Point Beach Nuclear Plant vs PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

April 25, 2004 Time:

. 0200 Preparer:

T. R. Branam U

I R

28 NOTE:

Refer to base procedure NP 10.3.6 for safety Aissessinent checklist KSF deftilitoh..

NOTE:

111leneverfitel has been removedfrom the reactor vessel and refueling cavitV, all key safe fitndions are GREEN except spentfiudlpool cooling.

]KEY SAFETY FUNCTION CRITERIA: No/False =0, Yes/True I through 4 REACTIVITY Subtotal Condition

1.

RCS Boron concentration = 2979 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron>boron concentration required by OP 3C (0-1) 1 0-1 RED

2.

Number ofboration paths.

(0-2) 2 2

3.

.No fuel motion.

(0-1) 0 3-4

(

YELLOWJ

4.

SR instrumentation operable (0-1) 1 5

Refueling Cavity Boron CConccIntrtionl 2999-.ppi SF o

Biroi Concentration e 3086 ppm Subtotal 4

4

" Aint o

i.

CORE COOLING Sut

-1.

Numnber of SG available for DHR (0-2) 0 0-1

2.

Refueling cavity filled (0-1) -

1 2

3.

Number of trains RHR available (0-2)

2.

3

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCSTEMP =88'F; 22 days shutdowvn, Subtotal.=

4 RCS Level - Refueling ireight; Pzr Level - 58 %

RCS Time to Boll 22.5 hrs (Appiicable at Cold or Refueling Shutdown) itotal Condition RED ORANGE POW ER AVAILABILITY,

1.

Independent off-site power sources available to A-05 and A-06 (totally independent at the 4160 V, 13.8 kV, and 345 kV levels)

2.

G-01 or G-02/A-05/B-03 available G-03 or G-04/A-06/B-04 available

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Subtotal Condition

.
RED.

'2 -

.ORANGE

  • (0-2)

.2 4-5 (0-): 1 (0-1) 1 (0-1)

I

. Subtotal =...5 INVENTORY Subtotal,.,

...,-Condition
  • 1 PrTessuriz lcvl e

peercent w/fhead on 0-1 RED

  • (01-)

0 2

'ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 3 3

3.

RCS level above REDUCED INVENTORY

-(0-)

1 4

4.

Makeup from VCT/BLENDER and'or RWST available (0-2) 1 Information in this rpnr W

Subtotal =

5 III dt;ucrudance Act, e;Wlptio, Freedom of Information PBF-1 562 Page I of 9 R.Rerceces: NP I NPI Is - \\ G,

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST I

CONTAINMENT

1.

Containment integrity (TS 15.1.D) {Containment Operable) (ITSTS'3.6.l)'set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

,-4.

DHR Capability:

cavityflooded and internals out OR at least'one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (Oor2) 2 '

-(0-1) 0 Subtotal 0

.2-3

-- 4-6' I.

' Condition.

RED

  • Owa (0-1) 1 Subtotal 3

SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND durinFg ULL CORE OFFLOADS)'

- NOTE:

Take creditfor only one P-12 independent offsitepowersoiirci durliniperod of1shgeX-03orX-04 avallabllf (*)

=

{

\\

.1.

"A" SFP cooling pump available with power available from:

G-02 or G-01 via 2B-32

-~"(*)

an independent off-site power source different than that for Train B below

2.

"B" SFP cooling pump available with power, available from:.

  • G-03 or G-04 via IB-42

.(*)

ain indeSendent off-site power source different than that for Train A above

  • Subtotal Condition 1.-

RED)

  • 2 ORANGE
  • (0-1)

I. '

3 C

z

'4-5 SRE

, (0-1 )

l1 3;.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1)

.1 (0-1)

I (0-1) 0 Subtotal 4

SFP Temperatures:

NW 77 OF SE 73 OF SFP Average Temp 75

-OF SFP Time to Boil' 21 hrs-9 GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

Reaictivity and Containmnnt are YELLOW during fuel motion.

'SFP is being monitored during refueling operation.

.L I

PBF-1562 Revision2 10/30/02 Page 2 of 9 Refiereces: NP I NP I

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

April 25, 2004.

TIME:

0200 KEY SAFETY FUNCTIONS:

REACTIVITY:

YELLOI CORE COOLING:

GREEN POWER AVAILABLE:

GREEN INVENTORY:

GREEN TV CONTAINMENT:

SFP COOLING:

YELLOW GREEN

.i PROTECTED E OUIPMENT:

OMMENTS:

Unit I is in Mode 6 Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency RCS Time to Boil is 22.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> SFP Time to Boil is 21 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br /> (Full core off-load is assumed)

Refueling Cavity is at Refueling Height Hot Leg Vent Path is the Pressurizer manway Reactivity and Containment are yellow during fuel movement.

PBF-1562 Revsion 2 10130/02 RefCrences: NP 10.3.6 NP 10.2.1 Page 5 or9