Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051950195
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/09/2004
From: Matthew Meyer
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051950195 (3)


Text

M KC/

g-lq I Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

May 9,2004 Time:

0230 Preparer:

Michael R Meyer U

I R

28 NOTE:

Refer to base procedure NP 10.3.6for safety assessment checklist KSFdefinitons.

NOTE:

Wheneverfuel has been removedfrom the reactor vessel and refueling cavity, all key safetyfunctions are GREEN except spentfuelpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration - 3008 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Cavity Boron concentration = 3005 ppm Subtotal Condition RED ORANGE

<=SY (0-1) 1 (0-2) 2 (0-1) 1 (0-1) 1 0-1 2

3-4 5

Subtotal =

5 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 1 2

3.

Number of trains RHR available (0-2) 1 3

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TEMP =81F; 36 days shutdown, Subtotal =

3 RCS Level = Refueling Height RCS Time to Boil 36 hrs (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

A and 345 kV levels)

(0-2) 2 4-5 GR D

2.

G-0I or G-02/A-05/B-03 available (0-1)

I G-03 or G-04/A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor iessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 1 Subtotal = - 5 INVENTORY Subtotal Condition 0-1 RED

1.

Pressurizer level 220 percent w/head on (0-1) 0 2

ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 3 3

W

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

CGEEN

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 0 Subtotal=

4 PBF-1562 Rcvision2 10/30/02 M*oWwkscrQndwwdelet n a=rc*

wkhX f Froodom of kiformahon Ad Az 9g Pao&1 of 9 W~~~t, 4k C)-d m

References:

NP 10.3.6 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.1.D) {Containment Operable) JITS TS 3.6.1} set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut

( or 4) 0 (O or 2) 2 (0-1) 1 Subtotal 0

l 2-3 4-5-6 Condition RED ORANGE E;-N>MQ (0-1) 1 Subtotal =

4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 Independent offsike power source during periods of single X-03 or X-04 availability (*).

1.

"A" SFP cooling pump available with power available from:

G-02 or G-0 I via 2B-32 an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via IB-42

.{*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil a 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SFP Temperatures:

NW NA

'F SE NA

'F SFP Average Temp NA OF SFP Time to Boil NA Subtotal 0-1 2

3 4-5 Condition RED ORANGE YELLOW GREEN (0-1)

NA (0-1)

NA (0-1)

NA (0-1)

NA (0-1)

NA Subtotal -

NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

G-0 1, Emergency Diesel Generator is returned to service and is PROTECTED.

PBF-1562 Revision 2 10130/02

References:

NP 103.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

May 9, 2004 TIME:

0230 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

GREEN YELLOW GREEN GREEN GREEN NA PROTECTED EOUIPMENT:

COMMENTS:

1 \\

RCS Time to Boil is 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF-1562 Revision 2 10130/02

References:

NP 103.6 NP 10.2.1 Page 5 of 9