Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051940610
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/02/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051940610 (3)


Text

I. . K)Rc_-

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: May 2, 2004 Time: 0210 Preparer: James Hanna U - R 28 NOTE: Refer to baseprocedure NP 10.3.6for safety assessment checklist KSF definitions.

as ee re oedfom il recto vsse ad rfei NOE: f lenltefiel cvt lKysafetbfittitiosas GREEN except spentfuelpoolcooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY Subtotal Condition

1. RCS Boron concentration = 3004 ppm a.) For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.) For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1 0-1 RED
2. Number of boration paths (0-2) 1 2
3. No fuel motion (0-1) 0 34
4. SR instrumentation operable (0-1) 1 5 Cavity Boron concentration = 3013 ppm SFP Boron concentration = 3027 ppm Subi otal = 3 CORE COOLING Subtotal Condition
1. Number of SG available for DHR (0-2) 0 0-1 RED
2. Refueling cavity filled (0-1) 1 2 QaQL
3. Number of trains RHR available (0-2) 1 3 CtELLON q
4. RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TEMP =80'F: 29 clays shutdons, Subtotal = 3 RCS Level = Refueling lleight RCS Time to Boil 27 li rs (Applicable at Cold or Refueling Shutdown)

POWVER AVAILABILITY Subtotal Condition

1. Independent off-site power sources I RED available to A-05 and A-06 (totally 2 ORANGE independent at the 4160 V, 13.8 kV, 3 and 345 kV levels) (0-2) 2 4-5
2. G-0 I or G-02/A-05/B-03 available (0-I) I G-03 or G-04/A-06/B-04 available (0-1) 1
3. G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 1 Subtotal 5 INVENTORY Subtotal Condition
1. Pressurizer level 220 percent wlhead on 0-1 RED (0-1) 0 2
2. Refueling Cavity filled (see definition) (0-3) 2 3
3. RCS level above REDUCED INVENTORY (0-1) 1 4
4. Makeup from VCTIBLENDER and/or RWST available (0-2) 0 Subtotal = 3 kWtaMon tonsrecod sdetd PBF-1562 inacsc wa do Of Intormaaon

References:

NP 10.3.6 Revision 2 10/30/02 AX,exempt~ Page 1 of 9 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT Subtotal Condition

1. Containment integrity (TS 15.1.D) {Containment 0 RED Operable) {ITS TS 3.6.1) set (Oor 4) 0
2. Containment Closure CL-IE maintained 2-3 C YELLOW) and closure < time to boil (Oor 2) 2 4-5-6
3. No fuel motion (0-1) 0
4. DHR Capability:

- cavity flooded and internals out ¢ OR

- at least one SG available OR

- one fan cooler with Equip hatch installed and personnel hatches capable of being shut (0-1) I Subtotal= 3 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE: Take creditfor only one P-12 independentoffsite power source duringperiodsof single X-03 or X-04 availability (*).

Subtotal Condition

1. "A"SFP cooling pump available 0-1 RED with power available from: 2 ORANGE
  • G-02 or G-01 via 2B-32 (0-1) 1 3 LQW&N

(*) an independent off-site power 4-5 source different than that for Train B below (0-1) I

2. "B" SFP cooling pump available with power available from:

- G-03 or G-04 via IB-42 (0-1) I

-(*) an independent off-site power source different than that for Train A above (0-1) I

3. Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil a 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 0 SFP Temperatures: Subtotal = 4 NW 84 OF SE 80 OF SFP Average Temp 82 OF SFP Time to Boil 20.0 hrs GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE: None LOOK AHEAD:
1. IX04w ork has been rcinoved froi the outage scope per OCC.
2. Sump 'B' Screens will be removed 5/1204. This SD safety assessment assumes this condition exists.
3. Only one train ofRHR is available during the IT-530D testing.
4. Will commence using 1.3 factor for time to boil when core reload is complete.

PBF- 1562

References:

NP 10.3.6 Revision 2 10130/02 Page 2 of 9 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: I DATE: May 2, 2004 TIME: 0200 KEY SAFETY FUNCTIONS:

REACTIVITY: YELLOW CORE COOLING: YELLOW POWER AVAILABLE: GREEN INVENTORY: YELLOW CONTAINMENT: YELLOW SFP COOLING: GREEN COMMENTS:

RCS Time to Boil is 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> SFP Time to Boil is 20.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> (full core off-load is assumed)

Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PIrF-562 Rererences: NP 10.3.6 Revision 2 10/30/02 Page 5 of 9 NP 10.2.1