Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: May 4,2004 Time: 1400 Preparer: Mike LeGreve U I R 28 NOTE: Refer to baseprocedureNP 103.6for saferty assessment checklist KSF definitions.

NOTE: Whenever fuel hasbeen rem ovedfrom the reactor vessel and refueling cavity, all key safety functions are GREENexceetspentfuelpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True I through 4 REACTIVITY Subtotal Condition

1. RCS Boron concentration = 3014 ppm a.) For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.) For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1 0.1 RED
2. Number of boration paths (0-2) 2 2 ORANGE
3. No fuel motion (0-1) 1 3.4 AT T NQW
4. SR Instrumentation operable (0-1) 1 5 Cavity Boron concentration = 3015 ppm Subtotal 5 CORE COOLING Subtotal Condition
1. Number of SG available for DHR (0-2) 0 0-1 RED
2. Refueling cavity filled (0-1) 1 2 ORANGE
3. Number of trains RHR available (0-2) 2 3 A L
4. RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TEMIP =83F; 31 days shutdown, Subtotal 4 RCS Level - Refueling Height RCS Time to Boll 33 hrs (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1. Independent off-site power sources I RED available to A-05 and A-06 (totally 2 ORANGE independent at the 4160 V, 13.8 kV, 3 and 345 kV levels) (0-2) 2 4-5
2. G-0I or G-021A-051B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1
3. G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 1 Subtotal 5 INVENTORY Subtotal Condition
1. Pressurizer level 220 percent wlhead on 0-1 RED (0-1) 0 2 ORANGE
2. Refueling Cavity filled (see definition) (0-3) 3 3 JW
3. RCS level above REDUCED INVENTORY (0-1) 1 4
4. Makeup from VCTIBLENDER and/or RWST available (0-2) 0 Subtotal 4
  • t D .. i b f9Z ~~ L -- -

inaccdancek th Freedom of k&Mft eh PBF-1562

References:

NP 10.3.6 Revision 2 1300102 Ad, I of 9 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT Subtotal Condition

1. Containment integrity (TS 15.1 .D) (Containment 0 RED Operable) {ITS TS 3.6.1) set (Oor 4) 0 ORANGE
2. Containment Closure CL-IE maintained 2-3 and closure < time to boil (Oor 2) 2 4-5-6 dM5
3. No fuel motion (0-1) I
4. DHR Capability:

- cavity flooded and internals out OR

- at least one SG available OR

- one fan cooler with Equip hatch installed and personnel hatches capable of being shut (0-1) 1 Subtotal = 4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE: Take creditfor only one P-12 independent offsitepower source duringperiods of singleX-03 orX-04 availability(*).

Subtotal Condition

1. "A" SFP cooling pump available 0-1 RED with power available from: 2 ORANGE

- G-02 or G-01 via 2B-32 (0-1) NA 3 YELLOW

  • (*) an independent off-site power 4-5 GREEN source different than that for Train B below (0-1) NA
2. "B" SFP cooling pump available with power available from:

- G-03 or G-04 via 1B42 (0-1) NA

(*) an independent off-site power source different than that for Train A above (0-1) NA

3. Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) NA SFP Temperatures: Subtotal = NA NW NA OF SE NA 'F SFP Average Temp NA OF SFP Time to Boil NA GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

"A" Train RHR returned to service.

1B42 power down in progress.

PBFI-1562 Reterenecs: NP 10.3.6 Revision 2 10/30/02 Page 2 of 9 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: 1 DATE: May 4, 2004 TIME: 1400 KEY SAFETY FUNCTIONS:

REACTIVITY: GREEN CORE COOLING: GREEN POWER AVAILABLE: GREEN INVENTORY: GREEN CONTAINMENT: GREEN SFP COOLING: NA PROT'ECTED EQUIPMENT:

IENTS:

RCS Time to Boil is 33 hours3.819444e-4 days <br />0.00917 hours <br />5.456349e-5 weeks <br />1.25565e-5 months <br /> }

Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF-1 562

References:

NP 10.3.6 Revision 2 10/30/02 Page 5 of 9 NP 10.2.1