Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051940598
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/01/2004
From: Matthew Meyer
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051940598 (3)


Text

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

May 1,2004 Time:

0230 Preparer:

Michael R Meyer U

I R

28 NOTE:

Refer to base procedure NP 10.3.6for safet, assessment checklist KSF definitions.

NOTE:

Wheneverfuel has been removedfrom the reactor vessel and refueling cavity, all Aey safetyfunctions are GREEN except spenttfuel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration = 3003 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Cavity Boron concentration 3013 ppm SFP Boron concentration = 3027 pprm Sul Subtotal Condition RED (0-1) 1 (0-2) 1 (0-1) 0 (0-1) 1 0-1 2

3-4 5

btotal -

3 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 1 22

3.

Number of trains RHR available (0-2) 1 3

MET-1

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TEM1P =78F; 28 days shutdown, Subtotal =

3 RCS Level = Refueling Height RCS Time to Boil 26.5 hrs (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

and 345 kV levels)

(0-2) 2 4-5

2.

G-01 or G-02/A-05/B-03 available (0-1)

I G-03 or G-04/A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2Ž23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1)

I Subtotal =

5 INVENTORY Subtotal Condition

1.

Pressurizer level 220 percent w/head on 0-1 RED (0-1) 0 2

ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 3 3

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 0 Subtotal =

4 VllrnlM~nftSrecod wxd*Wt~

PBF-1562 in acOdancemGWOtFro~nof Onr~nOM26on Revision 2 10/30/02 Act, exempb or 8

R2 e 1 of 9

References:

NP 10.3.6 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.1.D) (Containment Operable) {ITS TS 3.6.1) set

2.

Containment Closure CL-IE maintained and closure <time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out

¢ OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0.

(O or 2) 2 (0-1) 0 Subtotal 0

2-3 4-5-6 Condition RED YELO (0-1) 1 Subtotal =

3 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 Independent offsite power source during periods of single X-03 or X-04 availability (*).

1.

"A" SFP cooling pump available with power available from:

G-02 or G-01 via 2B-32

-(*) an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via IB-42

.(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Subtotal 0-1 2

3 4-5 Condition RED ORANGE LLQW&

(0-1)

I (0-1) 1 (0-1) 1 (0-1) 1 (0-1) 0 Subtotal =

4 SFP Temperatures:

NW 86 OF SE 82 OF SFP Average Temp 84 SFP Time to Boil 20.0 lirs OF GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE: None LOOK AHEAD:

1. IX04 ivork to be removed outage scope per OCC.
2.

Sump 'B' Screen scheduled to be removed on or after 5/1/04. This is not likely to occur on day shift.

INVENTORY will become YELLOW.

PBF-1562 Revision 2 10/30/02

References:

NP 103.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

May 1, 2004 TIME:

0230 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

YELLOW YELLOW GREEN GREEN YELLOW GREEN PROTECTED EQUIPMENT:

COMMENTS:

\\\\

RCS Timc to Boil is 26.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> SF1 Time to Boil is 20.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> (full core off-load is assumed)

Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF-1562 Revision 2 10/30/02 Page 5 of 9 Rcfrecnces: NP 10.3.6 NP 10.2.1