Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST c~ 31Oc9 Date:
April 23, 2004 Time:
1400 Preparer Andrea Lonsgion U
I R
28 NOTE:
Refer to base procedure NP 10.3.6for safety assessment checklist KSF definitions.
NOTE:
Wheneverfuel has been removed from the reactor vessel and refueling cavity, all key safety functions are GREEN except spentfuelpool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False =0, Yes/True = I through 4 REACTIVITY Subtotal Condition
- 1.
RCS Boron concentration = 2889 ppm a.)
For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)
For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1 0-1 RED
- 2.
Nu'mber of boration paths (0-2) 1 2
- 3.
No fuel motion (0-1) 0 3-4
- 4.
SR instrumentation operable (0-1) 1 5
Subtotal =
3 CORE COOLING Subtotal Condition
- 1.
Number of SG available for DHR (0-2) 0 0-1 RED
- 2.
Refueling cavity filled (0-1) 1 2
ORANGE
- 3.
Number of trains RHR available (0-2) 2 3
0
- 4.
RCS level above REDUCED INVENTORY (0-1) 1 4-5 gR EN RCS TEMP = 92'F; 20 days shutdown, Subtotal =
4 RCS Level = Upper Vessel Internal Lift Height RCS Time to Boil 19'hrs (Applicable at Cold or Refueling Shutdown)
POWER AVAILABILITY Subtotal Condition 1..
Independent off-site power sources I
RED available to A-05 and A-06 (totally 2
ORANGE independent at the 4160 V, 13.8 kV, 3
and 345 kV levels)
(0-2).
2 4-5
- 2.
G-01 or G-02/A-05/B-03 available (0-1) -
1 G-03 or G-04/A-061B-04 available (0-1) 1
- 3.
G-05 available, Reactor Cavity filled to 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(0-1) 0 Subtotal =
4 INVENTORY Subtotal Condition
- 1.
Pressurizer level 220 percent w/head on 0-1 RED (0-1) 0 2
ORANGE
- 2.
Refueling Cavity filled (see definition)
(0-3) 2 3
- 3.
RCS level above REDUCED INVENTORY (0-1) 1 4
G E
- 4.
Makeup from VC1/BLENDER and/or RWST available (02) 1 Information In this record was deleted Subtotal =
4 as avvusL vvl
,i!11luy MICUZ1011 Ul IiflUfflidtuUII PBF-1562 FI.6 N
Revision 2 101'3G/O2I Page 1 of 9
References:
NP 10.3.6 NP 10.2W1 Sailor
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT
- 1.
Containment integrity (TS 15.1.D) I Containment Operablel {ITS TS 3.6.11 set
- 2.
Containment Closure CL-1E maintained and closure < time to boil
- 3.
No fuel motion
- 4.
DHR Capability:
cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut
( or 4) 0
( or 2) 2 (0-1) 0 Subtotai 0
1 2-3 4-5-6 Condition RED JaACIE (0-1) 1 Subtotal =
3 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
NOTE:
Take creditfor only one P-12 independent offsite power source during periods of single X-03 or X-04 availability (*).
Subtotal Condition I
'A' SFP cooling pump available 0-1
,RED with power available from:
2' ORANGE G02 or G-01 via 2B-32 (0-1) nWa 3
YELLOW
-(*) an independent off-site power 4-5 GREEN source different than that for Train B below
- 2.
'B" SFP cooling pump available with power available from:
G-3 or G-4 via IB-42
-(*) an independent off-site power source different thari that for Train A above
,3.
Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil a 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(0-1) n/a (0-I) nia (0-1)
Wja (0-1)
Dia Subtotal =
n/a SFP Temperatures:
NW n/a
-OF SE nWa
-OF SFP Average Temp nWa SFP Time to Boil nWa OF I
GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
Reactivity and Containment are YELLOW for upper internals lift. After the upper internals lift is completed, Reactivity and Containment will turn GREEN. Sump B is being credited for INVENTORY with'only one makeup path available. RWST level is
<16% so the only REACTIITY path is through the BAST's and the P-2C pump and AUX. CHG. lines. INVENTORY flow path is through the RMW/BAST's through the P-2C and AUX. CHG. lines.
PBF-1562 Revision 2 10/30'02 Rererences: NP 103.6 NP 10.2.1 Page 2 of 9
I.
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
I DATE:
April 23, 2004 TIME:
1400 KEY SAFETY FUNCTIONS:
REACflVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
YELLOW GREEN GREEN GREEN CONTAINMENT:
SEP COOLING:
YELLOW NA TECTED EOUIPMENT:
COMMENTS:
Unit I is in Mode 6 Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention RCS Time to Boil Is 19 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br /> RCS Cavity Level is at Upper Vessel Internal Lift Height Hot Leg Vent Path is the Pressurizer manway PBF-1562 Revision 2 10/30/02