ i.......I....-.A
.1.
Run Date 09MAY04 13:39 LT03 STANDARD PUBLICATION Sheet18of23 O Pnmavera Systems, Inc.
l FL.03 Execution Publication Set I
after O9MAY04 12:00 1.
U1R28 WORKING SCHEDULE after 09MAY04 12:00
EF I
RISK MF I MAY 1
oI I ST I
31q.112,14,11618920,2210.2.4.6, 8,{1011r14,16f1&20.2210 12 e416.8.lOIl2l4,16.1 1*0 ii WSIX4 !D m 1_l-_ _
A I
3191 t CL-2B wcc CL 2B MODE 6 TO MODE 5 CHECKLIST 255 25APR04 I 20MAY04 I DR-N ML-N 08 00A 02:59 ORT3-N R-N 0 CL-2b MODE 6TO MODE 5 CHECKLIST
.g-g-lI-320 1 1 CL-2E WCCI CL 2E MODE 3 TO MODE 2 CHECKLIST 4241 02MAY04 I 27MAY04 DR-N ML-N 19:00A 03:59 ORT3-N R-N 0 CLMODE 3 TO JODE 2 CHECKLIST El imgpI I4-321 1 CL-2F wCC CL 2F MODE 2 TO MODE 1 CHECKLIST 444- 02MAY04 I 27MAY04 DR-N ML-N 1900A 23:59 ORT3-N R-N 0 CLA 2MODE 2 TO ?ODE I CHECKLIST Il -
I I
322 1 T-8690-R WCC 102-1.TG-0 I MRR 102-1(rG-01 CE I
08MAYD4 09MAY04 DR-Y ML-Y 804 REV2-1 16:00A 12:59 ORT3-Y R-N 323 1 T-0514-R WCC WG-1788 I WG WG-17881C I
09MAY04 09MAY04 DR-Y ML-Y 3
REVO1 1200 12:59 ORT3-N R-N 324 1
T.0515-R WCC WG-1789 1 WG WG-1789 IC 1
09MAY04 09MAY04 DR-Y ML-Y 3
REV01 12.00 1259 ORT3-N R-N 325 1 T-2078-R WCC CW SYSTEM I CW CW SYSTEM EPT 1
09MAY04 09MAY04 93 REVD_-I 1Z-0 1Z59 326 1
T-6397-H WCC rT-300C I CS IT-00C OPS I
09MAY04 09MAY04 65 REVO-1 1200 12:59 327 1 T-7435-R WCC -
09MAY04 09MAY04 46 I1BS2-423C(SI-851B)OPE 12:00 1Z59 328 1 T.7440-H WCC MR 01.128 1 480V MR 01-128 1
09MAY04 09MAY04 DR-Y ML-Y 0
IBS2-424C (S-825B) OPE 12:00 12:59 ORT3-Y R-N 329 1 T-7463-H WCC B52-426M 1 480V MR 01-128 1
09MAY04 09MAY04 DR-Y ML-Y 2
1B52-426M (RC-427) OPE 12-00 1259 ORT3-Y R-N 330 1 T-8001-R WCC B52429DL 1 480V B52-429DUDR E I
09MAY04 09MAY04 462 REVO-1 12:00 12:59 331 1
-0I-T REV10-1 1
09MAY04 09MAY04 220
_ _I -T 1200 1259 332 1 T-8598-R WCC WG-1788-O 1WGWG-1788-OMM 1
09MAY04 09MAY04 DR-Y ML-Y 3
REVD-1 1:00 12:59 ORT3-N R-N 333 1 T-8599-R WCC WG-1789-0 1 WG WG-1789-0 MM I
09MAY04 09MAY04 DR-Y MLY 3
REVO-1 12:
12:59 ORT3-N R-N 334 1 T-8808-R WCC P-28B 1 CS P-288 EM REVO.3-1 1
09MAY04 09MAY04 DR-Y ML-Y 0
12.00 12:59 ORT3-N R-N 335 1 T-8s39-R WCC CRDMIRPI I RC CRDMRR EM I
09MAY04 09MAY04 116 REV0-2 12:00 12:59 336 1 T-8889-R WCC AF-104 1 AF AF-104 MMV REV3-1 I 09MAY04 09MAY04 257 12:00 12:59 0-R I MRR 10; 11 MRR 102-1 4-R1 WG WG-II WGWG-17
$.R1 WG W-II WGWG-17 8-R1 CW CW 1 cwcwseN 74411 CS IT-30 II CSIT-300C S1R1 480V MF l1 480V MR 0 0H1 480V MF I1 480V MR 0 3H 1 480V MF I1 480V MR 0 L-R1 48V BS I1 480VB52-4 8I4O TU TO-I 1TUTG-01.1 IjR 1WG W-I1 WGWG-17 "1 WG W-Ii WGWG-17 L8R1 CS P-281 I1CSP-28BE INR I RC CRD II RCCRDMW g.Ri AFAF-11 Ii AFAF-1041 0H 0 VNBI W.
10008980 1I1T" CE REV2-rG-01 CE REV2-1 0 788 IC REVO-1 8 IC REVO-100105 789 IC REVO-1 19 IC REVO-100105 YSTEM EPT REVO-
)TEM EPT REVD-I C OPS REVO-1
°PS REVO- 00168 D1-128 1852-423C
-128 1B52423C (SI 01-128 1B52-424C
-128 1B52-424C (SI 01-128 1B52-426M
-128 1B52-426M (RI
-T REV1O-1 REV10-10018188 788-0 MM REVO-I 8-0 MM REVO-1 00 78940 MM REVO-I 9-0 MM REVO- 00 IEM REV0.3-1 A REV0.3-1 001880 VJRPI EM REVO-2 PI EM REVO-2 0018 I MMV REV34
[MV REV3-1 001881 90 EM REVO-1 18690 4
5 t12078 S1-851B) OPS REV0 851 B) OPS REVO-1 S825B) OPS REV0 B258) OPS REVO-1 C RC-427) OPS REVO0
-427) OPS REVO-1 C 0-1 0080oo0 8598
~8599
'39 1017435 1
017440 017463 337 1
T-980-H WCC W-190 DVNBIW-190EMREVO-11I1 09MAY04 I 09MAY04 1200 1Z59 7
JA L
u 4-4
- 4.
1 Run Date 09MAY04 13:391 LT-03 STANDARD PUBLICATION Sheet 19 of 23 C Primavera Systems, Inc.
I FL.03 Execution Publication Set I
after 09MAY04 12:00 I
U1R28 WORKING SCHEDULE after 09MAY04 12:00 ID
~ RESPI wo I oO ESCRIPflON JR ES
_I EF I_____RISK__I__
____I__MAY
- mlj114 ID A
33811 T-20881-R IWCC EM REVI-1 1 RDC EM REV1-1 2
09MAYD4 I 09MAY04 12:00 13:59 115 339 1 T.7452-H WCC B52425M 1 480V MR 01.128 2
09MAY04 09MAY04 DR-Y ML-Y 0
1B52425M (CV-350) OPS 1200 13:59 ORT3-Y R-N 340 1 T-7941-R WCC MS-2084 I MS MS-2084 REVO-1 2
09MAY04 09MAY04 0
12:00 13:59 341 1
T-8378-R WCC P-2A 1 CV P-2A MM REV0-1 2
09MAY04 09MAY04 DR-N ML-N 45 12:00 13:59 ORT3-N R-N 342 1 T-8954-R WCC S-6050A I IOPS S-6050A IC 2
09MAY04 09MAY04 5E REV4-1 12:00 13:59 343 1 0-1358-2 WCC P-010B FILL & VENT RHR TRAIN 4
09MAY04 09MAY04 DR-N ML-N 0
a 12:00 15:59 ORT3-N R-N 344 1 T-1831-R WCC HXt15A 1 VNCC HX-15A MM 4
09MAY04 09MAY04 62 REVI-1 1Z:00 15:59 345 1
T-7439-R WCC MRO1-128 1480VMR01-128 I
09MAY04 09MAY04 0
1B52423M (SI-871B) OP 13:00 13:59 346 1
T.7440-R WCC MR 01-128 1 480VMR01-128 I
09MAY04 09MAY04 DR-Y ML-Y 802 C
1B52-424C (SI4825B) OP 14:00 14:59 ORT3-Y R-N 347 1 T.7464-H WCC MRO1-128 1480VMRO1-128 1
09MAY04 09MAY04 DR-Y ML-Y 1B52-428C (AF4021) 14:00 14:59 ORT3-Y R-N 348 1 T-8958-R WCC MR 01-128 1 480V MR 01-128 1B42 1
09MAY04 09MAY04 802 CAUTION TAGS EM 14:00 14:59 349 1 T-9667-R WCC C-1 I CONT C-I MM REV1-1 1
09MAY04 09MAY04 12 14:00 14:59 350 1 T.7437-H WCC MR 01-128 1 480V MR 01-128 2
09MAY04 09MAY04 0
_1B52423J (SI-870B) OPS 14.00 15:59 351 1
T.7450-H WCC MROI-128 1480VMR01-128 2
09MAY04 09MAY04 DR-Y ML-Y 0
1B52425F (SI-82A) OPS 14:00 15:59 ORT3-Y R-N 352 1 T-7462-R WCC B52426F 1 480V MR 01-128 1
09MAY04 09MAY04 DR-Y ML-Y 43
_1B52426F (CV-1298) 15:00 15:59 ORT3-Y R-N 353 1 T-7452-R WCC B52425M 1 480V MR 01-128 2
O9MAY04 09MAY04 DR-Y ML-Y 42 lB52425M (CV-350) OPS 15:00 16:59 ORT3-Y R-N 354 1 T-7463-R WCC B52426M 1 480V MR 01-128 1
09MAY04 09MAY04 DR-Y ML-Y 45 1B52426M (RC-427 OP 16:00 16:59 ORT3-Y R-N 355 1 T-8124-R WCC MR 01-128 1 480V MR 01-128 1B-42 1
09MAY04 09MAY04 DR-Y ML-Y 42 BUS BRACING EM 16:00 16:59 ORT3-Y R-N 6.R 1 RC EM El RDC EMI 2-H 1 480V MR Ml 480V MR
-R I MS MS-2 MI MS MS-2(
S-R I CV P.2A E
CVP-2AI I-R1 IWPS S-I E
IOPS S-(
5B.21FILL & VE
-tR I VNCC H
_1 VNCC 9-R 1 48V MR II 480V MR
-SR 1 480V MR I 480V MI 4H 1 480V MR II 480V M "I 48V MR 1E 480V M 7RI CONTC-11 CONTC 74 1 480V MR E
480Vl 0-H 1 480V MR E
480VI 5 R1 40V MI 46211 480VI R1 480V MI r452fl1 480\\
463-R1 480V1 1748311 480O 124-St1 480V 1812411 480' 731-R 0 EBA H 1873110 EBA REV1-1 tEVI-i 0012086 01-128 1B52-425M 31.128 1B52425M (
184 REIV-1 84 REVO-1 0017941 JIM REV0-I IM REVD-1 0018378 350A IC REV4-1 50A IC REV4-1 0018 MT RHR TRAIN B
- -ISA MM REVI-1 HX-15A MM REV1-1 01.128 1B52-423M 4 31-128 1852-423M(~
01-1281B52-424C 101-128 1B52-424C 01-128 1B52-428C t01-128 1B52428C 01.128 IB-42 CAUT 101-128 1B-42 CAUL IMM REV1-i
-1 MM REV1-1 00091 01.128 1B52-423J :
R 01-1281B52423 01.128 1B52.42SF tR0I-128 1852425 01-128 1B52-426F IR01-128 1B52426 01-128 1B52-425M MR 01-1281B52-42 IR 011281B52-4261 MR 01-128 1B5242 R 01-128 1B42 BUI MR 01-128 1B-421 26 MM REVO-1
<-26 MM REVO-1 CV.350) OPS REV0 V-350) OPS REV0-
)54 3011831 58718) OPS REVC 3-871B) OPS REV0-314825B) OPS REVC S-8258) OPS REV kF-4021) OPS REV(
AF-4021) OPS REV ON TAGS EM REV1 ION TAGS EM REV 67 W-870B) OPS REV0W (S-8708) OPS RE
-826A) OPS REVO (S-826A) OPS REI CV-11298) OPS REV (CV-1298) OPS RE (CV-350) OPS REVI 5M (CV-350) OPS RI RC427) OPS RE 5M (RC-427) OPS R BRACING EM RE%
IS BRACING EM RE 0017452 01
- 1 1 0017440 1
-1 0017464
.1
.1.1t00tB9SS 0-10017437 I
10.10017450 1
y0-1 I-I
.1 p0-1 4-1 V41 3581 0 T-8731-R WCC K-26 0 EBA K-26 MM REVO-1 1
09MAY041 09MAY04 16:00 16:59 546 A L __ _ _ _ __ _ __
__ _I I__.
I I1 I
I4 Run Data 09MAY0413:39l LT.03 STANDARD PUBLICATION Sheet200f23 Primavera Systems, Inc.
A FL-03 Execution Publication Set l
after 09MAY04 12:00 U1R28 WORKING SCHEDULE after 09MAY04 12:00 I
U D
IRESP WOl EGID DESCRIPTION RD ES EF RISK MF 9MA I
KMon EF RIS MV MA IIST I
I__
111.1,6.aO,202468.oI Z141,8,021.2468l;X]2E4i1 35171 1 T-8970-R wcC oPs 101-135B OPS REV0-1 I I 19AY04 I 09M1AY04 16:00 j16:59 0
1 358 1 T0460-IH WCC MS-5958 I MS MS-5958 IC REVO-1 2
09MAY04 09MAY04 24 16:00 1759 359 1
T-8024-H WCC 1 480V IWP 01.-28E-FN 2
09MAY04 09MAY04 0
(01-39) EM REV\\2 16:00 17:59 360 1 T-7450-R WCC MR 01-128 1480VMROI.128 1
09MAY04 09MAY04 DR-Y ML-Y 354 152-425F (SI826A) OPS 17:00 17:59 ORT3-Y R-N 361 1
T-7464-R WCC MRO1-128 1480VMR01-128 I
09MAY04 09MAY04 252 1852-428C (AF-4021) 17:00 17:59 352 0 T201239R WCC Z-014 REMOVETAG(OZZ.14 1
09MAY04 09MAY04 799 MM REVO-4) 17:00 17:59 363 1 T-7437-R WCC MR01-128 1480VMR01-128 2
09MAY04 09MAY04 0
1B52423J (S-870B) OPS 17:00 18:59 364 1 T-7048-R WCC P-288 1 CS P-28B EM REV2-1 3
09MAY04 09MAY04 DR-Y ML-Y 144 17:00 1959 ORT3-N R-N 365 1 T-7428-H WCC MR 01-128 1 480V MR 01-128 2
09MAY04 09MAY04 DR-Y ML-Y 0
(185242M (51860B) OPS 19:00 20X59 ORT3-Y R-N 366 1 T-0479-R WCC Sl-844A 1 SI SI-844A IC REV0-1 I
09MAY04 09MAY04 DR-Y ML-Y 264 22t00 22.59 ORT3-Y R-N 367 1 T-0480-R WCC SI-844B 1 St SI-8"4B IC REVO-1 I
09MAY04 09MAY04 280 2Z00 2259 368 1 T-7428-R WCC MR 01.128 1 480V MR 01.128 1
09MAY04 09MAY04 DR-Y ML-Y 0
1B52-421M (SI-860B) OPU 22:00 2259 ORT3-Y R-N 369 1 T-8sr7-R WCC SI-844A 1 SI S14844A MMV REV2-1 2
09MAY04 09MAY04 263 22:00 23:59 370 1 T-8747-H WCC C-41 1 RDC C-41 EM REV011 I
09MAY04 09MAY04 DR-Y ML-Y 0
23:00 23:59 ORT3-Y R-N 371 1
T-7434-H WCC MR 01-128 148CVMROI-128 2
09MAY04 10MAY04 DR-Y ML-Y 0
1B52422M (S-860D) 23:00 00.59 ORT3-Y R-N 372 1 T-0680-R WCC ICP-2.20 MMS ICP-2.20 IC REVO-1 1
10MAY04 10MAY04 DR-Y ML-Y 362 00:00 00.59 ORT3-Y R-N 373 1 T-3782-R WCC CS-218--S 1 CS CS-2188-S EM 1
10MAY04 10MAY04 139 REVO-1 00.00 00.59 374 1 T-8024-R WCC IWP 1 480V IWP01-128E-FN I
10MAY04 10MAY04 0
(01-39) EM REVO-2 00 00 00:59 T7 I.-
0' Oi 7-0i g70-R1 01-1 1897031 01-1 46541 MS M 10460E1 M 024H 1 480V 8024fl1 4
- 7450.R1 48 017450114 764R1 01746431 48 1I239RREM0 I
.7437-11 017437 1
- 708R 1 CS 017048_
T.7428-11 1 0017428 T-047 00104 T48 001 04~
T.74294 001742 T.8871 001811 T.874 0011 T.-743
- 0017, T-N 001 T-37 001 T-80 001 T86 001 B OPS REVO-1I 958C OS REVO-1I M-5958 IC REVO-I MS-5M5 IC REVOI-Nal..
VP 01.1282E FN (0 VIWP 01-128E-FNI MR 01.1281B624 VMR01-128 1852 MR 01.128 1852
- MR01-128 1652 JETAG (O Z
Z.114 M MR 01.128 185244 S0V MR 01.128 165 286 EM REV2.1I CS P-288 EM REV2 0V MR 01-128 1B6 11480V MR 01-1281 1 SI S84A IC I SI SI-44B IC R 31 SI S-844B IC I 480V MR 01-128 I1 480VMR01-1 I SI SI844A MMV EISt SI1844A M
-I RDC C-41 EM 471 RDC C-41 E I1 480V MR 01-12 1E 480V MR °l OMMS ICP.2,201 68031 MMSICP-2 3R1 CS CS.218&-
7821 CS CS-211 24 R1 480V IWP 01 02431 480V IWP 1 480V IWP 01 69431 480V IWP i39) EM RElVO-2 (01-39) EM REVD-2 SF (Sl-826A) OPS RI I25F (SI-826A) OPS I BC (AF.4021) OPS R 128C (AF-4021) OPS A REV04) 3J (SI-870B) OPS RI
!-423J (SI-870B) OP!
'1, i421M (S"-860B) OP 152421M (SI-80B) v0-1
!EV0l
'EV0-1 B52 421M (SI860E 8 1B52421M (SI-3 REV2-1 REV0-1 1B52-422M (SM 8q
.128 1B52-422M (SI REV0-1 IC REVO-1 EM REVO-1 EM REVO-1 285-FN (01-39) Ed 1-128'E-FN (OM-39) 2rE-FN (W-21A) C 1-128'E4FN (W-21A)
V041 pEV0-1 REVD-1
- REVD-I l REVO-11 pPS REV0-1
)DPS REVO-1 lB) OPS REV0-1 BD)
OPS REVO-1 l8D) OPS REVO-1 REVO-2 M REVO-2 WUT REVI-1 CAUT REVI-1 375 1 T-8694-R WCC 1 480V IWP 01-128'E-FN (W-21A) CAUT REVI-1 1
10MAY04 10MAY04 00:00 00-59 792 Run Date 09MAY04 13:39w LT403 STANDARD PUBLICATION Sheet 21 of 23 o Prlmavera Systems, Inc.
I FL.03 Execution Publication Set I
after 09MAY04 12:00 I
U1R28 WORKING SCHEDULE I
after 09MAY04 12:00 lU l I
RESP WO EQID DESCRTION RD ES EF RISK I
MAY I
0 1214161820221 0. 2,4. 6. 8 10112 t4.16,1a20221 0. 2. 4.
S.
8 I Z 1416, 14, 19r71 _ i i
, : "11 376I 0 l T301084R wCC HX-240 I REMOVE TAG (0 VNSSB I 1 10MAY04 I 10MAY HX-240 MM REVO-1) 0IZ00 02:59 7901 377 1 T-7434-R WCC MR 01.128 1 480V MR 01128 2
10MAY04 10MAY04 DR-Y ML-Y 6
1B52-422M (S-80D) 0200 03:59 ORT3-Y R-N 378 1
T-7110 -R WCC TG-01-G 1 TU TG-01-G EM REVS-1 I 10MAY04 10MAY04 4
03:00 03:59 379 0 T201987H WCC W-013A1 HANG TAG (0 VNCSR 1
10MAY04 10MAY04 0
W-13A1 MM REVO-1) 05:00-05:59 380 0 T305618H WCC P-031B-M HANGTAG (O CW I
10MAY04 10MAY04 38 P-31B-M EM REVO-I) 05:00 05:59 381 1
T-8747-R WCC C-41 I RDC C-41 EM REVO-1 I
10MAY04 10MAY04 DR-Y ML-Y 71 06:00 06:59 ORT3-Y R-N 382 1 T-8980-R WCC W-190 OVNBIW-190EM REVOS1 1
10MAY04 10MAY04 0
06:00 06:59 383 0 T201682H wCC HX-281C HANG TAG (O VNBI 1
10MAY04 10MAY04 0
HX-281C MM REMV02) 07:00 07:59 384 2 T-7690-H WCC P-011A 2 CC P-1 1A MM REV0-1 I
10MAY04 10MAY04 0
08:00 08:59 385 1 T-0694-R WCC 01-AM 1 LO 048A OPS REVO-1 1
1OMAY04 10MAY04 0
09:00 09:59 386 1 01994020 WCC SW26A ALIGN BAST & P-0158 2
10MAY04 10MAY04 DR-N ML-N 0
FOR REACTIVITY 09:0 10:59 ORT3-N R-N 387 1 T-8716-R WCC P-15A 1 SI P-15A FLOWPATH 1
10MAY04 10MAY04 364 DSSREV0-1 11:00 11:59 388 1
T-2610-H WCC SI-857A 1 SI S857A EM REV0-1 3
10MAY04 10MAY04 0
11:00 13:59 389 0 T201682R WCC HX-281C REMOVE TAG (0 VNBI I
10MAY04 1OMAY04 780 HX-281C MM REV0-2) 12k00 1k59 390 1 T-9669-R WCC CWSYSTEM I CWCW SYSTEM MM 3
10MAY04 10MAY04 67 REVO-1 1200 14:59 391 0
T201987R WCC W-013A1 REMOVETAG(0VNCSR
.1 10MAY04 10MAY04 778 W-13A1 MM REV4-1) 14:00 14:59 392 2 T-7694-R WCC P-011A 2 CC P-11A MM REV0-1 I
10MAY04 10MAY04 0
15:00 15:59 393 1 T-8926-H WCC FS-2852 I SW FS-2852 MM 1
10MAY04 10MAY04 0
REV2-1 17:00 17:59
- r. 01084R REMOVE Ti
.7434-R I 480V MR 1017434E1 480V I T-7110 R1TUTGC 001711031 TUTO T201987HHANG T305618HHANG I
T-87474R1 RD 001874711 F T-8980-R0 VN 0008980u T201682HHA T.7690-H 2 00176903 T-0694-R 0010694 0199-020 T-871 0018' T-261 00121 T201 T-9(
000 T.9 AG (0 VNSSB HX-24 1-128 1852-422M (!
IR 01-128 1B52-422 1-G EM REVS-1 41-G EM REVS-1 TAG (0 VNCSR W-1 TAG (0 CW P-31EIA C-41 EM REVO-1 DC C-41 EM REV4-3IW-190EMREVO-1G TAG (0 VNBI HX CC P-11A MM REV(
2CCP-11AMMREI I LO 0-48A OPS RE 11LO OI48A OPSI U-IGN BAST & P41 E l SISm826ACTI MR1 SI P-15A FLOY
1St Sl-857A EM
- 10_1 SIS857 i82RREMOVE TAG I
69)R CW cw SYS:
~669_1 CWCW 01987RREMOVET I
T-7690-R 2 CC PIl1 001769012CC P-T.892MH 1 SW I 001892831 SY T301009HHANG I
t MM REVO-1) 18600) OPS REVO-A (SI-8600) OPS RE MAi MM REVO-1)
EM REVO-1) 281C MM REVO-2)
-1 VO-1 bEV0-I 59 FOR REACTIVIT
)PS REVS-1
'PATH DSS REVO-1 WPATH DSS REVO-EM REVO-1 pVNBI HX-281C MI tEM MM REV0-1 SYSTEM MM REVO 0G (0 VNCSR W-13i A MM REV0-1 IA MM REVO-I S-2852 MM REV2-1 TFS-2852 MM REV2 TAG (2 CV F-39A IC j FLOWPATH I REVO-2)
I 1 MM REWVSI)
I REV 0-1) 3941 2 T301009H WCC ICP-06.021 HANG TAG (2 CV F-39A IC REV 0-1)
I 10MAY04 10MAY04 17:00 17:59 0
Run Date 09MAY04 13:391 LT-03 STANDARD PUBLICATION Sheet 22 of 23 O Ptimaver Systems, Inc.
I FL-03 Execution Publication Set I
after 09MA Y04 12: 00 U1R28 WORKING SCHEDULE I
after 09MAY04 12:00
RiSK IMF Stm9 MAYn1tTt1 I
I I
STk_1,0t1t2.I4,1612o,22 0.2 2 4 6. 8.1012,14,16.18,20,2210. 2. 4. 6. 8.10tJ2.14.16, N,,es"] ; I Z@S191;wel 4
- i a !!
3951 1 T-1762-R wC SC-953 1 SC SC-953 MMV REV0-1 2
10MAY04 10MAY04 20:00 21:59 91 395 1 T-0460-R WCC MS-5958 I MSMS-59581CREVD-1 2
10MAY04 10MAY04 0
22:00 23:59 397 1 T-261O-R WCC S-857A ISISI-857AEMREVO-1 2
11MAY04 11MAY04 0
01:00 02:59 398 1 T-7043-R WCC P-028A-M i CS P-28A-M EM REV0-1 I
11MAY04 11MAY04 DR-Y ML-Y 0
04:00 04:59 ORT3-Y R-N 399 1 T-7047-H WCC P-02A-M I CS P-28A"M EM REV1-1 1
11 MAY04 11MAY04 DR-Y ML-Y 0
04:00 04:59 ORT3-Y R-N 400 1 T40964-H WCC 621A01 I MRR 62VA01 RMP 1
11MAY04 11MAY04 0
9302-1 EM REVO-t 05:00 05:59 401 0
T201265H WCC Z-015 HANG TAG (O Z Z.1 5 MM 1 11MAY04 11MAY04 0
REVO-5) 05:00*
05:59 402 0 T405897H WCC D-106 HANGTAG(0125VD-106 2
11MAY04 1IMAY04 0
EM REV 0-2) 05:00 06:59 403 1 T-2071-R WCC W-4A/B 1 VNRCW-4AIB EM I
11MAY04 11MAY04 265 C
REVO-1 08 00 08:59 404 1 T-7047-R WCC P-028A-M I CS P-28A-M EM REVIt-1 1 1MAY04 1 1MAY04 DR-Y MLY 52 0900 09 59 ORT3-Y R-N 405 0 T201265R WCC Z-015 REMOVE TAG (O Z Z-15 1
11MAY04 11MAY04 758 MM REVO-5) 10 00 10 59 406 1 T-7144-R WCC FM-03110 I FW FM-31 1O IC REVO-t 1
11MAY04 11MAY04 226 11:00 11:59 407 1
T-0964-R WCC 62IOt1 1 MRR 6VA01 RMP 1
11MAY04 11MAY04 DR-YML-Y 0
9302-1 EM REVO-1 12.00 12:59 ORT3-Y R-N 408 1
T-8932-R WCC SC-00955 1 SC SC-95 MMV 2
11MAY04 11MAY04 DR-YML-Y 0
REV0-1 12:00 13:59 ORT3-N R-N 409 1
T.7151-R WCC 1F52.122 1 345KV 1F52-122 APS 1
11MAY04 11MAY04 DR-YML-Y 0
REV4-1 13:00 13:59 ORT3-Y R-N 410 1
T-8968-H WCC Y-4 Y Y-4 EM REVI.1-1 I
11MAY04 11MAY04 DR-N ML-N 0
14:00 14:59 ORT3-N R-N 411 1
T-2709-R WCC MS-2018 1 MS MS-2018 MMV I 11MAY04 11MAY04 11 I
REV0-1 16:00 16:59 I C I C 1 MARR 62/A01 I I T.1762-R1 00117621 T.0460.
00104 T-Oi S P-28A-M EM REV S P-28A-M EM REB T-0964"H RMP 9302-1 EM RE T20121 T405897HH 1 VNRC W4A/3E I CS P-28A-M T201265S 1 FW FM-4 T-0964-Ri ARR 62A01 RMP94 1 SC SC-!
T-7 1345KV1F5 1 MS T-CSC-953 MMV RE 1 SC SC-953 MM%
I MS MS-5958 IC I MS MS-5958 10-R 1 SISW857A 112610-t Sl S-8 T.7043-R 1 CS P-:
t-100170431 T.7047-H1 CS P-2 1.100170471 MRR 62VA01 RMP 9 1 00109641 SR HANG TAG (OZ Oi kNG TAG (0125V D I
r-2071R 1 VNRC W AREVO-100120711 T-7047-R1 CS P:2 TM REV 0017047 REMOVE TAG (0 Z T.7144-R1 FWF?
110 IC REVO-10017 MRR 621A0t RMP 9 32-1 EM REVO-I 001 T.8932-R 1 SC SC 55 MMV REVO-1 001 151.R 1 345KV 1F52 t-122APS REV4-10i T-8968-HI Y Y Y4 EM REVt.1.1 r.270s I MS MS.?
MS.2018 MMV REV 778i 1 345KV F89 V0.1 REVO-1 tEVO.1 IC REV0 1
- M REVO-1 AEM REV0-t BA-M EM REV0-'
A-M EM REVI-1 102-1 EM REVO-1 C-15 MM REV0-5 106 EM REV 0.2 4AIB EM REV0.1 A-EM REVI-1 r.15 MM REV0.E 1-3110 IC REVO01 1"s 102-1 EM REV0.1
)55 MMV REVO.1 59323 122 APS REV4.1 171511 Y.4 EM REVI.1-1 0189681 118 MMV REVO-I 1.1 00127091 112 APS REVO.1 00137783 4121 1 T-3778-H wCC F89-112 1 345KVF89112APS 2
REVO 1 11MAY04 11MAY04 17:00 18:59 13 II I
I Run Date 09MAY04 13:39l LT.03 STANDARD PUBLICATION Sheet 23 of 23 C PtmaseraSystems, Inc.
I FL.03 Execution Publication Set