Text
I I
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:
April 24,2004 Time:
1400 Preparer:
Aindrea Lon cston U
I R
28 NOTE:
Refer to base procedure NP 10.3.6for safety assessment checklist KSF definitions.
NOTE:
Wheneverfuel has been removed from the reactor vessel and refueling cavity, all key safetyfunctions are GREEN except spentfuelpool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True =I through 4 REACTIVITY
- 1.
RCS Boron concentration = 2979 ppm a.)
For RSD, RCS boron >Refueling boron.
concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)
For CSD and prior to RSD no fuel motion, RCS boron> boron concentration required by OP 3C.
(0-1) 1
- 2.
Number of boration paths (0-2) 2
- 3.
No fuel motion (0-1).
1
- 4.
SR instrumentation operable (0-1) 1 Subtotal Condition 0-1 RED 2
ORANGE 34 SA 5
o Subtotal 5
CORE COOLING Subtotal Condition
- 1.
Number of SG available for DHR (0-2) 0 0-1 RED
- 2.
Refueling cavity filled (0-1) 1 2
ORANGE
- 3.
Number of trains RHR available (0-2) 2 3
- 4.
RCS level above REDUCED INVENTORY (0-1) 1 4-5 C GREE N RCS TEMP =887F; 21 days shutdown, Subtotal 4
RCS Level = Refueling Height RCS Time to Boil 22 hrs (Applicable at Cold or Refueling Shutdown)
POWER AVAILABILITY Subtotal Condition
- 1.
Independent off-site power sources I
RED.
available to A-05 and A-06 (totally 2
ORANGE independent at the 4160 V. 13.8 kV, 3
and 345 kV levels)
(0-2) 2 4-5
- 2.
G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1
- 3.
G-05 available, Reactor Cavity filled to 2 23 R above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(0-1)
I Subtotal =
5 INVENTORY Subtotal Condition
- 1.
Pressurizer level 220 percent w/head on 0-1 RED (0-1)
. 0 2
ORANGE
- 2.
Refueling Cavity filled (see definition)
(0-3) 3 3
- 3.
RCS level above REDUCED INVENTORY (0-1) 1 4
C_
E
- 4.
Makeup from VCT/BLENDER and/or RWST available (0-2) 1 Information In this record was deleted Subtotal 5
in acrnrnfnnr with the I-roarinm nt Intnrmntinn klA.J t~.
4 VI94CJ19IUSVI Art-arpmnai PBF-1562 Revision 2 1o030'0:
ge 1 of 9
References:
NP 10.3.6 NP 10.2.1
~\\ ko
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT
- 1.
Containment integrity (TS 15.1 D) IContainment Operable) [ITS TS 3.6.1) set
- 2.
Containment Closure CL-1E maintained and closure < time to boil
- 3.
No fuel motion
- 4.
DHR Capability:
cavity flooded and internals out at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (Oor4) 0 (Oor2) 2 (0-1)
I Subtotal 0
l 2-3 4-5-6 Condition RED ORANGE YAmLE (0-1) 1 Subtotal =
4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
NOTEE:
Take credit for only one P-12 independent offsite power source during periods of single X-03 orX-04 availability (*).
Subtotal Condition
- 1.
"A" SFP cooling pump available 0-1 RED with power available from:
2 ORANGE G-02 or G-01 via 2B-32 (0-1) n/a 3
YELLOW
'()
an independent off-site power 4-5 GREEN source different than that for Train B below
- 2.
"B" SFP cooling pump available with power available from:
G-03 or G-04 via B1-42
.(*) an independent off-site power source different than that for Train A above
.3.
Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(0-I) n/a (0-1) nta (0-1) n/a (0-1) nra SFP Temperatures:
NW n/a OF SE n/a OF SFP Average Temp n/a SFPTime to Boil n/a Subtotal =
n/a OF GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
We will start monitoring SFP Cooling as soon as fuel motion starts. This is projected for 1500.
PBF-1562 Revision 2 10/3LYD2
References:
NP 103.6 NP 1021 Page 2 of 9
Point Beach Nuclear Plant PBNP'SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST i.
OUTAGE SAFETY ASSESSMENT UNIT:
1 DATE:
April 24, 2004 TIME:
1400 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
GREEN GREEN POWER AVAILABLE:
GREEN INVENTORY:
CONTAINMENT:
SFP COOLING:
GREEN GREEN NA PROTECTED EOUIPMENT:
COMMENTS:
Unit I is in Mode 6 Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency RCS Time to Boll is 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> Refueling Cavity is full Hot Leg Vent Path is the Pressurizer manway PBF-1562 Revision 2 10/3lV2 Refrezncrs: NP 103.6 NP 10.2.1 Page S of 9