Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051950168
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/07/2004
From: John Hanna
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051950168 (3)


Text

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

May 7, 2004 Time:

0200 Preparer:

James H. Hanna U

I R

28 NOTE:

Refer to base procedure NP 10.3.6for safety assessment checklist KSFdefinifions.

NOTE:

Wheneverfuel has been removedfrons the reactor vessel and refueling cavity, all key safetyfiunctions are GREEN except spent fiel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration = 3017 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Cavity Boron concentration = 3003 ppm Subtotal Condition RED ORANGE (0-1) 1 (0-2) 2 (0-1) 1 (0-1) 1 0-1 2

3.4 5

Subtotal=

5 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 1 2

ORANGE

3.

Number of trains RHR available (0-2) 2 3

A L

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TEM4P -81F; 34 days shutdown, Subtotal 4

RCS Level = Refueling Height RCS Time to Boil 35 firs (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition I.

Independent off-site pouer sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

and 345 kV levels)

(0-2) 2 4-5

2.

G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 1 Subtotal 5

INVENTORY Subtotal Condition 0-1 RED

1.

Pressurizer level 220 percent w/head on (0-1) 0 2

ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 3 3

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 0 Subtotal=

4 I n f m ~ w b ~ 6 e m v v s ~

), ~ i go}/'

7 PBF-I 562 Revision 2 10/30/02 W~ MI.hlIAK&"

HIl MIW17 lVAA.R W WQV?V&

.UII inaccordnce hie Freedom of Intrmabon AcL exempW Nag+

P of 9

/ES~O0:2 9I Sk M - --b T

References:

NP 10.3.6 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 1S.1.D) {Containment Operable) {ITS TS 3.6.1) set

2.

Containment Closure CL-I E maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1) 1 Subtotal 0

l 2-3 4-5-6 Condition RED ORANGE (0-1) 1 Subtotal =

4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 independent offsile power source during periods of single X-03 or X-04 availability (*).

1.

"A" SFP cooling pump available with power available from:

G-02 or G-0I via 2B-32

-(*) an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via I B-42

-(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Subtotal 0-1 2

3 4-5 Condition RED ORANGE YELLOW GREEN (0-1)

NA (0-1)

NA (0-1)

NA (0-1)

NA (0-1)

NA SFP Temperatures:

NW NA 0F SE NA 0F SFP Average Temp NA SFP Time to Boil NA Subtotal =

NA OF GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

PBF-1562 Revision 2 10/30/02

References:

NP 10.3.6 NP 10.2.1 Page 2 of 9

I Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

May 7, 2004 TIME:

0200 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

-CONTAINMENT:

SFP COOLING:

GREEN GREEN GREEN GREEN GREEN NA PROTECTED EQUIPMENT:

COMMENTS:

M RCS Time to Boil is 35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br /> Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF-1562 Revision 2 10/30102

References:

NP 10.3.6 NP 10.2.1 Page 5 of 9