ML051940598

From kanterella
Jump to navigation Jump to search
Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051940598
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/01/2004
From: Matthew Meyer
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051940598 (3)


Text

  • Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: May 1,2004 Time: 0230 Preparer: Michael R Meyer U I R 28 NOTE: Refer to baseprocedureNP 10.3.6for safet, assessment checklist KSF definitions.

NOTE: Wheneverfuel has been removedfrom the reactor vessel and refueling cavity, all Aey safetyfunctions are GREEN except spenttfuelpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY Subtotal Condition

1. RCS Boron concentration = 3003 ppm a.) For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.) For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1 0-1 RED
2. Number of boration paths (0-2) 1 2
3. No fuel motion (0-1) 0 3-4
4. SR instrumentation operable (0-1) 1 5 Cavity Boron concentration 3013 ppm SFP Boron concentration = 3027 pprm Sul btotal - 3 CORE COOLING Subtotal Condition
1. Number of SG available for DHR (0-2) 0 0-1 RED
2. Refueling cavity filled (0-1) 1 22
3. Number of trains RHR available (0-2) 1 3 MET-1
4. RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TEM1P =78F; 28 days shutdown, Subtotal = 3 RCS Level = Refueling Height RCS Time to Boil 26.5 hrs (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1. Independent off-site power sources I RED available to A-05 and A-06 (totally 2 ORANGE independent at the 4160 V, 13.8 kV, 3 and 345 kV levels) (0-2) 2 4-5
2. G-01 or G-02/A-05/B-03 available (0-1) I G-03 or G-04/A-06/B-04 available (0-1) 1
3. G-05 available, Reactor Cavity filled to 2Ž23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) I Subtotal = 5 INVENTORY Subtotal Condition
1. Pressurizer level 220 percent w/head on 0-1 RED (0-1) 0 2 ORANGE
2. Refueling Cavity filled (see definition) (0-3) 3 3
3. RCS level above REDUCED INVENTORY (0-1) 1 4
4. Makeup from VCT/BLENDER and/or RWST available (0-2) 0 Subtotal = 4 VllrnlM~nftSrecod wxd*Wt~

PBF-1562 in acOdancemGWOtFro~nofOnr~nOM26on

References:

NP 10.3.6 Revision 2 10/30/02 Act, exempb or - 8 . . -R2 e 1 of 9 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT Subtotal Condition

1. Containment integrity (TS 15.1.D) (Containment 0 RED Operable) {ITS TS 3.6.1) set (O or 4) 0.
2. Containment Closure CL-IE maintained 2-3 and closure <time to boil (O or 2) 2 4-5-6 YELO
3. No fuel motion (0-1) 0
4. DHR Capability:

- cavity flooded and internals out ¢ OR

- at least one SG available OR

- one fan cooler with Equip hatch installed and personnel hatches capable of being shut (0-1) 1 Subtotal = 3 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE: Take creditforonly one P-12 Independent offsite power source duringperiods of single X-03 orX-04 availability(*).

Subtotal Condition

1. "A" SFP cooling pump available 0-1 RED with power available from: 2 ORANGE

- G-02 or G-01 via 2B-32 (0-1) I 3 LLQW&

-(*) an independent off-site power 4-5 source different than that for Train B below (0-1) 1

2. "B" SFP cooling pump available with power available from:

- G-03 or G-04 via IB-42 (0-1) 1

.(*) an independent off-site power source different than that for Train A above (0-1) 1

3. Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 0 SFP Temperatures: Subtotal = 4 NW 86 OF SE 82 OF SFP Average Temp 84 OF SFP Time to Boil 20.0 lirs GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE: None LOOK AHEAD:
1. IX04 ivork to be removed outage scope per OCC.
2. Sump 'B' Screen scheduled to be removed on or after 5/1/04. This is not likely to occur on day shift.

INVENTORY will become YELLOW.

PBF-1562

References:

NP 103.6 Revision 2 10/30/02 Page 2 of 9 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: I DATE: May 1, 2004 TIME: 0230 KEY SAFETY FUNCTIONS:

REACTIVITY: YELLOW CORE COOLING: YELLOW POWER AVAILABLE: GREEN INVENTORY: GREEN CONTAINMENT: YELLOW SFP COOLING: GREEN PROTECTED EQUIPMENT:

COMMENTS: \\

RCS Timc to Boil is 26.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> SF1 Time to Boil is 20.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> (full core off-load is assumed)

Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF-1562 Rcfrecnces: NP 10.3.6 Revision 2 10/30/02 Page 5 of 9 NP 10.2.1