Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: Mlav 2. 2(04. Time: 1400. Preparer: John Olvcrai U I R 28 NOTE: Refer to base procedureNP 10.3.6for safety assessment checklist KSF definitions.

NOTE: Wheneverfiuel has been renzovedfrom the reactorvessel andrefueling carity, all key safetyfinctions are GREEN except spent fiel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Ycs/True = I through 4 REACTIVITY Subtotal Condition

1. RCS Boron concentration = 3006 pppm a.) For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.) For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1 0-1 RED
2. Number of boration paths (0-2) 1 2
3. No fuel motion (0-1) 0 3-4 Eoi
4. SR instrumentation operable (0-1) 1 5 Cavity Boron concenitration = 3013 ppm SF1' Boron concentration = 3027 ppm Sul Itotal = 3 CORE COOLING Subtotal Condition
1. Number of SG available for DHR (0-2) 0 0-1 RED
2. Refueling cavity filled (0-1) 1 2
3. Number of trains RHR available (0-2) 1 3
4. RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TFHAII =80F; 29 davs shutdown. Subtotal = 3 RCS Level = Refueling tleight RCS Time to Boil 27 hlrs (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1. Independent off-site power sources I RED available to A-05 and A-06 (totally 2 ORANGE independent at the 4160 V, 13.8 kV, 3 and 345 kV levels) (0-2) 2 4-5
2. G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-041A-06/B-04 available (0-1) 1
3. G-05 available, Reactor Cavity filled to 223 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 1 Subtotal = 5 INVENTORY Subtotal Condition
1. Pressurizer level 220 percent w/head on 0-l RED (0-1) 0 2
2. Refueling Cavity filled (see definition) (0-3) 2 3 YELv
3. RCS level above REDUCED INVENTORY (0-1) 1 4
4. Makeup from VCT/BLENDER and/or RWST available (0-2) 0 Subtotal = 3 Informaton in mis record was deleted PBF- 1562 inaccordance With the Freedom of Inlormiabon Refernces: NP 10.3.6 Revision 2 10130/02 ACt, eXmpi - Page I of 9 NP 10.2.1 ie¢ s/e e5 a

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT Subtotal Condition

1. Containment integrity (TS 15.l.D) {Containmcnt 0 RED Operable) (ITS TS 3.6.1 ) set (O or 4) 0
2. Containment Closure CL-IE maintained 2-3 C YELLOW) and closure < time to boil (O or 2) 2 4-5-6
3. No fuel motion (0-1) 0
4. DHR Capability:

- cavity flooded and internals out e OR

- at least one SG available OR

- one fan cooler with Equip hatch installed and personnel hatches capable of being shut (0-1) 1 Subtotal = 3 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE: Take creditfor only one P-12 independent offsite power source duringperiods of single X-03 or X-04 availability (*).

Subtotal Condition

1. "A" SFP cooling pump available 0-1 RED with power available from: 2 ORANGE

- G-02 or G-0 I via 2B-32 (0-1) I 3 .. X"0Q.

-(*) an independent off-site power source different than that for 4-5 Q00 Train B below (0-1) I

2. "B" SFP cooling pump available with power available from:

- G-03 or G-04 via 1B-42 (0-1) 1

-(*) an independent off-site power source different than that for Train A above (0-1) 1

3. Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 0 SFP Temperatures: Subtotal = 4 NNV XX °F SE 78 OF SFP Average Temp 81) OF SFP Time to Boil 22.0 l-rs GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE: None LOOK AHEAD:
1. Sump1'BScrcens will le removed 51/204. This SD safety assessment assurmes this condition exists.
2. Only one train of RII is availal)e during til IlT-5301) testing.
3. Wl'ill commiiencc using 1.3 factor for time to boil aihei core reload is complete.

PBF-1562

References:

NP 10.3.6 Revision 2 1030/02 Page 2 of 9 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: I DATE: May 2, 2004 TIME: 1400 KEY SAFETY FUNCTIONS:

REACTIVtITY: YELLOW CORE COOLING: YELLOW POWER AVAILABLE: GREEN INVENTORY: YELLOW CONTAINME NT: YELLOW SFP COOLING: GREEN COMMENTS: j RCS Time to Boil is 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> O SF1' Time to Boil is 22.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> (fijli core ol1-load is assumed)

Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF-1562

References:

NP 10.3.6 Revision 2 10/30202 Page 5 of 9 NP 10.2.1