Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051930154
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 04/27/2004
From: Bennett K
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051930154 (3)


Text

r

, I C5-Vc41 Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

April 27.2004 Time:

1430 Preparer:

Kevin J Bennett.

U I

R 28 NOTE:

Referto base procedure NP10.3.6forsafety assessment checklist SFdefinitions.

NOTE:

Weneverfuel has been removedfrom the reactor vessel and refueling cavity, all key safety functions are GREEN except spent fuel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False =0, Yes/True =1 through 4.

REACTIVITY Subtotal Condition

1.

RCS Boron concentration = 3000 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1 0-1 RED

2.

Number of boiation paths (0-2) 1 2

3.

No fuel motion (0-1) 0 3-4

[

4.

SR instrumentation operable (0-1) 1 5

Cavity Boron concentration = 3016 ppm SFP Boron concentration = 3027 ppm Subtotal =

3 CORE COOLING Subtotal Condition

1.

Number of SG available for-DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 1 2

3.

Number of trains RHR available (0-2) 1 3

4 ELLOW"

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TEMP =770F; 24 days shutdown.

Subtotal =

3 RCS Level = Refueling Height RCS Time to Boil 25.5 lirs (Applicable at Cold or Refueling Shutdown>)

POWER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

1 and 345 kV levels)

(0-2) 2 4-5

2.

G-01 or G-02/A-05/B-03 available (0-1) 1..

G-03 or G-04/A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-I)

I Subtotal =

5 INVENTORY Subtotal Condition

1.

Pressurizer level 220 percent w/head on 0-1 RED (0-1) 0 2

ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 3 3

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 0 1nfor1atlon In this rerd wa dpfd Subtotal =

4 In arentrnn.

wit; t

ro Act, ex t'

Revision 2 101300 Page 1 of 9 Rdecrences: NP 10.3.6 NP 10.2.1 by e IC-

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15..D) (Containment Operable)

IITS TS 3.6.1) set

2.

Containment Closure CL-lE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut

( or 4) 0

( or 2) 2 (0-1) 0 Subtotal 0

l 2-3 4-5-6 Condition RED

( YELLOW]

(0-1) 1 Subtotal =

3 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)-

NOTE:

Take creditfor only one P-12 independent offsitepower source duringperiods of single X.03 or X-04 availability (*).

1.

"A' SFP cooling pump available with power available from:.

G-02 or G-01 via 2B-32 an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via IB-42

-(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Subtotal 0-1 2

3 4-5 (0-1) 1 Condition RED ORANGE QULW

,-ED (0-1) 1 (0-1) 1 (0-1) 1 (0-1) 0 SFP Temperatures:

NW 80 0F SE 77 OF SFP Average Tem'p 78.5 SFP Time to Boil 21 hrs Subtotal =

4 OF GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE: None LOOK AHEAD: 1X04 to be removed from service on 4127/04. Currently on hold due to procedure difficulties.

POWER AVAILABILITY will remain GREEN. SFP COOLING will become YELLOW.

PBF-1562 Revision 2 10130/02

References:

NP 103.6 NP 10.21 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND IRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

April 27, 2004 TIME:

1430 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

YELLOW YELLOW GREEN GREEN YELLOW GREEN I

PROTECTED EQUIPMENT:

I S.k I1 i

COMMENTS:

RCS Time to Boil is 25.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1,$

SF]P Time to Boil is 21 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br /> (full core off-load is assumed)

Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency I

I.

PBF-1562 Revision 2 10/30/02

References:

NP 103.6 NP 102.1 Page 5 of 9