Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051920303
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 04/23/2004
From: Legreve M
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051920303 (3)


Text

I .<- lul Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: April 23, 2004 Time: 0300 Preparer: Mike LeGreve U I R 28 NOTE: Refer to baseprocedureNP 10.3.6for safety assessment checklist KSFdefinitions.

NOTE: 117heneverfuel has been removed front the reactorvessel and refueling cavit, all key safetyfunctions are GREEN excentspentfuelpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY Subtotal Condition

1. RCS Boron concentration = 2889 ppm a.) For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.) For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1 0-1 RED
2. Number of boration paths (0-2) 2 2 9QAAL
3. No fuel motion (0-1) 0 3-4
4. SR instrumentation operable (0-1) 1 5 <;ZD Subtotal 4 CORE COOLING Subtotal Condition
1. Number of SG available for DHR (0-2) 0 0-1 RED
2. Refueling cavity filled (0-1) 1 2 ORANGE
3. Number of trains RHR available (0-2) 2 3
4. RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TEMP = 95'F; 20 days shutdowyn, Subtotal 4 RCS Level - Control Rod Latch Height RCS Time to Boil 19 hrs (Applicable at Cold or Refueling Shutdown)

POWVER AVAILABILITY Subtotal Condition

1. Independent off-site power sources I RED available to A-05 and A-06 (totally . 2 ORANGE independent at the 4160 V, 13.8 kY, 3 and 345 kV levels) (0-2) 2 4-5.
2. G-01 or G-02/A-05B-03 available . - (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1
3. G-05 available, Reactor Cavity filled to 2 23 Pt above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 0 Subtotal 4 INVENTORY Subtotal Condition
1. Pressurizer level 220 percent wlhead on 0-1 RED (0-1) 0 2 ORANGE
2. Refueling Cavity filled (see definition) (0-3) 1 31
3. RCS level above REDUCED INVENTORY (0-1) 1 4
4. Makeup from VCTIBLENDER and/or RWST available (0-2) 2 Subtotal = 4 Information in this rornrnm w-n aran e _.h i eF edo nfn Act exe re f Information PBF-1562 FrOr a

References:

NP 10.3.6 Revision 2 10/30102 Page I of 9 NP 10.2.1

-G-t03

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT Subtotal Condition

1. Containment integrity (TS 15.1.D) (Containment 0 RED Operable) (ITS TS 3.6.1} set (Oor 4) 0 l
2. Containment Closure CL-lE maintained 2-3 anAc =

and closure < time to boil (Oor 2) 2 4-5-6

3. No fuel motion (0-1) 0
4. DHR Capability:

- cavity flooded and internals out V\

OR

- at least one SG available OR

- one fan cooler wit3 Equip hatch installed and personnel hatches capable of being shut (0-1) 1 Subtotal = 3 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE: Take creditoronly one P-12 independentoffsite power source duringperlodsof singleX-03 or X-04 availablty (').

Subtotal Condition

1. "A"SFP cooling pump available 0-1 RED with power available from: 2 ORANGE

- G-02 or G-0I via 2B-32 (0-1) n/a 3 YELLOW t) an independent off-site power 4-5 GREEN source different than that for Train B below (0-1) n/a

2. "B" SFP cooling pump available with power available from:

- G-03 or G004 via IB-42 (0-1) n/a an independent off-site power source different than that for Train A above (0-1) n/a

3. Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil Ž 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) n/a SFP Temperatures: Subtotal = n/a NW n/a OF SE n/a DF SFP Average Temp n/a SFP.Time to Boil n/a GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

Core Cooling and Inventory changed to GREEN once reactor cavity water level reached the rod latch height, 4/22 @ 1830 (verification completed at 1945).

Reactivity and Containment Key Functions both changed to YELLOW upon start of Control Rod Unlatching, 4/23 @ 0201.

Reactivity and Containment will return to GREEN upon completion of rod unlatching and then again turn YELLOW for upper internals lift.

PBF-1562

References:

NP 10.3.6 Revision 2 10/30/02 Page 2 of 9 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: 1 DATE: April 23, 2004 TIME: 0300 KEY SAFETY FUNCTIONS:

REACTIVITY: YELLOW CORE COOLING: GREEN POWER AVAILABLE: GREEN INVENTORY: GREEN CONTAINMENT: YELLOW SFP COOLING: NA PROTECTED EOUIPNIIENT:

Uniti IsinMode6 Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency RCS Time to Boil is 19 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br /> RCS Cavity Level is at Rod Latch Height Hot Leg Vent Path Is the Pressurizer manway PBF-1562

References:

NP 103.6 Revision2 103002 Page 5 of 9 NP 102.1