Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

May 4. 2004 Time:

0300 Preparer:

T. R. Branam U

I R

28 NOTE:

Refer to base procedure NP 10.3.6for safety assessmnent checklist KSFidefinitions.

NOTE:

Wieneverfiuel has beent removedfront the reactor vessel and refueling cavity, all key safeotyfunctions are GREEN except spentfitel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = 1 through 4 REACTIVITY

1.

RCS Boron concentration = 3012 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRIM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Cavity Boron concentration = 3015 ppm Sut Subtotal Condition RED ORANGE (0-1) 1 (0-2) 2 (0-1) 1 (0-1) 1

)total =--

5-0-1 2

3-4 5

CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 1 2

A A

3.

Number of trains RHR available (0-2) 1 3

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TENMP 83F; 31 ldays shutdown, Subtotal =

3 RCS Level = Refueling Height RCS Time to Boil 33 li rs (Applicable at Cold or Refueling Shutdown)

PO ETR AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

and 345 kV levels)

(0-2) 2 4-5

2.

G-0I or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2Ž23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil > 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 1 Subtotal 5

INVENTORY

1.

Pressurizer lcvcl >20 percent w/head on 2.

3.

4.

Refueling Cavity filled (see definition)

RCS level above REDUCED INVENTORY Makeup from VCT/BLENDER and/or RWST available (0-1) 0 (0-3) 3 (0-1) 1 Subtotal 0-1 2

3 4

Condition RED ORANGE (0-2) 0 Subtotal =

4 PBF-1562 i acodan wih Me FreAdom of iWmYM Revision2 10/30/02 Ad,xex e

e I of 9 FCIIx/

E8;7 Rererences: NP 10.3.6 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.1.D) {Containment Operable) (ITS TS 3.6.1} set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1) 1 Subtotal 0

2-3 4-5-6 Condition RED ORANGE C

RE (0-1) 1 Subtotal =

4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 Independent offstle power source during periods of single X-03 or X-04 aalilability (*).

1.

"A" SFP cooling pump available with power available from:

G-02 or G-0 I via 2B-32

-(*) an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via IB-42

.(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Subtotal 0-1 2

3 4-5

.Condition RED ORANGE YELLOW GREEN (0-1)

NA (0-1)

NA (0-1)

NA (0-1)

NA (0-I)

NA SFP Temperatures:

NW NA OF SE NA OF SFP Average Temp NA SFP Time to Boil NA Subtotal =

NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

1P-IOA returned to service.

Containment Sump B Screen re-installed.

PBF-I 562 Revision 2 10/30/02 Recfcrcnccs: NP 10.3.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

May 4, 2004 TIME:

0300 KEY SAFETY FUNCTIONS:

REACTIVITY:

GREEN CORE COOLING:

YELLOW POWER AVAILABLE:

GREEN INVENTORY:

GREEN

--CONTAINMENT:-

GREEN --

SFP COOLING:

NA.

PROTECTED EQUIPMENT:

COMMENTS:

4, RCS Time to Boil is 33 hours3.819444e-4 days <br />0.00917 hours <br />5.456349e-5 weeks <br />1.25565e-5 months <br /> Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency

-Jo PBF-1562 Revision 2 10/30/02 Rcferences: NP 10.3.6 NP 10.2.1 Page 5 of 9