U1R28 OCC Interactive Turnover with Handwritten Notations
ML051950161
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/07/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051950161 (5)


Text

V Committed to NucIear EirceIlenco_.P Point Beach Nuclear Plant U11R28 OCC Interactive Turnover Meeting Agenda Friday, May 7, 2004 Start Time: 0600 NSB Cafeteria BRIEFING NOTES ATTENDEES - / 6 . Vii / e F/Z' ir &CW7-1tl's Shift Outage Directors Shift Outage Managers (SOM) '/0A/ Blke ()r9 W.7 CfF~IJt VL:-

Operations Coordinators (SOC)

Maintenance Coordinators (MOC) - fRV u? wl" 4/, mp Engineer/ Projects Coordinators (EOM)

Rad Protection Manager (RPM) 0(d 2 6 .3 Ir J)

Site Safety Coordinator (SSC)

Shutdown Safety Assessor (SSA)

Site Management (SSM)

General Supervisors First Line Supervisors Agenda

1. Safety Issue Discussion (SSC)
2. Radiation Protection (RPM)
3. Operations Coordinator Turnover (SOC)
4. Shutdown Safety Assessment (SSA)
5. Maintenance Coordinator Turnover (MOC)
6. Engineering Coordinator Turnover (EOM)
7. Major Projects Update (EOM)
8. Schedule Review (SOM)
9. Management Expectations (SSM)
10. ACEMAN Assessment Results (SOM)
11. Shift Goals (SOM)

Items Included In Daily Package:

- Site Communication

- Safety Snippet

- Outage Alara Report

- Outage Status Report

- Shutdown Safety Assessment

- Defined Critical Path

- Work Activity Risk Assignment

- Outage in ft d -1 ina s Wifht ft Frqqdom of jul 1

Committed to Nuciear Erccllencc OF P rrBRH*

UIts2 Point Beach Nuclear Plant UlR28 Refueling Outage Safety Topics for week of May 2 -8, 2004 Theme for the week This week's theme is Hand Protection. During the last week of April, there were a lot of minor hand injuries reported. Although we have come a long way in the last few years, we still have not eliminated hand Injuries. It is time we hand protection to the next level.

Daily Safety Snippets Sunday "It's difficult to grip when your finger gets snipped" Could you imagine doing your job without your hands? We tend to take it too much for granted that we have two hands at our command, immediately ready to do what we want them to. They not only perform amazing manual tasks, but they also make us money. Just ask anyone who has lost the use of his or her hands.

Monday "Concerning fingers, do not ignore: Cut one off and youll grow no more" Limmerk 1999, While lowering a 20001b. flow diffuser from the high pressure turbine, a worker lost a substantial portion of one finger when the cribbing and Jack used to support the diffuser failed and pinned the worker's hand between the diffuser and an I-beam used as part of the cribbing.

Tuesday "Safety gloves worn Is a hand not torn" OE12632 Davis Besse, While performing a search, a security officer ran his hand between the front and back seat of a vehicle. A utility knife with the blade partially open cut the leather outer covering of the search glove, but the Kevlar liner gloves the officer had on protected his hand and prevented a serious injury.

Wednesday "Where danger lingers, watch your fingers" Workers need to know accidents can happen in the strangest ways. Some accidents are simply bizarre. Others happen when no hazard is apparent. Doors were the source of more than 10,000 hand injuries a year In the US. Vending machines caused more than 100 lost-day hand injuries.

And 52 workers injured their hands while walking, according to the statistics.

Thursdav "Practice safety until It fits like a glove" Do you consider gloves as much a part of your normal PPE as your hardhat, safety glasses, and hearing protection? If not, maybe you should be. Always carry a pair of gloves with you when in the plant and use them when operating the valve or picking up scrap metal.

Friday "A finger tip - don't leave work without theml" On April 4, 2001, a contract employee at Braidwood Station suffered a fractured right hand when an electric hoist disengaged from a crane hook and fell on to the new fuel storage rack. The electric hoist was being used to drag test new spent fuel racks being installed at the station. Workers attached a load cell and the electric hoist to the auxiliary hoist of the fuel building overhead crane, and then connected the electric hoist to a test gage. As the crane operator lowered the auxiliary hook, the test gage hung up on the fuel rack and caused the rigging to move laterally. The electric hoist became disengaged because the safety latch on the auxiliary hook was not used.

Saturdav "It's no hand live... Proper gloves protect all five" OSHA 1910.138(a): General requirements. Employers shall select and require employees to use appropriate hand protection when employees' hands are exposed to hazards such as those from skin absorption of harmful substances; severe cuts or lacerations; severe abrasions; punctures; chemical burns: thermal burns; and harmful temperature extremes.

2

Point Beach Nuclear Plant Outage 1R28 Path Picture DAY 32 _ i)o_

Meets Supporting Operational Excellence Outaae Radiation Performance I W* LflJU l I..V 19 1,A--#

VLu ~C-A. _

I This indicator measures cumulative dose radiation exposure and jDay 32 - May 5 1 Actual = 1.723 total number of personnel-contamination events (PCE's > 5000 Cumulative = 52.827 cpm) during refueling outages. The dose indicator is measured in Cumulative Forecast = 60.988 Rem and individual PCE events.

Daily dose and PCE goals reforecasted on 4/23.

Meets: <=75 Rem Actual Cum. PCE #8 on 5/5, individual performing disassembly of valve I SC-953 was Exceeds: <=71 Rem Dose: 52.827 Rem found to have 6,000 ncpm contamination on modesty bottom.

Imeets: <= 18 Exceeds: <= 12 Actual PCE's: -

Co3 Stu Thomas I Personnel Contamination Events Cummulative Dose Exposure 20 - s0 .. ........

i 18 wlwwmwr

.I-

,_ . I 16 I -

.I ii I60 -4Actual wC 14 0 F

0

,..I  !!1 a:

E 12 00 C5 10 Forec"s 40

  • o;**J -GGoal 0

I.I a)

P 8 C106 GMME U.I 6

2 0 4 20 2

0 To I 0 2 4 6 8 101214161820222426283032343638404244464850 0 2 4 6 8 1012141618202224262830323436384042

Co-nnrnitedloNuceciear, I"~

Outage Status Report Plant: Point Beach Unit 1 Day: Friday Today's Date / Time: 5/07/04 0330 Outage Duration: Day 5:<34 Of Refueling Outage Number U1R28 Safety Status Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0 First Aid cases 0 Significant near misses 0 Total for this outage I Summary:

Radiological Dose to date 52.827 Projected to date

  • 60.988 Outage Goal 575 R Difference -8.161
  • Reforecast on 4/23 Number of PCEs 8 Summary:

Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0 Summary:

Plant Status Mode: E Hot Standby (Mode 3) E Hot Shutdown (Mode 4) .] Cold Shutdown (mode5) 0 Refueling Shutdown (Mode 6)

RCS: Temperature: t81 Pressure: Vented to Atmosphere RV Level: Refueling Height Time to Boil: :35 hlours Shutdown Safety Assessment Protected Equipment:

Major Activities Completed In Last 24 Hours Critical Path and Near Critical Path Activities (ext 24 Hours)

  • IB-42 MCC Horizontal Bracing
  • IB-42 MCC Bucket Work
  • Under Head Equipment Setup

. Radiography on T-26 Blowdown Tank

  • Restoration of 1 -42
  • IP-15B SI Pump Seal Repair
  • Reactor Head Repair
  • S1 System LRPM Testing Significant Outstanding Issues Date Issue Due - Responsibility 4/28/04 IW-3B Shroud Fan Backdraft Damper FME 5/09/04 Terry Guay 5/03/04 Reactor Vessel Head Repair Penetration #26 5/16/04 Jim Schweitzer Upcoming Ma or Milestones Scheduled Actual Scheduled Actual Date Time Date Time Date Time Date Time Cooldown <2000 4/03/04 2100 4/03/04 2230 RCS Fill & Vent 4/23/04 1500 Head Lift 4/09/04 0900 4/21104 1550 Heatup >2000 4/25/04 0900 Refueled 4/14/04 0300 5/02/04 1848 Reactor Critical 4/28/04 0800 RV Headset 4/18/04 1900 On-Line 4/30/04 0100 _

4

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: 1 DATE: May 7, 2004 TIME: 0200 KEY SAFETY FUNCTIONS:

REACTIVITY: GREEN CORE COOLING: GREEN POWER AVAILABLE: GREEN INVENTORY: GREEN CONTAINMENT: GREEN SFP COOLING: NA PROTECTED EOUIPMENT:

COMMENTS:

RCS Time to Boil is 35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br /> VIPU Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF-1562

References:

NP 10.3.6 Revision 2 10/30/02 5 Page 5 of 9 NP 10.2.1