ML051930150

From kanterella
Jump to navigation Jump to search
Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051930150
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 04/27/2004
From: Matthew Meyer
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051930150 (3)


Text

P'4 C.

S-teLat Point Beach Nuclcar Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

April 27. 2004 Time:

0350 Preparer:

Michael R Mevcr U

I R

28 NOTE:

Refer to base procedutre NP 10.3.6 for safety assessment checklist KSF definitions.

NOTE:

WIheneverfitel has been removed from the reactor vessel and refueling carity, all key safetyfunctions are GREEN except spent fuel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration = 3000 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Caivitv Boron concentration = 3016 ppm SFP Boron concentration = 3027 ppm Sul Subtotal Condition (0-1) 1 (0-2) 1 (0-1) 0 (0-1)

I 0-1 2

3-4 5

RED

,Sv Itotal =

3 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 1 2

3.

Number of trains RHR available (0-2) 1 3

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TEINP =78f.6F; 24 days shutdown, Subtotal =

3 RCS Level = Refueling Ileliglt RCS Time to Boil 25.5 hrs (Applicable at Cold or Refueling Shutdow n)

POWNER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

and 345 kV levels)

(0-2) 2 4-5

2.

G-01 or G-02/A-051B-03 available (0-1) 1 G-03 or G-041A-061B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time tb boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 1 Subtotal =

5 INVENTORY Subtotal Condition 1,

Pressurizer level 220 percent wlhead on 0-1 RED (0-1) 0 2

ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 3 3

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 0 Information in this record was deleted Subtotal =

4 in sccordinrp with tfe Froarinm nf Infnrvih;o~n A S_...

s

.... I L ACt, e laions

FOIcr, ark ran MYF-1562 Revision 2 1030/02.

I Page I' of 9

References:

NP 10.3.6 NP 10.2. 1

'S -%""

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.1.D) {Containment Operable) {ITS TS 3.6.1 ) set

2.

Containment Closure CL-lE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1) 0 Subtotal 0

2-3 4-5-6 Condition RED m

(0-1) 1 Subtotal =

3 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 independent offsite power source during periods of single X-03 or X-04 availability (*)

1.

"A" SEP cooling pump available with power available from:

G-02 or G-01 via 2B-32

.(*) an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via IB-42

-(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Subtotal Condition 0-1 RED 2

ORANGE (0-1) 1 3

M U'

(0-1) 1

  • 1 (0-1) 1 (0-1)

I (0-1) 0 Subtotal =

4 SFP Temperatures:

NW 80 0F SE 77

'F SFP Average Temp 78.5 SFP Time to Boil 21 hrs OF GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE: None LOOK AHEAD: 1X04 to be renoved from service on 427104. Currently on hold due to procedure difficulties.

POWER AVAILABILITY will remain GREEN. SFP COOLING evil[ become YELLOW.

PBF-1562 Revision 2 1O/30/02 Page 2 of 9

References:

NP 10.3.6 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

April 26, 2004 TIME:

1340 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

YELLOW YELLOW GREEN GREEN YELLOW GREEN PROTECTED EOUIP1%1ENT:

I COMMENTS:.

RCS Time to Boil is 25.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> SEP Time to Boil is 21 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br /> (full core off-load is assumed)

Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency V

PBF-1562 Revision 2 10/30/02 Reftences: NP 10.3.6 NP 10.2.1 Page S of 9