Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: April 2. 2004 Time: 1420 Preparer: Kevin J Bennett U I R 28 NOTE: Refer to base procedure NP 10.3.6for safety assessmnent checklist KSF definitions.
NOTE: WVhjeneverfiuel has been renmoredfrom the reactor vessel and refueling cavity, all key safety finctions are GREEN except spentfiuel pool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = 1 through 4 REACTIVITY Subtotal Condition
- 1. RCS Boron concentration = 2995 ppm (4/27) a.) For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.) For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1 0-1 RED
- 2. Number of boration paths (0-2) 1 2 _c'
- 3. No fuel motion (0-1) () 3.4
- 4. SR instrumentation operable (0-1) 1 5 Cavity Boron concentration = 3016 ppm SF17 Boron concentration = 3027 ppm Sulbtotal = 3 CORE COOLING Subtotal Condition
- 2. Refueling cavity filled (0-1) 1 2 A L
- 3. Number of trains RHR available (0-2) 1 3
- 4. RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TFMII =76TF; 25 days shibitduiv, Subtotal = 3 JCS Level = Refueling 6eight RCS Time to Boil 25.5 hrs (Applicable at Cold or Refueling Shutdown)
POWER AVAILABILITY Subtotal Condition
- 1. Independent off-site power sources I RED available to A-05 and A-06 (totally 2 ORANGE independent at the 4160 V, 13.8 kV, 3 and 345 kV levels) (0-2) 2 4-5
- 2. G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1
- 3. G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 1 Subtotal = 5 INVENTORY Subtotal Condition
- 1. Pressurizer level 220 percent w/head on 0-1 RED (0-1) 0 2 ORANGE
- 2. Refueling Cavity filled (see definition) (0-3) 3 3 A _
- 3. RCS level above REDUCED INVENTORY (0-1) 1 4
- 4. Makeup from VCT/BLENDER and/or RWST available (0-2) 0 Subtotal = 4
.,. 1 B
PBF-1562 injaf rdance with the Freedom of Iraaormafl
References:
NP 10.3.6 Revision 2 10/ 30 /0'A, exemp~ons 4L. Page I of 9 NP 102.1 FO~yW9 2/4-b g
Point Beach Nuclear Plant IBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT Subtptoal Condition I. Containment integrity (TS 15.l.D) I Containment 0 RED Operable) ITS TS 3.6.1) set ( or 4) 0
- 2. Containment Closure CL-IE maintained 2-3 C YELLOW)]
and closure < time to boil (O or 2) 2 4-5-6
- 3. No fuel motion (0-1) 0
- 4. DHR Capability:
- cavity flooded and internals out OR
- at least one SG available OR
- one fan cooler with Equip hatch installed and personnel hatches capable of being shut (0-1) 1 Subtotal = 3 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
NOTE: Take creditfor only one P-12 independent ofisite power source duringperiods of single X-03 or X-04 availability (*).
Subtotal Condition
- 1. "A" SFP cooling pump available 0-1 RED with power available from: 2 ORANGE
- G-02 or G-01 via 2B-32 (0-1) I 3
.(*) an independent off-site power 4-5 Dn4 source different than that for Train B below (0-1) I
- 2. "B" SFP cooling pump available with power available from:
- G-03 or G-04 via IB-42 (0-1) 1
-(*) an independent off-site power source different than that for Train A above (0-1) 1
- 3. Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 0 SFP Temperatures: Subtotal = 4 0
NW 83 F SE 80 OF SFP Average Temp 81.5 OF SFP Time to Boil 21 hrs GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE: None LOOK AHEAD:
- 1. IX04 to be removed from service. Currently on hold due to procedure difficutlies. POWVER AVAILABILITY is-ill remain GREEN. SFP COOLING will become YELLOW.
- 2. Sump 'B' Screcn sclieduled to be removed on 4/28/04. INvrENrTORS' ill become YELIOW.
PBF-1562
References:
NP 10.36 Revision 2 10/30/02 Page 2 of 9 NP 10.2.1
Point Beach Nuclear Plani PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CIIECKLIS'r I: OUTAGE SAFETY ASSESSMENT UNIT: I DATE: April 28, 2004 TIME: 142()
KEY SAFETY FUNCTIONS:
REACTIVITY: YELLOW CORE COOLING: YELLOW POWER AVAILABLE: GREEN INVENTORY: GREEN CONTAINMENT: YELLOW SFP COOLING: GREEN RCS Time to Boil is 23.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> SFP Time to Boil is 21 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br /> (Ciil core orf-load is assumed)
C+
Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF-1562
References:
NP 10.3.6 Revision 2 10/30102 Page 5 of 9 NP 10.2.1