ML051950184

From kanterella
Jump to navigation Jump to search
Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051950184
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/08/2004
From: Bennett K
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051950184 (3)


Text

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

Mav 8. 2004 Time:

1430 Preparer:

Kevin I Bennett U

I R

28 NOTE:

Refer to base procedure NP 10.3.6for safety assessment checklist KSF definitions.

NOTE:

W11heneverfifel has been removed from the reactor vessel and refueling cavity, all key safety functions are GREEN except spentfuel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration = 3008 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Cavity Boron concentration = 3005 ppm Subtotal Condition RED ORANGE S'rlffllQ (0-1) 1 (0-2) 2 (0-1) 1 (0-1) 1 0-1 2

3-4 5

Subtotal =

5 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 1 2

1

3.

Number of trains RHR available (0-2) 1 3

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TENIP =81F; 35 days shutdown, Subtotal =

3 RCS Level = Refueling Height RCS Time to Boil 35 hrs (Applicable at Cold or Refueling Shutdown)

PONVER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

and 345 kV levels)

(0-2) 2 4-5

2.

G-0l or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1)

I Subtotal =

5 INVENTORY Subtotal Condition 0-1 RED

1.

Pressurizer level 220 percent W/head on (0-1) 0 2

ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 3 3

-0; aV

3.

RCS level above REDUCED INVENTORY (0-1) 4EE

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 0 Subtotal =

4 PBF-1562 Revision 2 10/30/02 k*=ma non kit m rcdw deftu hi a e w Freeftdom of knforma~on Ac=

I Page I of 9

References:

NP 10.3.6 NP 10.2.1

Point Beach Nucicar Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.A.D) {Containmcnt Operable) (ITS TS 3.6.1) set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least onc SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0

( or 2) 2 (0-1)

I SubtotW :

Condition 0

RED I

ORANGE 2-3

_yQL~

4-5-6 C

m (0-1)

I Subtotal =

4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 independentoffsite powersource during periods of single X-03 or X-04 availability ().

1.

"A" SFP cooling pump available with power available from:

G-02 or G-01 via 2B-32

-(*) an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via IB-42

-(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Subtotal 0-1 2

3 4-5 Condition RED ORANGE YELLOW GREEN (0-1)

NA (0-1)

NA (0-1)

NA (0-I)

NA (0- 1) NA Subtotal =

NA SFP Temperatures:

NW NA 0F SE

_NA OF SFP Average Temp NA SFP Time to Boil NA OF GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

"B" RHR Heat Exchanger no longer available due to IB04 PMT.

PBF-1562 Revision 2 10/30/02

References:

NP 10.3.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

May 8, 2004 TIME:

1430 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

GREEN YELLOW GREEN GREEN GREEN NA PROTECTED EOUIPMENT:

I COMMENTS:.

RCS Time to Boil is 35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br /> Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency

1-PBF-1562 Revision 2 10/30/02 Refrences: NP 10.3.6 NP 10.2.1 Page 5 of 9