Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST c~ 31Oc9 Date:

April 23, 2004 Time:

1400 Preparer Andrea Lonsgion U

I R

28 NOTE:

Refer to base procedure NP 10.3.6for safety assessment checklist KSF definitions.

NOTE:

Wheneverfuel has been removed from the reactor vessel and refueling cavity, all key safety functions are GREEN except spentfuelpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False =0, Yes/True = I through 4 REACTIVITY Subtotal Condition

1.

RCS Boron concentration = 2889 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1 0-1 RED

2.

Nu'mber of boration paths (0-2) 1 2

3.

No fuel motion (0-1) 0 3-4

4.

SR instrumentation operable (0-1) 1 5

Subtotal =

3 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 1 2

ORANGE

3.

Number of trains RHR available (0-2) 2 3

0

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 gR EN RCS TEMP = 92'F; 20 days shutdown, Subtotal =

4 RCS Level = Upper Vessel Internal Lift Height RCS Time to Boil 19'hrs (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition 1..

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

and 345 kV levels)

(0-2).

2 4-5

2.

G-01 or G-02/A-05/B-03 available (0-1) -

1 G-03 or G-04/A-061B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal =

4 INVENTORY Subtotal Condition

1.

Pressurizer level 220 percent w/head on 0-1 RED (0-1) 0 2

ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 2 3

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

G E

4.

Makeup from VC1/BLENDER and/or RWST available (02) 1 Information In this record was deleted Subtotal =

4 as avvusL vvl

,i!11luy MICUZ1011 Ul IiflUfflidtuUII PBF-1562 FI.6 N

Revision 2 101'3G/O2I Page 1 of 9

References:

NP 10.3.6 NP 10.2W1 Sailor

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.1.D) I Containment Operablel {ITS TS 3.6.11 set

2.

Containment Closure CL-1E maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut

( or 4) 0

( or 2) 2 (0-1) 0 Subtotai 0

1 2-3 4-5-6 Condition RED JaACIE (0-1) 1 Subtotal =

3 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 independent offsite power source during periods of single X-03 or X-04 availability (*).

Subtotal Condition I

'A' SFP cooling pump available 0-1

,RED with power available from:

2' ORANGE G02 or G-01 via 2B-32 (0-1) nWa 3

YELLOW

-(*) an independent off-site power 4-5 GREEN source different than that for Train B below

2.

'B" SFP cooling pump available with power available from:

G-3 or G-4 via IB-42

-(*) an independent off-site power source different thari that for Train A above

,3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil a 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) n/a (0-I) nia (0-1)

Wja (0-1)

Dia Subtotal =

n/a SFP Temperatures:

NW n/a

-OF SE nWa

-OF SFP Average Temp nWa SFP Time to Boil nWa OF I

GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

Reactivity and Containment are YELLOW for upper internals lift. After the upper internals lift is completed, Reactivity and Containment will turn GREEN. Sump B is being credited for INVENTORY with'only one makeup path available. RWST level is

<16% so the only REACTIITY path is through the BAST's and the P-2C pump and AUX. CHG. lines. INVENTORY flow path is through the RMW/BAST's through the P-2C and AUX. CHG. lines.

PBF-1562 Revision 2 10/30'02 Rererences: NP 103.6 NP 10.2.1 Page 2 of 9

I.

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

April 23, 2004 TIME:

1400 KEY SAFETY FUNCTIONS:

REACflVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

YELLOW GREEN GREEN GREEN CONTAINMENT:

SEP COOLING:

YELLOW NA TECTED EOUIPMENT:

COMMENTS:

Unit I is in Mode 6 Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention RCS Time to Boil Is 19 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br /> RCS Cavity Level is at Upper Vessel Internal Lift Height Hot Leg Vent Path is the Pressurizer manway PBF-1562 Revision 2 10/30/02

References:

NP 10.3.6 NP 102.1 Page 5 of 9