Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

'*.. April 26, 2004 Time:

1340 Preparer:

Kevin J Bennett U

I R

28 NOTE:

Refer to base procedure NP 10.3.6for safety assessment checklist KSF definitions.

NOTE:

Wh7 eneverfuel has been removedfrom the reactor vessel and refueling cavity, all key safety functions are GREEN except spentfuelpool cooling.

IKEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY

. 1.

RCS Boron concentration = 3005 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Cavity Boron concentration = 2999 ppm RFP fl,,1n1, s nng.nrntr n = 3nRinnm Q11 Subtotal Condition RED (0-1) 1 (0-2) 1 (0-1) 0 (0-1)

I 0-1 2

3-4 5.

,fntnl =

3 CORE COOLING Subtotal Condition

1.

Number of SC available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 1 2 -

3.

Number of trains RHR available (0-2) 1 3

e L

O

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 A

lt:S TEMIP =80"F; 23 days shutdown, Subtotal =

3 RCS Level = Refueling Height

RCS Time to Boil 25 Ihrs (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition l-Independent off-site power sources 1

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

and 345 kV levels)

(0-2) 2 4-5

2.

G-01 or G-021A-05/B-03 available (0-1) 1 G-03 or 0-04/A-06fB3-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 1 Subtotal =

5 INVENTORY Subtotal Condition

1.

Pressurizer level 220 percent wlhead on 0-1 RED (0-1) 0 2

ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 3 3

.3.

RCS level above REDUCED INVENTORY (0-1) 1 4

4.

Makeup from VCI/BLENDER and/or RWST available (0-2) 0 Information In this record was deleted Subtotal 4

a0VdIulf WU1UiT e frneeom nf Infnrmtd.n I#t Act, e tions-4

-'.. 'a llo0lui PBF 1562 Revision 2 1O/30lO2 Page 1 of`9

References:

NP 10.3.6 NP 10.2.1 5

k\\\\?a

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.1.D) IContainment Operable) (ITS TS 3.6.1 ) set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (0 or 2) 2 (0-1) 0 Subtotal 0

1 2-3

. 4-5-6 Condition RED (0-1) 1 Subtotal =

3 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take credit for only one P-12 independent offsite power source during periods of single X-03 orX-04 availability (*).

1.

"A" SFP cooling pump available with power available from:

G-02 or G-01 via 2B-32

.(*) an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-

-03 or G-04 via IB42

.{*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump. G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Subtotal 0-1 2

3 4-5 Condition RED ORANGE LyQ W

ram

-(0-1) -1I

.3 (0-1) i (0-1) 1 i

(0-1) 1 (0-1) 0 SFP Temperatures:

  • NW 78 OF SE 75 OF SFP Average Temp 76.5 SFP Tirne to Boil 21 hrs Subtotal =_ 4 OF GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE: None LOOK AHEAD: IX04 to be removed from service on 4/26/04. Currently on hold due to procedure difficulties.

POWER AVAILABILITY will remain GREEN. SFP COOLING vill become YELLOW.

i PBF-1562 Revision 2 10130/02 Page 2 of 9

References:

NP 10.3.6 NP 10.2.1

Point Beach Nucicar Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION OUTAGE SAFETY ASSESSMENT UNIT:

1 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:-

SFP COOLING:

DATE:

April 26,2004 YELLOW I

YELLOW GREEN GREEN YELLOW GREEN TIME:

PROTECTED EOUIPMENT:

RCS Time to Boil is 25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> SEP Time to Boil is 21 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br /> (full core off-load is assumed)

Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF-1562 Revision 2 10/30/02

References: