<-on t(kC-Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

April 25. 2004 Time:

1230 Preparer:

Jon lcik-er U

I R

28 NOTE:

Refer to baseprocedure NP 10.3.6forsafety assessment checklist KSFidefinitions.

NOTE:

Wheneverfuel has been removedfrom the reactor vessel and refueling cavity, all key safetyfunctions are GREEN except spentfuelpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, YesTfrue = I through 4

  • REACTIVITY
l.

RCS Boron concentration a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, V

RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Subtotal Condition RED (0-1) 1 (0-2) 1 (0-1) 0 (0-1)

I 0-1 2

5 Subtotal =

3 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 1 2

ORANGE

3.

Number of trains RHR available (0-2) 2 3

4.

RCS level above REDUCED INVENTORY (0-1) 1 RCS TE.MI' =86F; 22 days shutdown, Subtotal =

4 RCS Level = Refueling Height RCS Time to Boil 22.5 hrs (Applicable at Cold or Refueling Shutdown)

PONVER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV.

3 and 345 kV levels)

(0-2) 2 4GR

2.

G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 1 Subtotal =

5 INVENTORY Subtotal Condition

1.

Pressurizer level 220 percent wlhead on 0-1 RED (0-1) 0

.2 ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 3 3

3.

RCS level above REDUCED INVENTORY (0-1) 1 CG E

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 0 Subtotal =

4 Information in this record was deleted.

in accordance with He Freedom of Information Act, e utios PBF-1562 9A m

Revision 2 11a302 l Page 1 of 9 Refeirnces: NP to.3.6 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.1.D) (Containment Operable] {ITS TS 3.6.11 set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out V OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1) 0 Subtotal 0

4-5-6 Condition RED (0-1) 1 Subtotal =

3 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 independent offsitepower source during periods of single X-03 orX-04 availability (*).

1.

"A" SEP cooling pump available with power available from:

G-02 or G-01 via 2B-32

.(*) an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via IB42

-(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Subtotal 0-I 2

(0-1) 3 (0-l) iI (0-1) 1 (0-1) 1 (0-1) 0 Condition RED

.ORANGE YXMLal SFP Temperatures:

NW 76 OF SE 72 OF SFP Average Temp 74 SFP Time to Boil 21 hrs Subtotal =

4 GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

Reactivity and Containment are YELLOW during fuel motion.

SFP is being monitored during refueling operation.

Scheduled CVCS ivork eliminated charging flow paths for reactivity and inventory.

PBF-1562 Revision 2 10i30O2

References:

NP 10.3.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

April 25, 2004 TIME:

1230 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

YELLOW GREEN GREEN GREEN YELLOW GREEN PROTECTED EOUIPMENT:

lCOMMENTS:X RCS Time to Bo0il is 22.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, SFP Time to Boil is 2 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (full core off-load is assumed)

Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF-1562 Revision 2 10/30/02 Page 5 of 9 Rercences: NP 10.3.6 NP 10.2.1