Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051940616
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/02/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051940616 (3)


Text

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

Mlav 2. 2(04.

Time:

1400.

Preparer:

John Olvcrai U

I R

28 NOTE:

Refer to base procedure NP 10.3.6 for safety assessment checklist KSF definitions.

NOTE:

Wheneverfiuel has been renzovedfrom the reactor vessel and refueling carity, all key safety finctions are GREEN except spent fiel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Ycs/True = I through 4 REACTIVITY

1.

RCS Boron concentration = 3006 pppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Cavity Boron concenitration = 3013 ppm SF1' Boron concentration = 3027 ppm Sul Subtotal Condition RED Eoi (0-1) 1 (0-2) 1 (0-1) 0 (0-1) 1 0-1 2

3-4 5

Itotal =

3 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 1 2

3.

Number of trains RHR available (0-2) 1 3

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TFHAII =80F; 29 davs shutdown.

Subtotal =

3 RCS Level = Refueling tleight RCS Time to Boil 27 hlrs (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

and 345 kV levels)

(0-2) 2 4-5

2.

G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-041A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 223 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 1 Subtotal =

5 INVENTORY Subtotal Condition

1.

Pressurizer level 220 percent w/head on 0-l RED (0-1) 0 2

2.

Refueling Cavity filled (see definition)

(0-3) 2 3

YELv

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 0 Subtotal =

3 PBF-1562 Revision 2 Informaton in mis record was deleted in accordance With the Freedom of Inlormiabon 10130/02 ACt, eXmpi Page I of 9 ie¢ s/e e5 a Refernces: NP 10.3.6 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.l.D) {Containmcnt Operable) (ITS TS 3.6.1 ) set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out e

OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1) 0 Subtotal 0

2-3 4-5-6 Condition RED C YELLOW)

(0-1) 1 Subtotal =

3 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 independent offsite power source during periods of single X-03 or X-04 availability (*).

1.

"A" SFP cooling pump available with power available from:

G-02 or G-0 I via 2B-32

-(*) an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via 1B-42

-(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Subtotal 0-1 2

3 4-5 Condition RED ORANGE

.. X"0Q.

Q00 (0-1)

I (0-1)

I (0-1) 1 (0-1) 1 (0-1) 0 Subtotal =

4 SFP Temperatures:

NNV XX

°F SE 78 OF SFP Average Temp 81)

SFP Time to Boil 22.0 l-rs OF GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE: None LOOK AHEAD:

1. Sump1'BScrcens will le removed 51/204. This SD safety assessment assurmes this condition exists.
2.

Only one train of RII is availal)e during til IlT-5301) testing.

3.

Wl'ill commiiencc using 1.3 factor for time to boil aihei core reload is complete.

PBF-1562 Revision 2 1030/02

References:

NP 10.3.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

May 2, 2004 TIME:

1400 KEY SAFETY FUNCTIONS:

REACTIVtITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINME NT:

SFP COOLING:

YELLOW YELLOW GREEN YELLOW YELLOW GREEN COMMENTS:

j RCS Time to Boil is 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> O

SF1' Time to Boil is 22.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> (fijli core ol1-load is assumed)

Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF-1562 Revision 2 10/30202

References:

NP 10.3.6 NP 10.2.1 Page 5 of 9